Loading page content…
Loading page content…
Loading contract search results…
Loading contract details…
| Source: | Contracts Finder |
| Notice Type: | Tender notice |
| Buyer: | South Tees Development Corporation |
| Main Category: | Works |
| Procurement Method: | Open procedure (above threshold) |
| Tender Status: | Closed |
Pipeline status
Not addedImports the contract into your BidWriter pipeline · Qualify before you commit to bid
Application Deadline
29 July 2022
Closed
Estimated Value
£6,000,000
Need help writing this bid?
Our specialists write winning tender responses. Free consultation, no obligation.
Book a free consultation →| Estimated Value (ex. VAT): | £6,000,000 |
| Release Date: | 14 July 2022 |
| Application Deadline: | 29 July 2022 |
| Contract Start Date: | 22 August 2022 |
| Contract End Date: | 17 February 2024 |
| Contract Duration: | 1.5 years |
| Procurement ID (OCID): | ocds-b5fd17-35bf478b-d718-4b73-a097-cbcc31ad24b8 |
| Notice Reference: | 5046a0e4-f1bd-4ace-9109-43a1517236f6-554529 |
All 3 notices for this procurement, oldest first.
Design, Installation and Commissioning of; Lot 1: South Bank 66 & 11kV Substation Lot 2: seAH 66 & 11kV Substation
Design, Installation and Commissioning of; Lot 1: South Bank 66 & 11kV Substation Lot 2: seAH 66 & 11kV Substation
Design, Installation and Commissioning of; Lot 1: South Bank 66 & 11kV Substation Lot 2: seAH 66 & 11kV Substation
Earlier notices predate the Procurement Act 2023 (commenced 24 Feb 2025) and therefore don't carry UK1–UK17 codes.
View Original Notice
Access the full notice on the official portal
Awarded to
| Award value: | £10,218,196.84 |
| Award decision date: | 19 October 2022 |
| Award status: | Active |
South Tees Development Corporation are seeking the Design, Installation and Commissioning of 66/11k V transformers at two separate locations on the Redcar Site. Lot 1: South Bank Substation and Cabling Lot 2: seAH Substation and Cabling Lot 1: South Bank - To install two new 35/50MVA 66/11kV transformers at a location outside the client plot boundary to replace T67 and T68. Alongside that, both the 66kV transformer supply cables and the primary 11kV switchboard (Holmebeck 11kV) supplied by the transformers are over 50 years old. The cables and switchboard will also be replaced. Lot 2: seAH - To install two new 35/50MVA 66/11kV transformers alongside a primary 11kV switchboard supplied by the transformers. This will be located in a compound on the perimeter of the client site boundary
Published contracts in the last 12 months
11
total contracts
£250k
total value
£250,000
average contract size
Typical categories