| Source: | Contracts Finder |
| Notice Type: | Award notice |
| Buyer: | THE PIRBRIGHT INSTITUTE |
| Main Category: | Works |
| Procurement Method: | Open procedure (below threshold) |
| Tender Status: | Closed |
Pipeline status
Not addedImports the contract into your BidWriter pipeline · Qualify before you commit to bid
Application Deadline
26 April 2023
Closed
Estimated Value
£50,000
Need help writing this bid?
Our specialists write winning tender responses. Free consultation, no obligation.
Book a free consultation →| Estimated Value (ex. VAT): |
| £50,000 |
| Release Date: | 6 June 2023 |
| Application Deadline: | 26 April 2023 |
| Contract Start Date: | 4 June 2023 |
| Contract End Date: | 5 July 2023 |
| Contract Duration: | 1 month |
| Procurement ID (OCID): | ocds-b5fd17-6ad61a8f-1cc0-4eb0-ad98-a1a1cbd5fa3b |
| Notice Reference: | 976ffc2b-3830-407a-b5ea-3ec8b5e701eb-650941 |
All 2 notices for this procurement, oldest first.
Site Clearance for the Centre for Veterinary Vaccine Innovation & Manufacturing
Site Clearance for the Centre for Veterinary Vaccine Innovation & Manufacturing
Earlier notices predate the Procurement Act 2023 (commenced 24 Feb 2025) and therefore don't carry UK1–UK17 codes.
View Original Notice
Access the full notice on the official portal
Awarded to
| Award value: | £33,075 |
| Award decision date: | 16 May 2023 |
| Award status: | Active |
The provision of labour, plant, supervision and documentation for the removal of demolition spoil, levelling of soil heaps and breakout of a small section of concrete from a greenfield area. The scope of works is as follows: • Removal and disposal of demolition spoil, including large hardcore slabs, metalwork, pipework, metal fencing, brickwork, cable reels etc. Estimates are provided, however the tenderer is responsible for confirming type and quantity of spoil to be removed. • Provision of adequate waste management documentation. • Levelling of soil heaps and filling in of pits on the site (soil to be retained on site). • Reinstatement and extension of the existing reptile fence for the cleared area. • Breaking out of a section of concrete and removal of the same. • Provision of welfare facilities. • Provision of wheel washing and/or road cleaning.
Published contracts in the last 12 months
76
total contracts
£4.6m
total value
£171,127
average contract size
Typical categories
Site Steam Management and Boiler Maintenance
THE PIRBRIGHT INSTITUTE · WAC-641586
ISO11 Fumigation Lobby Replacement Project - Civil Works and CDM Principal Designer/Principal Contractor Role
THE PIRBRIGHT INSTITUTE · WAC-640378
ISO11 Fumigation Lobby and Dedicated Air Handling Unit (AHU)
THE PIRBRIGHT INSTITUTE · WAC-640379