Loading page content…
Loading page content…
Loading contract search results…
Loading contract details…
| Source: | Contracts Finder |
| Notice Type: | Award notice |
| Buyer: | United Kingdom Atomic Energy Authority |
| Main Category: | Works |
| Procurement Method: | Restricted procedure |
| Tender Status: | Closed |
Pipeline status
Not addedImports the contract into your BidWriter pipeline · Qualify before you commit to bid
Application Deadline
13 September 2023
Closed
Estimated Value
£115,000
Need help writing this bid?
Our specialists write winning tender responses. Free consultation, no obligation.
Book a free consultation →| Estimated Value (ex. VAT): |
| £115,000 |
| Release Date: | 14 November 2023 |
| Application Deadline: | 13 September 2023 |
| Contract Start Date: | 13 November 2023 |
| Contract End Date: | 31 January 2024 |
| Contract Duration: | 3 months |
| Procurement ID (OCID): | ocds-b5fd17-59076265-06a0-44bb-a4ef-846c48abd67b |
| Notice Reference: | 93862796-6c63-413a-8554-147ae24e0d9f-698002 |
View Original Notice
Access the full notice on the official portal
Awarded to
| Award value: | £119,104.66 |
| Award decision date: | 14 November 2023 |
| Award status: | Active |
A requirement has emerged for the provision of a containerised laboratory to be constructed within a compound with associated ancillary structures. The actual laboratory facility is to be provided and installed by others but as a precursor to the delivery and installation, civil engineering works are also required. The works are to provide a foundation and associated enabling works for a 9.14m x 3.04m containerised laboratory to be installed to the North of Building B24. A RIBA Stage 3 design has been developed and the Construction Provider is to further develop the design and build the following: • Foundations to set container and additional equipment. • Surface water drainage. • Install ducts for later installation of Power and data by others. • Fence to enclose the container and supplementary equipment. • Temporary Vehicle Access. • Temporary pedestrian footpath. The full works are described within the Schedule of Works and associated Scope documentation.
Mission Led AI Data Centre and a Strategic Investment Partnership Funder for Future Campus Development
United Kingdom Atomic Energy Authority · WAC-26667
STEP_T_KK008_2024 Fusion Vacuum Vessel and In-Vessel Systems Material Testing RFI
United Kingdom Atomic Energy Authority · WAC-30078
Design and Build of Test Rigs Framework
United Kingdom Atomic Energy Authority · WAC-30607