Loading page content…
Loading page content…
Loading contract search results…
Loading contract details…
| Source: | Contracts Finder |
| Notice Type: | Award update |
| Buyer: | Ministry of Justice |
| Main Category: | Works |
| Procurement Method: | Call-off from a framework agreement |
| Tender Status: | Closed |
| Estimated Value (ex. VAT): |
Pipeline status
Not addedImports the contract into your BidWriter pipeline · Qualify before you commit to bid
Application Deadline
19 April 2024
Closed
Estimated Value
£442,800
Need help writing this bid?
Our specialists write winning tender responses. Free consultation, no obligation.
Book a free consultation →| £442,800 |
| Release Date: | 31 October 2024 |
| Application Deadline: | 19 April 2024 |
| Contract Start Date: | 29 October 2024 |
| Contract End Date: | 8 May 2026 |
| Contract Duration: | 1.6 years |
| Procurement ID (OCID): | ocds-b5fd17-383d3697-56c1-4ce5-a66f-10baa4a7ee83 |
| Notice Reference: | b5bfbaaf-d24a-4018-9ae0-0dbbd97edfff-798890 |
All 3 notices for this procurement, oldest first.
HMPPS Eastwood Park Video Conferencing Centre (VCC) BPRN532121/7726 (Retender)
HMPPS Eastwood Park Video Conferencing Centre (VCC) BPRN532121/7726 (Retender)
HMPPS Eastwood Park Video Conferencing Centre (VCC) BPRN532121/7726 (Retender)
Earlier notices predate the Procurement Act 2023 (commenced 24 Feb 2025) and therefore don't carry UK1–UK17 codes.
View Original Notice
Access the full notice on the official portal
Awarded to
| Award value: | £442,800 |
| Award decision date: | 29 October 2024 |
| Award status: | Active |
Provide a new VCC facility to replace the existing PCVL building. The new facility should be designed in line with the VCC Design Guide. There is a requirement to construct a temporary PCVL building for the duration of the project. The scope of works included the demolition of the existing PCVL building and site preparation (inc new access gate). The existing services were due to be relocated to allow for the updated design. A new purpose built building consisting of a steel frame with brick cladding and internal block work walls. The building would consist of a ground floor and first floor roof space which serves as a plant area. This would be accessed via an internal staircase. The plant would consist of Air handling unit and heating and hot water would be provided via an air source heat pump. The ground floor consists of a holding room/access area, wing office, toilet facilities, IT room, VCC suites and a domestic visits area. A constructor has been appointed for the design and build of the project. This is a two stage Design and Build Contract let under the PPC2000 (Amended 2013) Form of contract. The original estimated value of the contract was calculated by MOJ, and its Cost Consultants following desktop and non-intrusive surveys and was based on information reasonably known at the time and arrived at via a thorough and appropriate methodology. The first stage will involve the constructor providing Pre-construction surveys and design services at a cost of £442,800. It is expected that the total construction cost of the project will be c£5m.
Published contracts in the last 12 months
1,058
total contracts
£276477.8m
total value
£389,954,573
average contract size
Powder Coating System for Prison Industries Workshop at HMP Wymott
Ministry of Justice · WAC-639650
Powder Coating System for Prison Industries Workshop at HMP Wymott
Ministry of Justice · WAC-638772
The Supply of Injection moulding Machines to HMP Ranby
Ministry of Justice · WAC-638402