| Source: | Contracts Finder |
| Notice Type: | Award notice |
| Buyer: | Gloucestershire County Council |
| Main Category: | Works |
| Procurement Method: | Open procedure |
| Tender Status: | Closed |
| Estimated Value (ex. VAT): | £2,500,000 |
Pipeline status
Not addedImports the contract into your BidWriter pipeline · Qualify before you commit to bid
Application Deadline
4 October 2019
Closed
Estimated Value
£2,500,000
Need help writing this bid?
Our specialists write winning tender responses. Free consultation, no obligation.
Book a free consultation →| Release Date: | 17 April 2024 |
| Application Deadline: | 4 October 2019 |
| Contract Start Date: | 2 December 2019 |
| Contract End Date: | 16 October 2020 |
| Contract Duration: | 11 months |
| Procurement ID (OCID): | ocds-b5fd17-98d50a3e-6351-4450-bd28-8d8d665cca9a |
| Notice Reference: | 49f18a14-ab09-400a-a17c-f7dffea2acda-741926 |
View Original Notice
Access the full notice on the official portal
Awarded to
| Award value: | £2,500,000 |
| Award decision date: | 7 November 2019 |
| Award status: | Active |
The scheme shall ultimately deliver the construction of the canal through the A38 Whitminster Roundabout. The scheme shall include the construction of two new bridges, a canal channel within the roundabout and a towpath under the bridge, the work consists of the following: - • The procurement, design and construction of two precast segmental box culverts (16m length, 7.45m clear span and 4.69m internal height). To include headwall beam and N2 parapets. • Coordination of utility diversions including Severn Trent Water Main and W&W Gas Main. • Coordination of utility lifting and protection to include 13No BT Ducts, Vodafone, 2 No CityFibre, 2 No COLT and Virgin Media. This will include procurement, design and erection of a service bridge to carry existing BT ducts when lifted to the required height. • Construction of 6 No contiguous bore piled wing walls • Construction of 2 No modular concrete block wing walls • Construction of a canal channel between the two bridges within the centre of the roundabout, to include provision of a towpath and embankment retaining wall. • Carriageway surfacing, kerbing and footpath amendments where the carriageway level will require raising to pass over the bridges. • Partial replacement of the street light system on the roundabout • Installation of N2 Vehicle Restraint Systems on the bridge approaches • Installation of pedestrian guard railing • Drainage amendments and partial culverting of the southern drainage ditch. Installation of 2 No oil interceptors prior to discharge into the canal. • General vegetation and tree removal • Excavation and transportation of up to 14,000m3 of material to a site in Northleach where it will require placement over a designated field. • Replacement of road signs • Roadmarking reinstatement • Provision of 2 No ladders and horizontal recycled plastic fenders to be fixed to the towpath retaining wall • Media support during construction including time-lapse cameras, webcam and regular aerial images. Tender period :30th August 2019 to 4th October 2019 Anticipated Works Start Date :2nd December 2019 Completion :16th October 2020 Indicative Value :£2.5m The proposed procurement route will be a single stage (sub-OJEU Open Procedure) using the NEC4 ECC form of Contract, Option A Priced Contract with Activity Schedule. Full details will be available in the tender pack.