Loading page content…
Loading page content…
Loading contract search results…
Loading contract details…
| Source: | Contracts Finder |
| Notice Type: | Tender notice |
| Buyer: | Blackpool Council |
| Main Category: | Services |
| Procurement Method: | Open procedure |
| Tender Status: | Closed |
Pipeline status
Not addedImports the contract into your BidWriter pipeline · Qualify before you commit to bid
Application Deadline
15 May 2023
Closed
Estimated Value
£265,250
Need help writing this bid?
Our specialists write winning tender responses. Free consultation, no obligation.
Book a free consultation →| Estimated Value (ex. VAT): | £265,250 |
| Release Date: | 13 April 2023 |
| Application Deadline: | 15 May 2023 |
| Contract Start Date: | 4 June 2023 |
| Contract End Date: | 31 March 2025 |
| Contract Duration: | 1.8 years |
| Procurement ID (OCID): | ocds-b5fd17-7fe81731-6938-4472-9096-df962a8ad83f |
| Notice Reference: | d7e39f66-938e-463a-a751-261185dffd66-635075 |
All 3 notices for this procurement, oldest first.
Blackpool Eco Coaching Project (Shared Prosperity Funded)
Blackpool Eco Coaching Project (Shared Prosperity Funded)
Blackpool Eco Coaching Project (Shared Prosperity Funded)
Earlier notices predate the Procurement Act 2023 (commenced 24 Feb 2025) and therefore don't carry UK1–UK17 codes.
View Original Notice
Access the full notice on the official portal
Awarded to
| Award decision date: | 31 May 2023 |
| Award status: | Active |
** Please note that all tender documents can be found on The Chest https://www.the-chest.org.uk/ under Reference DN 661144** This Project is Funded by the UK Shared Prosperity Fund. Blackpool Council is looking to appoint a Service Provider to provide a small team to deliver practical 1 to 1 support and guidance to residents to help them understand domestic energy efficiency and how their behaviour can increase/decrease energy consumption. The ultimate aim is to lower the carbon emissions of individual properties, with a tangible benefit to the households in the form of reduced energy costs and household utility bills. The team, internally referred to as Eco Coaches, will visit residents homes to complete a domestic energy assessment providing room by room guidance to maximise the efficiency of the property. The visit also includes the installation of low cost energy saving devices such as draft proofing, low energy lightbulbs and radiator reflector panels. Shared Prosperity Fund (UKSPF) Following the publication of the Levelling Up White Paper the pre-launch guidance for the UKSPF was released on the 2 February 2022. It provides 2.6 billion pounds of new funding for local investment by March 2025. The Investment Plan for the UKSPF is due to be confirmed mid - November over a three financial year period 2022/23 to 2024/2025, with all interventions due to end by March 2025. Additional information: ** Please note that all tender documents can be found on The Chest https://www.the-chest.org.uk/ under Reference DN 661144**
Published contracts in the last 12 months
28
total contracts
£401.4m
total value
£44,601,405
average contract size
Typical categories
18 Gorton St refurbishment £15k - £400k BHC Building and Refurbishment Framework
Blackpool Council · WAC-623401
101 Ribble Road
Blackpool Council · WAC-597685
20 Cross Street Blackpool £15k - £400k BHC Building and Refurbishment Framework
Blackpool Council · WAC-593658