| Source: | Contracts Finder |
| Notice Type: | Tender amendment |
| Buyer: | THE PIRBRIGHT INSTITUTE |
| Main Category: | Works |
| Procurement Method: | Open procedure (below threshold) |
| Tender Status: | Closed |
Pipeline status
Not addedImports the contract into your BidWriter pipeline · Qualify before you commit to bid
Application Deadline
9 December 2024
Closed
Estimated Value
£45,000
Need help writing this bid?
Our specialists write winning tender responses. Free consultation, no obligation.
Book a free consultation →| Estimated Value (ex. VAT): |
| £45,000 |
| Release Date: | 29 November 2024 |
| Application Deadline: | 9 December 2024 |
| Contract Start Date: | 20 January 2025 |
| Contract End Date: | 31 March 2025 |
| Contract Duration: | 2 months |
| Procurement ID (OCID): | ocds-b5fd17-a759ce32-b4e1-4a9b-8350-84a9e4a4cabd |
| Notice Reference: | df64cc01-8ea0-40ab-a03b-f6cb96558482-806809 |
All 4 notices for this procurement, oldest first.
Supply and Install of Uninterrupted Power Supply to BACS Control Panels
Supply and Install of Uninterrupted Power Supply to BACS Control Panels
Supply and Install of Uninterrupted Power Supply to BACS Control Panels
Supply and Install of Uninterrupted Power Supply to BACS Control Panels
Earlier notices predate the Procurement Act 2023 (commenced 24 Feb 2025) and therefore don't carry UK1–UK17 codes.
View Original Notice
Access the full notice on the official portal
Awarded to
| Award value: | £45,179.66 |
| Award decision date: | 13 January 2025 |
| Award status: | Active |
The contract is for a single supplier to Supply and Install of Uninterrupted Power Supply to BACS Control Panels at The Pirbright Institute, Ash Road, Pirbright, Surrey, GU24 0NF. See Appendix E - Contract Scope. PROJECT SCOPE AND OBJECTIVES The Brooksby Building at The Pirbright Institute (Pirbright) will be a high containment facility for work on high consequence pathogens such as foot-and-mouth diseases virus (FMDV) when fully operational in 2026. As part of the post-construction 'Day 2' works there is a requirement to carry out additional works to the Building Automation and Control System (BACS) within the Brooksby Building to ensure it is fully aligned with the primary system used across the rest of the Pirbright site. The following package of work has been funded: • Installation of Uninterrupted Power Supply (UPS) to critical BACS Control Panels Equipment - 1 x Large UPS Unit Riello 30kVA Master MPS (6 Pulse Rectifier, 384VDC Battery, UPS to be fitted with a Multicom 384 comms card to be wired by Pirbright appointed contractor. Equipment - 20 x Small UPS units Sentinel Pro single phase on line 1kVA (0.8kW) 240v a.c. Materials - As required All required materials to be included: Cable, containment, Unistrut etc. Installation Large UPS unit Installation of 1 large UPS to 415v a.c. 3ph distribution board 50-DB-06-A-MECH rated at 100Amp complete with bypass switch fed from 50-SB-01-A at the main LV switch board on the AHU deck. This is inclusive of re-routing SWA and black plastic coated metallic flexible conduits. Install a Unistrut base to keep the UPS off the concrete with a clearance of 100mm. Installation 20 Small UPS Units Installation 20 Sentinel Pro UPS Units at locations indicated in drawings, external to control panels to give best possible ventilation. The "shelf" to be constructed of Unistrut and installed at a height to be serviceable and not to cause obstruction or in a position that may pose a concern to engineering team members. Commissioning and testing All units Test and commission all the above UPSs with installation to BS7671 electrical installation standard Documentation ALL Updated drawings showing site installation works Testing and commissioning results To also be included in tender: • Delivery of all materials to site • Production and issue of a programme of works • Provision of O&M Manual • Project management
Published contracts in the last 12 months
76
total contracts
£4.6m
total value
£171,127
average contract size
Typical categories
Site Steam Management and Boiler Maintenance
THE PIRBRIGHT INSTITUTE · WAC-641586
ISO11 Fumigation Lobby Replacement Project - Civil Works and CDM Principal Designer/Principal Contractor Role
THE PIRBRIGHT INSTITUTE · WAC-640378
ISO11 Fumigation Lobby and Dedicated Air Handling Unit (AHU)
THE PIRBRIGHT INSTITUTE · WAC-640379