Loading page content…
Loading page content…
| Source: | Contracts Finder |
| Buyer: | Aspire Housing |
| Main Category: | Works |
| Procurement Method: | Restricted procedure |
| Tender Status: | Complete |
| Estimated Value (ex. VAT): | Not specified |
| Release Date: | 3 October 2024 |
| Application Deadline: | 29 August 2024 |
The complete works to provide replacement of primary heating system boiler plant, along with amendments to the existing buildings: electrical systems, HVAC controls systems, above ground drainage, domestic services cold water, gas distribution and plant room ventilation systems, etc, to enable the plant replacement. The scope is also to include works to overhaul the existing HVAC Controls, AC systems, and supply AHU ventilation systems serving the building, with the intent to make existing HVAC controls, and AC fully operational. In addition, the works shall include for addition of new localised air circulation fans to 3No meeting room 'booth' rooms, to ensure suitable air movement and prevent stagnation of air in the rooms when in use. The works shall include all Mechanical, Electrical, associated Builders Works, making good works, structural works (if required) decoration works, controls, etc, referred to herein and as shown on the tender drawings, For other General definitions pertaining to the Contract please refer to the Contract Administrator Lead document.
Published contracts in the last 12 months
62
total contracts
£22.1m
total value
£1,700,923
average contract size
Typical categories
Pipeline status
Not addedContract imported automatically · AI writes the response
Application Deadline
29 August 2024
Closed
Need help writing this bid?
Our specialists write winning tender responses. Free consultation, no obligation.
Book a free consultation →| Procurement ID (OCID): | ocds-b5fd17-b33c4612-1efa-440e-b80c-5c7ed8794213 |
| Notice Reference: | 8a596a51-3efb-43d6-b024-850b12ac0b2e-790553 |
View Original Notice
Access the full notice on the official portal