| Source: | Contracts Finder |
| Notice Type: | Award notice |
| Buyer: | Ministry of Justice |
| Main Category: | Works |
| Procurement Method: | Call-off from a framework agreement |
| Tender Status: | Closed |
| Estimated Value (ex. VAT): | £1,383,894 |
Pipeline status
Not addedImports the contract into your BidWriter pipeline · Qualify before you commit to bid
Application Deadline
12 September 2024
Closed
Estimated Value
£1,383,894
Need help writing this bid?
Our specialists write winning tender responses. Free consultation, no obligation.
Book a free consultation →| Release Date: | 10 February 2025 |
| Application Deadline: | 12 September 2024 |
| Contract Start Date: | 3 February 2025 |
| Contract End Date: | 12 May 2027 |
| Contract Duration: | 2.3 years |
| Procurement ID (OCID): | ocds-b5fd17-29968313-858e-4162-b089-3c483c94ca94 |
| Notice Reference: | 65da7402-ff03-4716-8d1e-5e6b6bff2595-824961 |
View Original Notice
Access the full notice on the official portal
Awarded to
| Award value: | £1,383,894 |
| Award decision date: | 3 February 2025 |
| Award status: | Active |
- Total replacement of the current Fire Safety systems within the built environment (ie site wide) , utilising hard wired system. - Furthermore, the integration of a number of sustainability initiatives including; replacement of LED lighting, introduction of lighting controls and water saving initiatives. A constructor has been appointed for the design and build of the project. This is a two stage Design and Build Contract let under the PPC2000 (Amended 2013) Form of contract. The original estimated value of the contract was calculated by MOJ, and its Cost Consultants following desktop and non-intrusive surveys and was based on information reasonably known at the time and arrived at via a thorough and appropriate methodology. The first stage will involve the constructor providing Pre-construction surveys and design services at a cost of £1,383,894. It is expected that the total construction cost of the project will be c£14m.
Published contracts in the last 12 months
1,058
total contracts
£276477.8m
total value
£389,954,573
average contract size
Powder Coating System for Prison Industries Workshop at HMP Wymott
Ministry of Justice · WAC-639650
Powder Coating System for Prison Industries Workshop at HMP Wymott
Ministry of Justice · WAC-638772
The Supply of Injection moulding Machines to HMP Ranby
Ministry of Justice · WAC-638402