Loading page content…
Loading page content…
Loading contract search results…
Loading contract details…
| Source: | Contracts Finder |
| Notice Type: | Award notice |
| Buyer: | Historic England |
| Main Category: | Works |
| Procurement Method: | Open procedure |
| Tender Status: |
Pipeline status
Not addedImports the contract into your BidWriter pipeline · Qualify before you commit to bid
Application Deadline
2 February 2024
Closed
Estimated Value
£200,000
Need help writing this bid?
Our specialists write winning tender responses. Free consultation, no obligation.
Book a free consultation →| Closed |
| Estimated Value (ex. VAT): | £200,000 |
| Release Date: | 19 September 2024 |
| Application Deadline: | 2 February 2024 |
| Contract Start Date: | 22 September 2024 |
| Contract End Date: | 24 January 2025 |
| Contract Duration: | 4 months |
| Procurement ID (OCID): | ocds-b5fd17-1fb654d4-85bd-4c08-8102-bbad8d736aac |
| Notice Reference: | fe53ee83-5e5e-4296-be67-1df0b69bd9e5-786777 |
All 2 notices for this procurement, oldest first.
Fire Upgrading and General Upgrading to the MT Building at Fort Cumberland (Open) - AWARD
Fire Upgrading and General Upgrading to the MT Building at Fort Cumberland (Open) - AWARD
Earlier notices predate the Procurement Act 2023 (commenced 24 Feb 2025) and therefore don't carry UK1–UK17 codes.
View Original Notice
Access the full notice on the official portal
Awarded to
| Award value: | £559,023 |
| Award decision date: | 17 September 2024 |
| Award status: | Active |
The project consists of various works to the MT Building, set within the wider context of Fort Cumberland. Although the MT building is not independantly listed and doesn't fall within the scheduling of Fort Cumberland, the external fabric of the MT building is subject to listed buiding consent as the building is in the curtiledge of the Fort. Fort Cumberland is a Scheduled Monument and a Grade II* listed building. A listed building application for the external works of this project has already been submitted to Portsmouth City Council planning office. The evaluation date is advised as the 17th January 2024. Works include: fire upgrading works including installation of fire dampers, firestopping, upgrading of fire doors; minor upgrades to electrical installation; alterations to the layout of the existing WC's; relocation of fume cupboard space; merging of two rooms into one, that will require an upgrade to the rooms air conditioning system; internal decoration and upgrading of finishes; internal repairs; partial re-roofing.
Published contracts in the last 12 months
170
total contracts
£5.3m
total value
£83,447
average contract size
Typical categories