| Source: | Contracts Finder |
| Notice Type: | Tender notice |
| Buyer: | Balfour Beatty VINCI Systra JV |
| Main Category: | Works |
| Procurement Method: | — |
| Tender Status: |
| Closed |
| Estimated Value (ex. VAT): | £5,000,000 |
| Release Date: | 7 February 2025 |
| Application Deadline: | 21 February 2025 |
| Procurement ID (OCID): | ocds-b5fd17-10501913-9ae5-4ce6-9094-0b80c99c1ae8 |
| Notice Reference: | 86b23a2a-e291-4791-aba5-3e7ff942bcfd-824263 |
View Original Notice
Access the full notice on the official portal
WP12.4.1 - Installation of primary steel framework, installation of steel sub frames, cladding tracking systems, firestops, insulation, retail doors and glazing panels for retail units within the station SAB areas. 1.1.1.1 Scope: For a Subcontractor to fabricate, manufacture, and install fibre cement cladding, internal glazing and smoke downstands, and all internal structural steelwork to support the internal cladding and glazing scope to front of house and station concourse areas. The scope also to include overclad doors, skirtings trims and architectural finished louvres. Note the HS2 station internal artwork cladding panels provided by others. 1.1.1.2 The Contractor will issue a detailed design for pricing as part of the Invitation to Tender. The Subcontractor will develop the design and coordinate the interfaces of the works, ensuring it is compliant and accepted by the Project Manager prior to commencement of works. 1.1.1.3 It's anticipated the site works will commence in mid 2027 and are likely to finish end of 2030. Key materials for the Subcontractor to fabricate, manufacture and install: 1.1.1.4 Bespoke designed steel frame curtain walling system with fixed units, steel frame curtain walling system with single glazed fixed panels - 172m2. 1.1.1.5 Bespoke fabricated single glazed stick façade system, steel frame curtain walling system with clear faced single glazed units; glazed framed doors and opaque bulkhead infill panels - 577m2. 1.1.1.6 overall size 2000 x 2500mm high; double leaf doors - 10No. 1.1.1.7 Fire stops to the ceiling level - Approximately 720m. 1.1.1.8 Bespoke designed internal steel frame system, with fire rating and acoustic requirements incorporating a combination of clear and back painted fixed single-glazed units - 466m2. 1.1.1.9 Bespoke fabricated double-glazed system with insulated panels steel frame system with glazed facade system; double glazed fixed panels - 171m2. 1.1.1.10 Bespoke fabricated double-glazed system, steel frame system with glazed facade system; double glazed fixed panels - 97m2. 1.1.1.11 Fibre cement cladding lining with stainless steel trims and stainless-steel portal frame, supported by bracketry and rails which shall be fixed back to the vertical posts - 424m2. 1.1.1.12 Metal Cladding Lining, steel panels to form a rainscreen system shall be supported by bracketry and rails, including supply and install of vertical posts - 1353m2. 1.1.1.13 Installation of approximately 760m of ceiling firestopping. 1.1.1.14 Installation of 35No double leaf doors, fixings, door jambs and headers. 1.1.1.15 Installation of louvers, glazing manifestations, skirting, roller blinds, concertina smoke screen and down stands. NOTE: LIN-271 is the vitreous enamel art cladding panels, this does not form part of this scope. Further details can be found on the attached document
Document pack· 1 file
Published contracts in the last 12 months
6
total contracts
£49.0m
total value
£8,166,667
average contract size
Typical categories
Pipeline status
Not addedImports the contract into your BidWriter pipeline · Qualify before you commit to bid
Application Deadline
21 February 2025
Closed
Estimated Value
£5,000,000
Need help writing this bid?
Our specialists write winning tender responses. Free consultation, no obligation.
Book a free consultation →