Loading page content…
Loading page content…
Loading contract search results…
Loading contract details…
| Source: | Contracts Finder |
| Notice Type: | Tender notice |
| Buyer: | Natural England |
| Main Category: | Services |
| Procurement Method: | Open procedure (below threshold) |
| Tender Status: | Closed |
| Estimated Value (ex. VAT): |
Awarded to
| Award value: | £11,739 |
| Award decision date: | 30 October 2023 |
| Award status: | Active |
The objective of this project is to develop a detailed hydrogeological assessment to understand the potential of using a proposed site near Lyscombe within the Poole Harbour Catchment, Dorset, as mitigation against nutrient loading. There is a need to understand the balance between overland and subsurface flow pathways within the proposed site as this balance will determine the time lag for N and P to reach a surface waterbody. A hydrogeological assessment is thus required to explore what sort of time lag may be observed from the cessation of agriculture to the beneficial effects of the reduction of N and P. The Hydrogeological Assessment must: • Include an assessment of the potential for overland flow at the site. • Include an assessment to determine the potential time lags for subsurface flows and their associated nutrient loads in reaching the designated site, Poole Harbour. • Show consideration of the infiltration potential of the site to allow for determination on the proportion of rainfall that will follow either surface or subsurface pathways to the nearest surface waterbody. • Define the time taken for the nutrient reduction, once implemented, to have an effect at the designated site. • Be based on the best available evidence. While these are the key deliverables for this contract it is anticipated that the supplier may choose to improve upon and expand these initial requirements. Purpose of this Contract To support the Nutrient Neutrality project's habitat delivery enabling Natural England, landowners and other interested parties to understand constraints and likely costs of progression towards the design and build phase of schemes. Aims of this Contract To provide adequate information for Natural England and the landowner to understand the potential time lag that may occur between the cessation of agriculture to the beneficial effects of the reduction of N and P. Additional information: To apply for this opportunity you must submit your quotation meeting the requirements detailed in the Request for Quotation (RFQ) attached. Your response must be sent to [email protected] by 17:00 on 20th October 2023 If you have any clarification questions linked to this opportunity or the procurement process please submit these via email to [email protected]. Please note that, unless commercially sensitive, both the question and the response will be circulated to all tenderers.
Document pack· 3 files
Published contracts in the last 12 months
518
total contracts
£15.8m
total value
£42,129
average contract size
Typical categories
Provision of Advice and Information Services on relevant Global and EU policy developments on Agriculture and Related Environment Policies and Nature Conservation Matters
Natural England · WAC-642504
Quantifying the difference that nature recovery can make to selected risk events in the National Risk Register (informed by the State of Natural Capital Report)
Natural England · WAC-642641
Foulness SPA Ornithological Surveys, Intertidal Survey and Mapping
Natural England · WAC-641946
Pipeline status
Not addedImports the contract into your BidWriter pipeline · Qualify before you commit to bid
Application Deadline
20 October 2023
Closed
Estimated Value
£15,000
Need help writing this bid?
Our specialists write winning tender responses. Free consultation, no obligation.
Book a free consultation →| £15,000 |
| Release Date: | 2 October 2023 |
| Application Deadline: | 20 October 2023 |
| Contract Start Date: | 7 November 2023 |
| Contract End Date: | 20 February 2024 |
| Contract Duration: | 4 months |
| Procurement ID (OCID): | ocds-b5fd17-96bf6acf-9805-463b-918a-a44d09a8f878 |
| Notice Reference: | 06da103c-5b11-4bdc-ba24-22f94e2afdaa-685226 |
All 2 notices for this procurement, oldest first.
Nutrient Neutrality -Hydrogeological Assessment (HGA) of a site within Lyscombe, Dorset
Nutrient Neutrality -Hydrogeological Assessment (HGA) of a site within Lyscombe, Dorset
Earlier notices predate the Procurement Act 2023 (commenced 24 Feb 2025) and therefore don't carry UK1–UK17 codes.
View Original Notice
Access the full notice on the official portal
attachment