| Source: | Contracts Finder |
| Notice Type: | Award notice |
| Buyer: | Wakefield Council |
| Main Category: | Works |
| Procurement Method: | Open procedure |
| Tender Status: | Closed |
| Estimated Value (ex. VAT): | Not specified |
| Release Date: | 20 March 2023 |
| Application Deadline: | 17 January 2023 |
| Contract Start Date: | 26 March 2023 |
View Original Notice
Access the full notice on the official portal
🤝 Need a consortium or subcontracting partner?
SMEs & Primes team up to win opportunities like this. Find partners on the board.
Awarded to
| Award value: | £246,792.78 |
| Award decision date: | 16 February 2023 |
| Award status: | Active |
The Nostell Bridge southwest masonry burr wall was subject to impact damage from an errant vehicle resulting in the damage at the location of a feature buttress. The damaged wall has since been made safe and traffic management was installed on the A638 to keep traffic away from the unprotected carriageway edge (single lane running with traffic lights). The damage revealed that the feature buttress was hollow with rubble infill to approximately carriageway level. Due to extensive cracking and displacement, the brickwork was carefully dismantled to ground level behind the wall to make safe and reclaim the bricks and stone copings for re-use. The works required to repair the Nostell Bridge Burr Wall include: • Traffic management • Partial dismantling of the existing brickwork • Temporary access track to the back side of the wall (earthworks) • Site clearance (vegetation) • Excavation and underpinning existing structure for temporary stabilty • Piled foundations (contractor designed, possible additional GI required) • Reinforced concrete pile cap, buttresses and cross beams • Reconstruction of brickwork parapet using salvaged bricks • Reconstruction of feature buttress using salvaged bricks and sourcing new bricks as required, recreating the original buttress as best as possible • Reinstate salvaged coping stones with new precast concrete lintel supports • Excavate and reinstate existing highway drainage
Published contracts in the last 12 months
3
total contracts
£580k
total value
£290,000
average contract size
Typical categories
Pipeline status
Not addedImports the contract into your BidWriter pipeline · Qualify before you commit to bid
Application Deadline
17 January 2023
Closed
Need help writing this bid?
Our specialists write winning tender responses. Free consultation, no obligation.
Book a free consultation →| Contract End Date: |
| 19 June 2023 |
| Contract Duration: | 3 months |
| Procurement ID (OCID): | ocds-b5fd17-2712b5c2-93dd-4908-922f-efb5cdcd1735 |