Loading page content…
Loading page content…
Loading contract search results…
Loading contract details…
| Source: | Contracts Finder |
| Notice Type: | Award notice |
| Buyer: | Kent County Council |
| Main Category: | Works |
| Procurement Method: | Other - |
| Tender Status: | Closed |
| Estimated Value (ex. VAT): | £60,539.82 |
Pipeline status
Not addedImports the contract into your BidWriter pipeline · Qualify before you commit to bid
Application Deadline
28 February 2024
Closed
Estimated Value
£60,539.82
Need help writing this bid?
Our specialists write winning tender responses. Free consultation, no obligation.
Book a free consultation →| Release Date: | 23 April 2024 |
| Application Deadline: | 28 February 2024 |
| Contract Start Date: | 31 March 2024 |
| Contract End Date: | 10 May 2024 |
| Contract Duration: | 1 month |
| Procurement ID (OCID): | ocds-b5fd17-9f324666-cc52-49c6-adaa-813d445c98e1 |
| Notice Reference: | 7fb24750-bc6b-495e-87ba-ea4c5f923e6e-743373 |
View Original Notice
Access the full notice on the official portal
Awarded to
| Award value: | £60,539.82 |
| Award decision date: | 12 March 2024 |
| Award status: | Active |
The Drainage Works Framework 2023 (SC22331) is used to support Kent County Council's current contracts (Highway Term Maintenance Contract, Road Asset Renewal Contract and others) to maintain it network. Works under £25k are awarded via direct award on a rotation basis. Works over £25k are awarded via a mini-competition process. This notice pertains to a mini-competition exercise that was carried out under the Drainage Works Framework 2023. Details of this mini-competition are below listed below: Aim: to find a Contractor to deliver the A20 Maidstone Road, Charing scheme. Dates: The scheme needs to be delivered between 1 April 2024 to 10 May 2024 - The scheme is to deliver the following outputs: • 2-way traffic lights required with Manual control at all times between hours 7am to 7pm and adjoining traffic not signal controlled and traffic under signal control sign in the junction of the housing estates • Footway closure to install 7 new gully pots (KCC/HTW/500/009) and connect to existing ditch with a total of 50m of new 150mm twinwall pipe with type z surround (KCC/HTW/500/051). • Clear out 220m ditch and remove spoil from site. • Plain out (5.47m x 148.35m - shown on plans below) 811sqm of the carriageway at 45mm thick and relay with HRA 35/14 with coated chippings 14/20mm PSV 65 at 45mm thick and replace all road markings that may have been removed. • Reinstate 10sqm of the footway with 50mm of 20mm base course and 20mm of 6mm surface course • All works to be carried out to KCC standard drawings and can only be changed by written consent of the engineer.
Published contracts in the last 12 months
368
total contracts
£15472.1m
total value
£113,765,559
average contract size
Typical categories