Loading page content…
Loading page content…
Loading contract search results…
Loading contract details…
| Source: | Contracts Finder |
| Notice Type: | Award notice |
| Buyer: | North Somerset Council |
| Main Category: | Works |
| Procurement Method: | Open procedure |
| Tender Status: | Closed |
Pipeline status
Not addedImports the contract into your BidWriter pipeline · Qualify before you commit to bid
Application Deadline
24 November 2023
Closed
Estimated Value
£450,000
Need help writing this bid?
Our specialists write winning tender responses. Free consultation, no obligation.
Book a free consultation →| Estimated Value (ex. VAT): |
| £450,000 |
| Release Date: | 19 February 2024 |
| Application Deadline: | 24 November 2023 |
| Contract Start Date: | 30 January 2024 |
| Contract End Date: | 12 April 2024 |
| Contract Duration: | 2 months |
| Procurement ID (OCID): | ocds-b5fd17-56dd7d3e-030c-45fc-b390-c1f40a27bad2 |
| Notice Reference: | f924994d-d929-4260-986a-5ab1d07d2a1b-724548 |
All 2 notices for this procurement, oldest first.
South Road Retaining Wall Strengthening, Weston super Mare. North Somerset
South Road Retaining Wall Strengthening, Weston super Mare. North Somerset
Earlier notices predate the Procurement Act 2023 (commenced 24 Feb 2025) and therefore don't carry UK1–UK17 codes.
View Original Notice
Access the full notice on the official portal
Awarded to
| Award value: | £478,402 |
| Award decision date: | 29 January 2024 |
| Award status: | Active |
The South Road retaining wall in Weston super Mare is showing signs of movement, including cracking and deflections, leading to significant cracking, rutting and depressions in the footway at the crest. The retaining wall (retaining/adjacent to a South Road highway) has a retained height of up to approximately 4.3m, plus a parapet upstand of approximately 1.0m. The wall supports South Road, with an approximately 6m wide carriageway and footways on both sides of the road each approximately 1.5m wide. The footway adjacent to the retaining wall is currently closed along the length of the wall requiring remediation, but the carriageway remains open.\r \r The proposal is to procure a civil engineering works contractor to undertake strengthening of the retaining wall to ensure its structural stability and to safeguard the local highway for the residents. The works will involve:\r • Works site setup including welfare unit, management, security and any required temporary works design & installation.\r • Supply, installation and management of required Traffic Management plans, traffic diversion signs and/or temporary traffic lights around the proposed works areas. \r • Removal of approximately 20m long unstable retaining wall.\r • Installation of around 167 number of Soil Nails along the 80m length of existing Retaining wall.\r • Rebuilding of approximately 20m long retaining wall with new materials.\r • Excavate around 80m length of carriageway and footpath for replacing the collapsed highway drainage. \r • Installation of new highway drainage system of around 80m length of road.\r • Rebuilding the carriageway and footpath with new materials to replicate the existing carriageway construction details.\r
Published contracts in the last 12 months
172
total contracts
£193.5m
total value
£2,331,341
average contract size
Typical categories
Concession Opportunity for the Provision of NSC Fleet and Public Installation of Electric Vehicle Charging Points
North Somerset Council · WAC-626449
Leisure Management for Parish Wharf and Strode Leisure Centres
North Somerset Council · WAC-622338
VLC Pupil Referral Unit Employer's Agent
North Somerset Council · WAC-615653