Loading page content…
Loading page content…
Loading contract search results…
Loading contract details…
| Source: | Contracts Finder |
| Notice Type: | Award notice |
| Buyer: | NATIONAL NUCLEAR LABORATORY LIMITED |
| Main Category: | Services |
| Procurement Method: | Negotiated procedure without prior publication (above threshold) |
| Tender Status: | Closed |
| Estimated Value (ex. VAT): | £27,400 |
| Release Date: | 28 February 2024 |
| Application Deadline: | 19 January 2024 |
| Contract Start Date: | 27 February 2024 |
View Original Notice
Access the full notice on the official portal
🤝 Need a consortium or subcontracting partner?
SMEs & Primes team up to win opportunities like this. Find partners on the board.
Awarded to
| Award value: | £27,400 |
| Award decision date: | 19 January 2024 |
| Award status: | Active |
Non-active electrochemistry data for AGR cladding has been generated and modelling evaluation was carried out by NPL, using the newly measured data to guide inputs, to predict susceptibility of the fuel cladding to SCC in caustic conditions. Following these initial experiments, additional non-active testing has been carried out and subsequent further modelling tasks and development have been recommended. NPL will carry out the following Tasks: • Investigation of the sensitivity of the modelling results (tip acidification and tip chloride accumulation) to the transfer coefficient related to the cathodic reaction. • Investigation of the sensitivity of the modelling results (tip acidification and tip chloride accumulation) to the passive current density. • Modify previous COMSOL simulation model of crack electrochemistry for advanced gas-cooled reactor stainless steel cladding in pond storage to include the presence of boric acid. • Modify the model to account for the dependency of the crack-tip current density on the local electrode potential. • Assess numerical convergence issues related to the very sharp change in electrode kinetics between the crack walls and crack-tip and endeavour to resolve. • NPL report containing the modifications to the previous model and example of results. • Modify COMSOL model
New Cutting Capability
NATIONAL NUCLEAR LABORATORY LIMITED · WAC-30287
Supply and/or Design of Centrifugal Contactors and Associated Control System - Request for Information
NATIONAL NUCLEAR LABORATORY LIMITED · WAC-353364
Hardware Security Modules Deployment solution - EOI
NATIONAL NUCLEAR LABORATORY LIMITED · WAC-354002
Pipeline status
Not addedImports the contract into your BidWriter pipeline · Qualify before you commit to bid
Application Deadline
19 January 2024
Closed
Estimated Value
£27,400
Need help writing this bid?
Our specialists write winning tender responses. Free consultation, no obligation.
Book a free consultation →| Contract End Date: | 28 June 2024 |
| Contract Duration: | 4 months |
| Procurement ID (OCID): | ocds-b5fd17-89c71dd5-926c-4379-89b6-cb0791c01c14 |
| Notice Reference: | abf8da42-b4c7-4cd0-b283-2eb8a9574de7-727493 |