| Source: | Contracts Finder |
| Notice Type: | Tender notice |
| Buyer: | THE PIRBRIGHT INSTITUTE |
| Main Category: | Services |
| Procurement Method: | Open procedure (above threshold) |
| Tender Status: | Closed |
Pipeline status
Not addedImports the contract into your BidWriter pipeline · Qualify before you commit to bid
Application Deadline
11 October 2024
Closed
Estimated Value
£405,000
Need help writing this bid?
Our specialists write winning tender responses. Free consultation, no obligation.
Book a free consultation →| Estimated Value (ex. VAT): |
| £405,000 |
| Release Date: | 9 September 2024 |
| Application Deadline: | 11 October 2024 |
| Contract Start Date: | 21 November 2024 |
| Contract End Date: | 28 November 2025 |
| Contract Duration: | 1.0 years |
| Procurement ID (OCID): | ocds-b5fd17-3b4b7eb9-41ef-4eb3-9581-d95bba7a4e4f |
| Notice Reference: | 68f650ff-b91d-4efe-b3a2-4c0ec9c59c2b-783125 |
All 3 notices for this procurement, oldest first.
ISO 11 Incinerator Life Extension Project - WP 5 Refractory Replacement
ISO 11 Incinerator Life Extension Project - WP 5 Refractory Replacement
ISO 11 Incinerator Life Extension Project - WP 5 Refractory Replacement
Earlier notices predate the Procurement Act 2023 (commenced 24 Feb 2025) and therefore don't carry UK1–UK17 codes.
View Original Notice
Access the full notice on the official portal
Awarded to
| Award value: | £454,525 |
| Award decision date: | 21 November 2024 |
| Award status: | Active |
Design and Build of Work re. Incinerator Kiln Refractory Lining replacement for the Primary and Secondary Combustion Chambers. The scope of works will involve: • Detailed design and configuration of the new refractory lining and anchors based on the existing plant, drawings and documentation. • Supply and delivery of all refractory materials and anchors including any materials used for forming, moulding, and support structure (e.g. wood, polystyrene) and 1 tonne waste bags with sealable tops. • Deconstruction of existing refractory lining and Anchors (Disposal of waste by others) • Installation of the new anchors and refractory lining as per agreed detailed design. • Management of drying out and curing of the lining. • Management of all subcontractors employed by the supplier to complete these works. • Submission of O&M containing all required details as per PIF and separate section to provide information needed for the Health and Safety File. Please see Contract Scope section in ITT document. Additional information: Please note that Appendix H - Confidentiality Agreement must be completed, signed, and emailed to [email protected] asap. Then and only then will access to the full ITT package (Appendix E1 - Site Documents, Appendix E2 - Incinerator Dimensions and Appendix E3 - Front Plate Technical Datasheets) be granted to the requester.
Published contracts in the last 12 months
76
total contracts
£4.6m
total value
£171,127
average contract size
Typical categories
Site Steam Management and Boiler Maintenance
THE PIRBRIGHT INSTITUTE · WAC-641586
ISO11 Fumigation Lobby Replacement Project - Civil Works and CDM Principal Designer/Principal Contractor Role
THE PIRBRIGHT INSTITUTE · WAC-640378
ISO11 Fumigation Lobby and Dedicated Air Handling Unit (AHU)
THE PIRBRIGHT INSTITUTE · WAC-640379