| Source: | Contracts Finder |
| Notice Type: | Tender notice |
| Buyer: | UNIVERSITY OF SHEFFIELD |
| Main Category: | Goods |
| Procurement Method: | Open procedure (above threshold) |
| Tender Status: | Closed |
Awarded to
| Award value: | £816,883 |
| Award decision date: | 22 August 2023 |
| Award status: | Active |
With co-funding from the European Regional Development Fund and BEIS, the University of Sheffield is establishing a national Translational Energy Research Centre (TERC) as an integrated multi-technology, pilot-scale R&D platform for low-carbon technologies including hydrogen, bioenergy (BE), and Carbon Capture, Utilisation and Storage (CCUS). Site equipment includes a Molten Carbonate Fuel Cell (MCFC) which forms part of a Bioenergy with Carbon Capture and Storage/Utilisation (BECCS) system. The MCFC is a high temperature process capturing CO2 from combustion flues gas with simultaneous power generation. The MCFC utilises 2 sources of flue gas (individually/mixed) which are fed to the cathode side of the MCFC, and which require cleaning and conditioning: 1. Real combustion flue gas, mainly from wood grate boiler, which requires: (1) filtering, and (2) wet/dry scrubbing upstream of the MCFC. 2. Synthetic flue gas blended from compressed air, CO2 and N2 to simulate / modulate real combustion/process flue gas; the CO2 also require dry/wet scrubbing. CO2 (synthetic) is also used on the anode side of the MCFC and requires scrubbing and conditioning before it is fed to the MCFC. The scrubbed CO2 can also be for other plants on site: primarily Fischer Tropsch (FT) Plant. This tender covers the scrubbing and conditioning of biomass boiler flue gas (as well as synthetic/semi-synthetic flue gas) to meet stringent purity requirements of the MCFC. It also covers fuel feed to the Anode side of the MCFC. S-containing impurities as well as compounds containing halogens (e.g., HCl), As, Se and P must be scrubbed to low ppb levels to prevent poisoning of the plant catalyst. This is an EU/FTS open exercise. The ITT can be downloaded by registering and expressing your interest on the University`s e-tendering system https://in-tendhost.co.uk/sheffield If you have any questions or comments in relation to this tender they must be submitted via the In-tend system, this can be accessed at https://in-tendhost.co.uk/sheffield Completed tenders must be returned through the same e-tendering system.
Published contracts in the last 12 months
68
total contracts
£28.1m
total value
£585,237
average contract size
Typical categories
University of Sheffield - Energy Centre & Heat Network Decarbonisation: Supplier Engagement Webinar. Premarket Engagement
UNIVERSITY OF SHEFFIELD · WAC-635988
5044/AM/CK Laser Powder Bed Fusion System
UNIVERSITY OF SHEFFIELD · WAC-609259
5073/EFM/RH - Bar One Students Union, Glossop Rd Entrance and Façade Refurbishment
UNIVERSITY OF SHEFFIELD · WAC-606169
Pipeline status
Not addedImports the contract into your BidWriter pipeline · Qualify before you commit to bid
Application Deadline
25 July 2023
Closed
Estimated Value
£350,000
Need help writing this bid?
Our specialists write winning tender responses. Free consultation, no obligation.
Book a free consultation →| Estimated Value (ex. VAT): | £350,000 |
| Release Date: | 23 June 2023 |
| Application Deadline: | 25 July 2023 |
| Contract Start Date: | 27 September 2023 |
| Contract End Date: | 29 September 2023 |
| Contract Duration: | 0 months |
| Procurement ID (OCID): | ocds-b5fd17-0df4cf92-0dbc-4be9-a9de-6f4e790eb2b0 |
| Notice Reference: | 2b85d64a-f976-4317-a622-206f5982fb2b-656398 |
All 2 notices for this procurement, oldest first.
3808/JN - Flue Gas/CO2 Scrubbing and Conditioning System (16 Lots)
3808/JN - Flue Gas/CO2 Scrubbing and Conditioning System (16 Lots)
Earlier notices predate the Procurement Act 2023 (commenced 24 Feb 2025) and therefore don't carry UK1–UK17 codes.