Loading page content…
Loading page content…
Loading contract search results…
Loading contract details…
| Source: | Contracts Finder |
| Notice Type: | Award notice |
| Buyer: | Cumberland Council |
| Main Category: | Works |
| Procurement Method: | Other - |
| Tender Status: | Closed |
| Estimated Value (ex. VAT): |
Pipeline status
Not addedImports the contract into your BidWriter pipeline · Qualify before you commit to bid
Application Deadline
24 October 2023
Closed
Estimated Value
£75,000
Need help writing this bid?
Our specialists write winning tender responses. Free consultation, no obligation.
Book a free consultation →| £75,000 |
| Release Date: | 9 November 2023 |
| Application Deadline: | 24 October 2023 |
| Contract Start Date: | 21 November 2023 |
| Contract End Date: | 19 December 2023 |
| Contract Duration: | 1 month |
| Procurement ID (OCID): | ocds-b5fd17-148d4e20-0269-4edd-add7-17aac5917e0f |
| Notice Reference: | 7e4f9580-dac2-4d5a-9f60-e45c25303d72-696659 |
View Original Notice
Access the full notice on the official portal
Awarded to
| Award value: | £45,997.6 |
| Award decision date: | 30 October 2023 |
| Award status: | Active |
The Council wishes to procure the following work:\r The Principal Bridge Inspection (PBI) undertaken in 2021 highlighted some high priority defects at Threapland Bridge that need remediation.\r \r It should be noted that where open mortar joints or joints containing friable or cracked mortar are found in the existing main arch, abutments, spandrel walls, wing walls and parapets, the joints shall be raked out down to sound mortar and repointed with mortar designation (ii) as described in the Specification for Highway Works.\r \r The following repairs are required to the brickwork and masonry:\r \r 1. The spandrel walls require repointing throughout.\r 2. Areas of spalled or missing brickwork on the spandrel walls require repair or replacement.\r 3. The abutment walls require repointing throughout.\r 4. The outer face of the abutment walls require repointing and possible stitching to remediate the existing cracking and separation.\r 5. Areas of spalled, missing or loose brickwork on the abutment walls require repair or replacement.\r 6. The gap between the rear abutment and adjacent bedrock on the upstream north and south face and the downstream north and south face should be pointed and sealed.\r 7. The arch barrel requires repointing throughout.\r 8. The arch rings at each elevation require repointing and possible stitching to remediate the existing separation.\r 9. Missing brickwork on the arch ring should be replaced.\r 10. The upstream and downstream brickwork headwalls require repointing.\r 11. Missing brickwork from the headwalls require repair or replacement.\r 12. The outer face of the upstream and downstream stone parapets require repointing.\r 13. Missing stone from the outer face of the downstream parapet require repair or replacement.\r 14. Vegetation (ivy, saplings etc) from the parapet outer faces should be removed.\r 15. Mature trees (4No.) at each of the approaches should be removed and Eco Plugged.\r 16. After the trees have been removed and where required the parapets should be extended to offer edge protection on approaching the bridge.
Published contracts in the last 12 months
401
total contracts
£8035.6m
total value
£38,083,468
average contract size