Loading page content…
Loading page content…
Loading contract search results…
Loading contract details…
| Source: | Contracts Finder |
| Notice Type: | Award notice |
| Buyer: | Kent County Council |
| Main Category: | Works |
| Procurement Method: | Open procedure |
| Tender Status: | Closed |
| Estimated Value (ex. VAT): | £178,300 |
Awarded to
| Award value: | £178,300 |
| Award decision date: | 15 November 2024 |
| Award status: | Active |
The "Folkestone - A Brighter Future" scheme seeks to 'level up' Folkestone's town centre by supporting active travel, creating a high-quality environment that supports civic pride and reverses years of disparity in investment by transforming the fortunes of the towns primary retail areas. The requirement of this contract of works is to design and manufacture the superstructure of a pedestrian footbridge to connect Guildhall Street North to Shellons Street. A footbridge is proposed to link Guildhall Street North and Shellons Street more-directly near the location of its pedestrian crossing, to re-establish the link which was severed by the construction of the A2033 link (Foresters Way and Shellons Street). Previously an earthwork ramp solution was considered for providing this link but due to challenges associated with this proposal, such as the impact on existing services and the level of visual intrusion it would cause, the footbridge structure was proposed by AECOM as it is considered to be a better solution. The superstructure contractor will need to work closely with Aecom (design consultant), who are responsible for designing the substructure for the bridge to ensure that the design of the superstructure and substructure are coordinated. Two Agreement in Principle (AIP) submissions will need to be made for the KCC Structures Technical Approval Process (TAP), Aecom (as the substructure Designer) will prepare the submission for the substructure, but the superstructure contractor will need to prepare the submission for the superstructure. It will be essential for Aecom and the superstructure contractor to work closely to ensure that the submissions are made at the same time and are co-ordinated.
Published contracts in the last 12 months
368
total contracts
£15472.1m
total value
£113,765,559
average contract size
Typical categories
Pipeline status
Not addedImports the contract into your BidWriter pipeline · Qualify before you commit to bid
Application Deadline
11 October 2024
Closed
Estimated Value
£178,300
Need help writing this bid?
Our specialists write winning tender responses. Free consultation, no obligation.
Book a free consultation →| Release Date: | 6 December 2024 |
| Application Deadline: | 11 October 2024 |
| Contract Start Date: | 29 November 2024 |
| Contract End Date: | 28 February 2028 |
| Contract Duration: | 3.3 years |
| Procurement ID (OCID): | ocds-b5fd17-879a545b-4276-4d50-b41f-867fcc59a0b0 |
| Notice Reference: | 464019c8-ccbb-486a-b25d-761110d21ed3-808737 |
View Original Notice
Access the full notice on the official portal