| Buyer: | THE PIRBRIGHT INSTITUTE |
| Main Category: | Services |
| Procurement Method: | Open procedure (below threshold) |
| Tender Status: | Closed |
| Estimated Value (ex. VAT): |
Awarded to
| Award value: | £89,730 |
| Award decision date: | 14 July 2024 |
| Award status: | Active |
The contract is for a single supplier to provide Project Management in relation to ISO 11 Incinerator life extension project at The Pirbright Institute, Ash Road, Pirbright, Surrey, GU24 0NF. PROJECT SCOPE AND OBJECTIVES The primary objective of the project is to ensure ISO 11 has an incinerator available to operate, which is safe, reliable and will serve the building for a minimum of 10 years (Based on projected building lifespan). The project will address the issues identified in the HAZOP study as per Appendix 2 of the Outline Business Case. There are a total of 12 (Twelve) Work packages, not including Project Management within the overall project. The following 10 (Ten) Work Packages will require procurement and delivery under the scope of Project Management: - WP2: Replace Incinerator Control System with new Open Protocol system, compatible with current standards and compliant with HAZOP. - WP3: Replace Continuous Emissions Monitoring System (CEMS) and Secondary chamber Oxygen monitoring with new system(s), compliant with all current standards. - WP5: Incinerator kiln refractory lining upgrade to the Primary and Secondary Combustion Chambers. - WP6: Diesel fuel system upgrade and fuel tank replacement. - WP7: Carry out appropriate technical assessment, such as HAZOP, LOPA, SIL assessment. - WP9: Carry out upgrade to primary kiln catch box to where necessary. - WP10: Upgrade incinerator loading system hydraulics to make compliant with current standards and to add provision of manual override. - WP11: All necessary commissioning and necessary environmental testing (QAL 2 examination under Waste Incineration Directive). Update of all existing statutory licenses and environmental permit (enforced with Guildford local council). - WP12: The Principal Contractor and Designer roles under Construction Design Management regulations: 2015 + design consultancy. - WP13: Legal representation to assist with the various contracts.
Published contracts in the last 12 months
76
total contracts
£4.6m
total value
£171,127
average contract size
Typical categories
Site Steam Management and Boiler Maintenance
THE PIRBRIGHT INSTITUTE · WAC-641586
ISO11 Fumigation Lobby Replacement Project - Civil Works and CDM Principal Designer/Principal Contractor Role
THE PIRBRIGHT INSTITUTE · WAC-640378
ISO11 Fumigation Lobby and Dedicated Air Handling Unit (AHU)
THE PIRBRIGHT INSTITUTE · WAC-640379
Pipeline status
Not addedImports the contract into your BidWriter pipeline · Qualify before you commit to bid
Application Deadline
17 June 2024
Closed
Estimated Value
£75,000
Need help writing this bid?
Our specialists write winning tender responses. Free consultation, no obligation.
Book a free consultation →| £75,000 |
| Release Date: | 10 September 2024 |
| Application Deadline: | 17 June 2024 |
| Contract Start Date: | 14 July 2024 |
| Contract End Date: | 31 December 2025 |
| Contract Duration: | 1.5 years |
| Procurement ID (OCID): | ocds-b5fd17-a97d2cff-5d2a-4e75-88b0-619382d26193 |
| Notice Reference: | 121ee543-46e5-4a71-b6c6-3d5db866e2e3-784331 |
All 3 notices for this procurement, oldest first.
ISO 11 Incinerator life extension - Project Management
ISO 11 Incinerator life extension - Project Management
ISO 11 Incinerator life extension - Project Management