Loading page content…
Loading page content…
| Source: | Contracts Finder |
| Buyer: | UK Battery Industrialisation Centre |
| Main Category: | Goods |
| Procurement Method: | Open procedure |
| Tender Status: | Complete |
| Estimated Value (ex. VAT): | £600,000 |
| Release Date: | 26 April 2023 |
| Application Deadline: | 28 February 2023 |
| Procurement ID (OCID): | ocds-b5fd17-549292c3-9e32-4a3d-88e9-aa9221a048e4 |
| Notice Reference: | 6ebe7a65-ee54-48d7-9476-7ca4c7620a23-639519 |
View Original Notice
Access the full notice on the official portal
A new single chiller is required to serve a back-up to an existing Daikin chiller. The system serves the building 1degree Celsius cooling coils located within 9 No. Dehumidifiers that maintain a set dewpoint within existing clean & dry rooms. The current 1degree Celsius chiller circuit is supplied by a single chiller. This circuit supplies the 9 dehumidifier units which serve the cell assembly rooms to achieve the target dew point for this area. The single chiller does not have any back up unit or resilience to prevent the room conditions from being compromised. The requirement of this document is to implement a resilience chiller which will supply chilled water in the event of a failure on the current system and not provide additional capacity to the circuit. The system already has provision to install and additional chiller in parallel to the current asset. Please register you interest in the link below, the tender documents will be viewable once expression of interest has been accepted.
Pipeline status
Not addedContract imported automatically · AI writes the response
Application Deadline
28 February 2023
Closed
Estimated Value
£600,000
Need help writing this bid?
Our specialists write winning tender responses. Free consultation, no obligation.
Book a free consultation →