Loading page content…
Loading page content…
Loading contract search results…
Loading contract details…
| Source: | Contracts Finder |
| Notice Type: | Award notice |
| Buyer: | Cefas |
| Main Category: | Services |
| Procurement Method: | Open procedure (below threshold) |
| Tender Status: | Closed |
| Estimated Value (ex. VAT): |
Awarded to
| Award value: | £78,948 |
| Award decision date: | 11 April 2023 |
| Award status: | Active |
The BEEMS (British Energy Estuarine and Marine Studies) programme is funded by NNB Generating Company HPC (NNB GenCo). Through this programme, Cefas provide authoritative scientific information on the marine and transitional waters in the vicinity of potential new build nuclear power stations and require a competent Supplier to deliver the element described below; Description of the sample collection: The mudflat monitoring in Bridgwater Bay encompasses the collection of 6 replicates samples at 11 stations in Bridgwater Bay and Wick St Lawrence twice a year (February and August). The replicate samples are collected with a 0.01m2 core and the sediment is sieved through a 0.5 mm mesh sieve. The Macoma balthica individuals (only bivalve present in the mudflat) are hand-picked on the sieve during the survey and stored in separated glass vials. The potentially high number of individuals of this species are therefore not included in the samples. All benthic organisms are transferred into Nalgene bottles and fixed with 4% formaldehyde. Summary of deliverables: • Analysis of two survey batches of samples per year (collected in February and August), 66 samples per survey. • Externally audited, quality-controlled abundance / biomass matrices as per template provided, with current nomenclature (Primary processing and Audit lab). • One reference collection (Primary processing lab) - the collection will be updated over the duration of the contract as additional species are encountered in the samples. • Internal Quality Control logs (Primary processing lab). • Audited Quality Control report (Audit lab). • Regular project summary updates and correspondence between primary processing and audit lab (Primary processing and Audit lab).
Published contracts in the last 12 months
14
total contracts
£6.8m
total value
£484,530
average contract size
Typical categories
Pipeline status
Not addedImports the contract into your BidWriter pipeline · Qualify before you commit to bid
Application Deadline
23 March 2023
Closed
Estimated Value
£45,000
Need help writing this bid?
Our specialists write winning tender responses. Free consultation, no obligation.
Book a free consultation →| £45,000 |
| Release Date: | 12 April 2023 |
| Application Deadline: | 23 March 2023 |
| Contract Start Date: | 31 July 2023 |
| Contract End Date: | 31 December 2027 |
| Contract Duration: | 4.5 years |
| Procurement ID (OCID): | ocds-b5fd17-83c35872-98d8-43fc-a1f1-e5990aaa1f4e |
| Notice Reference: | 569515eb-e714-4c3b-aeb7-ba16fe8b9633-634163 |
All 2 notices for this procurement, oldest first.
CEFAS23-09 Contract for Marine Benthic Macroinvertebrate Sample Processing: Bridgwater Bay
CEFAS23-09 Contract for Marine Benthic Macroinvertebrate Sample Processing: Bridgwater Bay
Earlier notices predate the Procurement Act 2023 (commenced 24 Feb 2025) and therefore don't carry UK1–UK17 codes.
View Original Notice
Access the full notice on the official portal