| Source: | Contracts Finder |
| Notice Type: | Award notice |
| Buyer: | The Northern Lighthouse Board |
| Main Category: | Works |
| Procurement Method: | Open procedure |
| Tender Status: | Closed |
Pipeline status
Not addedImports the contract into your BidWriter pipeline · Qualify before you commit to bid
Application Deadline
30 March 2022
Closed
Estimated Value
£244,417.76
Need help writing this bid?
Our specialists write winning tender responses. Free consultation, no obligation.
Book a free consultation →| Estimated Value (ex. VAT): |
| £244,417.76 |
| Release Date: | 5 April 2022 |
| Application Deadline: | 30 March 2022 |
| Contract Start Date: | 3 May 2022 |
| Contract End Date: | 17 December 2022 |
| Contract Duration: | 8 months |
| Procurement ID (OCID): | ocds-b5fd17-a0c0e4a5-2e2e-456b-9242-09d531614825 |
| Notice Reference: | 3065e86a-a498-40a4-957d-3c89bcb461df-525296 |
View Original Notice
Access the full notice on the official portal
Awarded to
| Award value: | £244,417.76 |
| Award decision date: | 30 March 2022 |
| Award status: | Active |
Proposed Works The proposed project includes the full refurbishment of Start Point lighthouse (A3718) stands above Tobacco Rock, 59°16.638'N 002°22.577'W, on the tidal island of Start Point at the Eastern extremity of Sanday. The works shall comprise of the following: 1.Carry out a full Asbestos Refurbishment / Demolition Survey on all NLB operational buildings prior to the commencement of any work. 2.The Principal Contractor is expected to test the existing 'HCL' fall arrest system and re-certify it if necessary, before use. The Principal Contractor is to provide the Project Leader with all relevant test certification for record and audit purposes. 3.Deliver all plant/materials/camp to NLB Oban packaged for helicopter underslinging 4.Land plant/materials/camp on site and establish site. 5.Removal of the diesel engine, tank and obsolete aluminium lattice tower 6.Excavate and form foundations for new wind turbine (third-party installation) 7.Full redecoration of the station buildings 8.Refurbishment of the welfare facilities 9.Full reinstallation of all electrical systems 10.Upgrade of the existing optic 11.The new electrical installation is to be site Commissioned and proof tested for approval by NLB Engineering staff, in advance of meeting an NLB / Contractor mutually agreed Notice to Mariners date for the new permanent LED Optic coming into operation, in conjunction with the temporary light being switched off. 12.De-mobilise site and clear all surplus project materials and plant, with the disposal of excess project materials to appropriate licensed and registered dumps. The contractor must have a responsible person in attendance who has successfully passed a recognised Dangerous Goods training course. 13.The Principal Contractor is to supply the NLB Project Engineer with 'as-built' information for incorporation within NLB Operational and Maintenance documentation, which includes the Health and Safety file in line with current CDM Regulations. During the proposed works, it is essential that the Aids to Navigation are not prevented from operating at any stage that they are required. Details will be provided on the basic operation of these items to allow the Contractor to prevent his operatives from affecting the Aids to Navigation. Contractors Site Visit Tenderers are advised to attend this mandatory site visit schedule for 17 February 2022 (subject to possible alterations due to COVID travel restrictions) to familiarize themselves with the location and the available space and any restrictions. COVID-19 restrictions will be in place during the site visit. Full details of the proposed works are contained in the tender documents which can be download from https://www.delta-esourcing.com/respond/VFB28BPC57 Additional information: The contracting authority considers that this contract may be suitable for economic operators that are small or medium enterprises (SMEs). However, any selection of tenderers will be based solely on the criteria set out for the procurement.