| Source: | Contracts Finder |
| Notice Type: | Award notice |
| Buyer: | Cumberland Council |
| Main Category: | Works |
| Procurement Method: | Other - |
| Tender Status: | Closed |
Pipeline status
Not addedImports the contract into your BidWriter pipeline · Qualify before you commit to bid
Application Deadline
11 August 2023
Closed
Estimated Value
£200,000
Need help writing this bid?
Our specialists write winning tender responses. Free consultation, no obligation.
Book a free consultation →| Estimated Value (ex. VAT): |
| £200,000 |
| Release Date: | 9 November 2023 |
| Application Deadline: | 11 August 2023 |
| Contract Start Date: | 27 November 2023 |
| Contract End Date: | 31 August 2024 |
| Contract Duration: | 9 months |
| Procurement ID (OCID): | ocds-b5fd17-4d8372b9-45f6-463b-9314-c40f45f699e9 |
| Notice Reference: | 6416eb37-0f82-459c-9033-740d4fb97115-696837 |
All 2 notices for this procurement, oldest first.
CWF 2a C2016 Camerton sheet piling with capping beam, rock revetment and carriageway renewal design and build works
CWF 2a C2016 Stage 2 Construction - Camerton sheet piling with capping beam, rock revetment and carriageway renewal design and build works
Earlier notices predate the Procurement Act 2023 (commenced 24 Feb 2025) and therefore don't carry UK1–UK17 codes.
View Original Notice
Access the full notice on the official portal
Awarded to
| Award value: | £35,717.09 |
| Award decision date: | 22 October 2023 |
| Award status: | Active |
The scheme comprises remedial works for a section of highway, on the C2016 between Camerton and Great Broughton. The site is located approximately 1km east of Camerton, Cumbria, at National Grid Reference - NY 04431 30768. The site comprises an area of failed highway embankment carrying the C2016 adjacent to the River Derwent. The slope failure comprises a translational slip around 40m long, 1.5m wide (max) and 2m high, where material supporting the C2016 has moved downslope into the channel of the River Derwent and subsequently washed downstream.\r The anticipated remediation works comprise the design and build construction of a sheet pile retaining wall with concrete capping beam, the embankment reconstructed with engineered fill with carriageway reinstated to the correct standards and the installation of rock armour revetment to provide additional erosion resistance.