Loading page content…
Loading page content…
Loading contract search results…
Loading contract details…
| Source: | Contracts Finder |
| Notice Type: | Award notice |
| Buyer: | TEC Partnership |
| Main Category: | Works |
| Procurement Method: | Open procedure |
| Tender Status: | Closed |
| Estimated Value (ex. VAT): | Not specified |
| Release Date: | 20 February 2024 |
| Application Deadline: | 16 February 2024 |
| Contract Start Date: | 7 April 2024 |
View Original Notice
Access the full notice on the official portal
🤝 Need a consortium or subcontracting partner?
SMEs & Primes team up to win opportunities like this. Find partners on the board.
Awarded to
| Award value: | £445,408.72 |
| Award decision date: | 20 February 2024 |
| Award status: | Active |
The project comprises of replacing the roof covering on our B Block building. This will require removing the existing roof and insulation before replacing. There are some structural repairs required to the parapet walling that will need to be conducted during this process. The details of this can be seen in document Rde6334. In accordance with the Rde6334 recommendation, masonry repair is also required on the tower block, as seen in image 1. It is proposed that the parapet walling is reduced to the height required to provide the adequate uplift for the replacing roofing, so a replacement capping system can be installed. Enabling works for one section of roofing, will require the removal of an existing timber structure (image 2). The proposed roofs are to be Sika liquid plastic and installed to accompanying specification (alternative products will be considered). Full standards and services can be found in the Specification Document appended to this ITT - 0409764 Technical Specifications.pdf and PEU - 00734 cut to falls design. The final stage of the project will be installing edge protection (image 3) Other documents appended to this ITT: o 01 Site Location Plan o 02 B Block roof plan o 040964 Site Survey Reports.pdf o Rde6334 Structural survey o PEU - 00734 cut to falls design o Image 1 - wall repair o Image 2 - Timber frame removal o Image 3 - indicating edge protection area Document 03 phase drawing is color coded into four sections. Section 1 (yellow) is the main focus of the works and the other elements will be decided on based on the overall project cost. Please ensure that your tender break down clearly states these itemised components. Section 1 - Yellow Section 2 - Blue Section 3 - Green Section 4 - Purple
Published contracts in the last 12 months
29
total contracts
£2.1m
total value
£165,333
average contract size
Typical categories
Pipeline status
Not addedImports the contract into your BidWriter pipeline · Qualify before you commit to bid
Application Deadline
16 February 2024
Closed
Need help writing this bid?
Our specialists write winning tender responses. Free consultation, no obligation.
Book a free consultation →| Contract End Date: |
| 27 May 2024 |
| Contract Duration: | 2 months |
| Procurement ID (OCID): | ocds-b5fd17-2038c6ca-7cbd-4a40-b7c9-cfc0d2fbf0e4 |
| Notice Reference: | b202c5dd-a582-4909-ae35-84bb27176e23-725079 |