Loading page content…
Loading page content…
Loading contract search results…
Loading contract details…
| Source: | Find a Tender Service (FTS) |
| Notice Type: | Tender notice |
| Buyer: | Stratton St Margaret Parish Council |
| Main Category: | Works |
| Procurement Method: | Open procedure |
| Submission Methods: | Written |
Pipeline status
Not addedImports the contract into your BidWriter pipeline · Qualify before you commit to bid
Application Deadline
23 April 2025
Closed
Estimated Value
£150,000
Need help writing this bid?
Our specialists write winning tender responses. Free consultation, no obligation.
Book a free consultation →| Tender Status: |
| Closed |
| Estimated Value (ex. VAT): | £150,000 |
| Release Date: | 21 March 2025 |
| Application Deadline: | 23 April 2025 |
| Procurement ID (OCID): | ocds-h6vhtk-04f72e |
| Notice Reference: | 010605-2025 |
Stratton St Margaret Parish Council are excited to go out for tender for the Pavilion at Meadowcroft Community Centre, Addison Crescent, Swindon, SN2 7JX. Meadowcroft Pavilion is currently made up of 2 changing room areas with communal showers, 1 referee changing room, A small kitchen type area, 3 toilets and 4 urinals. There are currently 2 large steps to enter into the building. Access can be granted from each side of the pavilion. The main idea of this project is to change the main area of the pavilion into a larger community space with separate changing areas with toilet and showers. Planning permission has been applied for and awaiting approval and we now looking for contractor to complete the works. Key points: • Knock through changing rooms and storage room to create 1 larger room. • Installation of a disabled toilet. • Decorate all rooms, walls, floors, ceilings and bathrooms. • New access ramp to community room removing bars. • Enlarge windows. • Solar installations o With optimizers due to shading from nearby trees o Batteries (around 8 to 10Kwh) • Reinstate fire exit and remove black protection bars from east side of building. • Construction of a new a new storage cupboard to store tables and chairs. • Shutter style door to protect entrance on the disability ramp. • Sensory pod o Our preference Sensory Pod attached. With steps, screen and wrapped in custom branding including delivery and installation was £8,500. • New changing area with link through door. • Two new shower cubicles and toilets for football side of the building. • Kitchen window changed to a service hatch to serve food if required on football. • Installation of a fire alarm and correct fire extinguishers. Currently no fire alarm installed in current building. • To work with our current CCTV provider and install CCTV is the main room and entrance. (OSE https://www.osesecurity.co.uk/) • New kitchen area o Sink o Sockets for microwave, kettle, water boiler, panni press, air fryer and a couple spare. o Dishwasher Budget: Up to the value of £150,000 Completion: Stratton St Margaret Parish Council would like this finished and in use by November 2025. Site visits: If you require a site visit please contact Chris Matthews, Deputy Clerk at Meadowcroft Community Centre, Addison Crescent, Swindon or on 01793 823761 or email Chris.matthews@strattonstmargaret.gov.uk
Published contracts in the last 12 months
3
total contracts
£160k
total value
£53,333
average contract size
Typical categories