Loading page content…
Loading page content…
Loading contract search results…
Loading contract details…
| Source: | Contracts Finder |
| Notice Type: | Award notice |
| Buyer: | THE ROYAL INSTITUTION OF CORNWALL |
| Main Category: | Works |
| Procurement Method: | Open procedure (below threshold) |
| Tender Status: | Closed |
Pipeline status
Not addedImports the contract into your BidWriter pipeline · Qualify before you commit to bid
Application Deadline
29 September 2023
Closed
Estimated Value
£200,000
Need help writing this bid?
Our specialists write winning tender responses. Free consultation, no obligation.
Book a free consultation →| Estimated Value (ex. VAT): |
| £200,000 |
| Release Date: | 31 October 2023 |
| Application Deadline: | 29 September 2023 |
| Contract Start Date: | 17 October 2023 |
| Contract End Date: | 30 January 2024 |
| Contract Duration: | 4 months |
| Procurement ID (OCID): | ocds-b5fd17-10713a89-ee62-4b44-af22-8e5ca5171ebf |
| Notice Reference: | 5a33afad-af6a-4aa5-ab43-89b48aac66a9-693347 |
All 5 notices for this procurement, oldest first.
Upgraded electrical switchgear and lighting provision
Upgraded electrical switchgear and lighting provision
Upgraded electrical switchgear and lighting provision
Upgraded electrical switchgear and lighting provision
Upgraded electrical switchgear and lighting provision
Earlier notices predate the Procurement Act 2023 (commenced 24 Feb 2025) and therefore don't carry UK1–UK17 codes.
View Original Notice
Access the full notice on the official portal
Awarded to
| Award value: | £326,711.56 |
| Award decision date: | 16 October 2023 |
| Award status: | Active |
The Royal Cornwall Museum is upgrading its electrical supply. Works required include new switchgear in a different part of the museum and transfer of circuits once new supply is provided by National Grid. The opportunity is being taken to replace the emergency lighting system and to upgrade gallery and back of house light fixtures to LED plus replacement of control gear. Additional information: Tender addendum issued 18 Sept. Lighting drawings, asbestos reports, EICR reports, additional photographs added. Instructions for Tenderers, Specification and Proposed Schematic drawing updated. Tender clarification 25 Sept. Lighting control provisional sum to be inserted.
Published contracts in the last 12 months
7
total contracts
£3.2m
total value
£460,000
average contract size
Typical categories