| Source: | Contracts Finder |
| Notice Type: | Award notice |
| Buyer: | Liverpool John Moores University |
| Main Category: | Works |
| Procurement Method: | Open procedure (above threshold) |
| Tender Status: | Complete |
| Estimated Value (ex. VAT): | Not specified |
| Release Date: | 13 June 2023 |
| Application Deadline: | 20 March 2023 |
| Procurement ID (OCID): | ocds-b5fd17-0710d9b8-0d3e-494b-9a76-d61497e5ba0c |
| Notice Reference: | ab0497db-2e0f-4187-ab0a-50abd646e497-652537 |
All 2 notices for this procurement, oldest first.
Aldham Robarts Roof recovering and M&E upgrade works
Aldham Robarts Roof recovering and M&E upgrade works
Earlier notices predate the Procurement Act 2023 (commenced 24 Feb 2025) and therefore don't carry UK1–UK17 codes.
View Original Notice
Access the full notice on the official portal
There is an initial known project which is a definite requirement once this tender has been awarded. You are invited to submit the Supplier Questionnaire to access capability for the provision of replacement air handling units, boilers and roof recovering works to Aldham Robarts Library at LJMU Liverpool John Moores University. Please note, beyond this initial project, LJMU do not guarantee any further revenue under this agreement, however if we do have any further related projects that require these services, we will allocate to the successful bidder (with the caveat that pricing is realistic and sustainable) The proposed works involve the replacement of 2No. existing air handling units (currently located on the roof of Aldham Robarts Library) LJMU, recovering the existing roof covering and strip out and installation of new gas fired boilers. LJMU will provide a full specification and requirements within the final ITT documents. Contractors will be expected to provide a commercial and quality submission in the tender, including for the following: (but not limited to) Removal of 2No. existing air handling units (currently situated at roof level) Supply and install 2No. air handling units to roof Replace existing water tanks, currently situated on the roof with new ground floor tanks and booster. Strip out existing gas fired boilers and supply and installation of new, including reconfiguration of existing basement plant room. Remove existing flat roof covering and supply and install new Sika flat roof system complete with new installation. Remove and replace existing rooflights Associated BMS works Associated access to the roof and management of crane lifts Associated Builders & Electrical Works Additional information: This is an award notice, therefore this opportunity is not now live
Published contracts in the last 12 months
56
total contracts
£10.5m
total value
£376,589
average contract size
Typical categories
John Lennon Art & Design Building Roof Refurbishment
Liverpool John Moores University · WAC-584247
John Lennon Art & Design Building Roof Refurbishment
Liverpool John Moores University · WAC-584249
RFI2601 CCTV Review, Technical Design and Video Management System - Preliminary Market Engagement
Liverpool John Moores University · WAC-581961
Pipeline status
Not addedContract imported automatically · AI writes the response
Application Deadline
20 March 2023
Closed
Need help writing this bid?
Our specialists write winning tender responses. Free consultation, no obligation.
Book a free consultation →