Loading page content…
Loading page content…
Loading contract search results…
Loading contract details…
| Source: | Contracts Finder |
| Notice Type: | Award notice |
| Buyer: | Northern Lighthouse Board |
| Main Category: | Works |
| Procurement Method: | Open procedure (below threshold) |
| Tender Status: | Closed |
| Estimated Value (ex. VAT): | £122,936.29 |
| Release Date: | 10 July 2023 |
| Application Deadline: | 2 May 2023 |
| Contract Start Date: | 31 July 2023 |
View Original Notice
Access the full notice on the official portal
🤝 Need a consortium or subcontracting partner?
SMEs & Primes team up to win opportunities like this. Find partners on the board.
Awarded to
| Award value: | £122,936.29 |
| Award decision date: | 6 July 2023 |
| Award status: | Active |
Refurbishment work. Concrete repair work. Bricklaying work. Joinery work. Metalworking. Plastering work. Glazing work. Painting work. Description: Refurbishment work. Concrete repair work. Bricklaying work. Joinery work. Metalworking. Plastering work. Glazing work. Painting work. Woodwork. This tender is for the refurbishment of Buchan Ness Lighthouse, which is situated on the east coast of the Scottish mainland, north of Aberdeen on the A90 and approximately 2 miles south of Peterhead at the village of Boddam within the Banff and Buchan District of Aberdeenshire. The lighthouse is situated on a tidal rock outcrop accessed via a reinforced concrete bridge. The lighthouse has a position Latitude 57o 28.2 'N, Longitude 1 46.4 'W. Due to the location of this site, all materials and equipment will be transported to and from site via road access, via the B9108 through the small village of Boddam. The NLB have a servitude right of access to the lighthouse via the road and bridge. It is not envisaged that any NLB Tender or helicopter work will be required. The area of beach directly under the access bridge is submerged at high tide, so any work here is restricted to suitable tide times. The Principal Contractor must also ensure that the condition of any access routes are monitored and any areas identified as hazardous are noted with details passed to their own employees, appointed sub-contractors, and all visiting NLB personnel. If necessary, suitable remedial and protective measures should be put in place to protect anyone on the site and the environment for the duration of the contract. Works consist of carrying out a full Asbestos Refurbishment/Demolition Survey on all NLB operational buildings prior to commencement. Testing of the existing 'HCL' fall arrest system and re-certification if necessary before use and provide all relevant test certification for record and audit purposes. Full refurbishment and upgrade of the station. De-mobilise site and clear all surplus project materials and plant, with the disposal of excess project materials to appropriate licensed and registered dumps. Supply 'as-built' information for incorporation within NLB Operational and Maintenance documentation, which includes the Health and Safety file in line with current CDM Regulations.
Published contracts in the last 12 months
84
total contracts
£71.5m
total value
£1,374,926
average contract size
Typical categories
Refurbishment of Maughold Head and Douglas Head Lighthouses
Northern Lighthouse Board · WAC-639495
Ignition Supervisory Control and Data Acquisition (SCADA) Support
Northern Lighthouse Board · WAC-638456
RTU's and M2M Communications Management
Northern Lighthouse Board · WAC-630415
Pipeline status
Not addedImports the contract into your BidWriter pipeline · Qualify before you commit to bid
Application Deadline
2 May 2023
Closed
Estimated Value
£122,936.29
Need help writing this bid?
Our specialists write winning tender responses. Free consultation, no obligation.
Book a free consultation →| Contract End Date: |
| 14 November 2023 |
| Contract Duration: | 4 months |
| Procurement ID (OCID): | ocds-b5fd17-44a44edd-3fbf-48fc-847f-fa306aad1e8e |
| Notice Reference: | 1d8513ee-36c7-4175-a422-64d1c05069d8-661062 |