| Source: | Contracts Finder |
| Notice Type: | Award notice |
| Buyer: | Northern Lighthouse Board |
| Main Category: | Works |
| Procurement Method: | Open procedure (below threshold) |
| Tender Status: | Closed |
| Estimated Value (ex. VAT): |
Awarded to
| Award value: | £566,055.47 |
| Award decision date: | 27 March 2023 |
| Award status: | Active |
Works for complete or part construction and civil engineering work. Landscaping work for roads and motorways. Construction, foundation and surface works for highways, roads. Ground-drainage work. Water tanks. The Mull of Kintyre Lighthouse was built in 1788 and re-built between 1821 and 1830. The lighthouse (located approximately 16miles south west of Campbelltown) is situated on the edge of an 80m high cliff and is accessed via a steep and twisty single track macadammed road. The private road is approximately 1 mile long and extends from a lockable timber gate, adjacent to a public carpark/turning area at the end of the of the unclassified local authority road. From the access gate at the public carpark, the road drops approximately 280m down to the lighthouse, via a number of tight hairpin bends. Summary of Works: - Remote site, Private Road, 1.2miles, 2.6m wide, few passing places extreme gradients, hairpin bends - Existing private road surfacing is aged and breaking up at several points with poor condition drainage - Known difficulties with large vehicles travelling on single track - access requires to be monitored - Existing single track road is currently passable with care however major upgrade works are required. - Proposed to make bulk deliveries using ship and helicopter. - Temporary Power Supply for duration of the works, Site Security in accordance with CDM Regs. 2015 - Site clearance and works including demolition, excavation, drainage, earthworks, roadworks, brickwork, - Stonework, metalwork, plumbing including removal of 3,500 litre cold water storage tank, - Supply of and laying polymer concrete drainage channel, full road construction including overlay, - Supply and installation of replacement stainless steel water tank and all fixings and fittings - Supply and installation of 2no. 5,000 litre cold water storage tanks
Published contracts in the last 12 months
84
total contracts
£71.5m
total value
£1,374,926
average contract size
Typical categories
Refurbishment of Maughold Head and Douglas Head Lighthouses
Northern Lighthouse Board · WAC-639495
Ignition Supervisory Control and Data Acquisition (SCADA) Support
Northern Lighthouse Board · WAC-638456
RTU's and M2M Communications Management
Northern Lighthouse Board · WAC-630415
Pipeline status
Not addedImports the contract into your BidWriter pipeline · Qualify before you commit to bid
Application Deadline
2 March 2023
Closed
Estimated Value
£549,555.47
Need help writing this bid?
Our specialists write winning tender responses. Free consultation, no obligation.
Book a free consultation →| £549,555.47 |
| Release Date: | 28 March 2023 |
| Application Deadline: | 2 March 2023 |
| Contract Start Date: | 27 March 2023 |
| Contract End Date: | 1 August 2023 |
| Contract Duration: | 4 months |
| Procurement ID (OCID): | ocds-b5fd17-97c6404d-95d2-4e7b-bdb4-b1659fbd36a0 |
| Notice Reference: | 9f39156f-3eff-44e4-8e6e-aee708a25d9d-628642 |
View Original Notice