| Source: | Contracts Finder |
| Notice Type: | Award notice |
| Buyer: | Northern Lighthouse Board |
| Main Category: | Goods |
| Procurement Method: | Open procedure |
| Tender Status: | Closed |
Pipeline status
Not addedImports the contract into your BidWriter pipeline · Qualify before you commit to bid
Application Deadline
12 September 2022
Closed
Estimated Value
£29,411.01
Need help writing this bid?
Our specialists write winning tender responses. Free consultation, no obligation.
Book a free consultation →| Estimated Value (ex. VAT): |
| £29,411.01 |
| Release Date: | 15 September 2022 |
| Application Deadline: | 12 September 2022 |
| Contract Start Date: | 18 September 2022 |
| Contract End Date: | 31 October 2022 |
| Contract Duration: | 1 month |
| Procurement ID (OCID): | ocds-b5fd17-67408196-1bac-44b9-9b2e-e400ca81e87c |
| Notice Reference: | 96b1381d-cff5-4c0c-8cd6-6f152b98bfa9-572008 |
View Original Notice
Access the full notice on the official portal
Awarded to
| Award value: | £29,411.01 |
| Award decision date: | 12 September 2022 |
| Award status: | Active |
NLB require an experienced contractor to supply, install and commission an air source heat pump at Firth View. The heat pump is to be installed as a drop-in replacement for the existing Worcester Bosch 40Cdi gas boiler. The heat pump should be installed in the approximate location of the existing boiler. The heat pump is required for central heating only. The Firth View complex consist of three traditional stone buildings that have been converted into offices. The main building which was originally a house and two outbuildings. During the conversion these buildings were insulated, and double glazing was installed. Drawing C-OBA/124 of the installed insulation is included within the quotation documents. Using tools provided by the PSDS it has been estimated that a 19kW heat pump will be required. However, this must be confirmed by a survey by the contractor during the site visit, a larger heat pump may be required. NLB will not be responsible for any associated costs for the site visit. Direct hot water will be supplied by electrical under tap water heaters, to be supplied and installed by the contractor. Additional information: The contracting authority considers that this contract may be suitable for economic operators that are small or medium enterprises (SMEs). However, any selection of tenderers will be based solely on the criteria set out for the procurement.
Published contracts in the last 12 months
84
total contracts
£71.5m
total value
£1,374,926
average contract size
Typical categories
Refurbishment of Maughold Head and Douglas Head Lighthouses
Northern Lighthouse Board · WAC-639495
Ignition Supervisory Control and Data Acquisition (SCADA) Support
Northern Lighthouse Board · WAC-638456
RTU's and M2M Communications Management
Northern Lighthouse Board · WAC-630415