Loading page content…
Loading page content…
Loading contract search results…
16 matching procurements · Click a result to see its full lifecycle · Updated daily · Contracts Finder + Find a Tender Service
Scope/ What Will Be Required Costain have been appointed to deliver contract HRS02, the Tunnel and Lineside Mechanical and Electrical services for HS2 ltd. A high-speed railway project that connects London to Birmingham with plans to extend in the future. Package 8 fans and associated equipment scope for contract HRS02 consists of fans and the associated equipment within the headhouses and tunnel areas of the railway, the route being circa 180 km in length, inclusive of; -Ventilation Fans -Construction Ventilation Fans -Associated VSDs -Associated Panels Costain require a supplier for design and supply only of the fans and associated equipment package. Costain and HS2 are looking for innovative and smart solutions that provide benefits in the following key areas; -Health and Safety -Programme - Installation and commissioning efficiency -Cost -Quality and Assurance efficiency -Whole life cost -Carbon efficiency All the innovation and design development must be accompanied with a rigorous approach to ensuring that the technical requirements are met. Including testing, where necessary. The scope of the design and supply will include the following; -Support to Costain's design partner through concept and detailed design -Ventilation analysis, modelling and calculations -Testing of products and arrangements -Provision of samples and mock ups -Commissioning support, as required Full details of the scope and specifications will be provided to the successfully shortlisted suppliers. Suppliers should be aware of the scale of the HS2 project and are to assess their internal capabilities to be able to carry out the intended scope of works prior to completing the expression of interest. About the Buyers Selection Process This will be a competitive procurement process which will be completed in line with both the Costain and HS2 procurement rules to ensure a fair process throughout. The selection process will include assessment against a number of key criteria listed below; a) Cost b) Whole Life Cost and Maintenance c) Programme d) Health and Safety e) Quality f) Equality, diversity and inclusion g) Skills, Employment and Education h)Environment and Sustainability Respondents to this opportunity should be advised that prior to shortlisting, the Buyer will undertake a rigorous due diligence process including a Pre-Qualification Questionnaire. Unsuccessful applicants will be advised via e-mail or the Buyer's Procurement Portal, successful shortlisted applicants will be invited to tender through the Buyer's Procurement Portal. Proposals from Tenderers will be evaluated against a pre-agreed commercial and non-commercial award criteria. Costain Reserves the right to split this package and award the scope to multiple suppliers.
From £5,000,000
Contract value
Scope/ What Will Be Required Costain have been appointed to deliver contract HRS02, the Tunnel and Lineside Mechanical and Electrical services for HS2 ltd. A high-speed railway project that connects London to Birmingham with plans to extend in the future. Package 5 for the Lighting and Lighting controls scope for contract HRS02 consists of lighting and the lighting controls (inclusive of Active Signage) for the tunnel and open route sections of the railway, the route being circa 180 km in length, inclusive of; -Tunnel Lighting -Junction Lighting -Walkway Lighting -Cross Passage Active Signage -Lighting Controls Equipment Costain require a supplier for design and supply only of the lighting and associated controls package. Costain and HS2 are looking for innovative and smart solutions that provide benefits in the following key areas; -Health & Safety -Programme - Installation and commissioning efficiency -Cost -Quality and Assurance efficiency -Whole life cost -Carbon efficiency All the innovation and design development must be accompanied with a rigorous approach to ensuring that the technical requirements are met. Including testing, where necessary. The scope of design and supply will include the following; -Support to Costain's design partner through concept, scheme and detailed design -Lighting analysis and calculations -Testing of products and arrangements -Supply of lighting and lighting controls products and the associated equipment -Provision of samples and mock ups -Commissioning support, as required Full details of the scope and specifications will be provided to the successfully shortlisted suppliers. Suppliers should be aware of the scale of the HS2 project and are to assess their internal capabilities to be able to carry out the intended scope of works prior to completing the expression of interest.
From £2,500,000
Contract value
P1 Brackets and Cable Management System - Costain HRS02 Tunnel and Lineside M&E Scope/ What Will Be Required Costain have been appointed to deliver contract HRS02, the Tunnel and Lineside Mechanical and Electrical services for HS2 ltd. A high-speed railway project that connects London to Birmingham with plans to extend in the future. Package 1 Brackets and Cable Management system scope associated to contract HRS02 consists of brackets and cable management systems for the route of the railway, the route being circa 180km in length, inclusive of; -Tunnel Bracketry and associated fixings -Cross Passage Bracketry and associated fixings -Ladder Rack and Associated fixings -Cable Tray and associated fixings -Trunking and associated fixings Costain require a supplier to design and supply only of the bracket and cable management system. Costain and HS2 are looking for innovative and smart solutions that provide benefits in the following key areas. -Health and Safety -Programme - Installation and Commissioning activities -Cost -Quality and Assurance Efficiency -Whole Life Cost -Carbon Efficiency All the innovation and design development must be accompanied with a rigorous approach that the technical requirements are met. Including testing where necessary. The scope of design and supply will include the following: -Support to Costain's design partner through concept and detailed design -Bracketry and Containment testing (Fatigue and Fire) -Supply of bracketry and cable management system products and the associated fixings -Provision of samples and mock ups Full details of the scope and specifications will be provided to the successfully shortlisted suppliers. Suppliers should be aware of the scale of the HS2 project and are to assess their internal capabilities to able to carry out the intended scope of works prior to completing the expression of interest.
From £5,000,000
Contract value
Scope/ What Will Be Required Costain have been appointed to deliver contract HRS02, the Tunnel and Lineside Mechanical and Electrical services for HS2 ltd. A high-speed railway project that connects London to Birmingham with plans to extend in the future. Package 4 the transformers, switches and sockets scope associated to contract HRS02 consists of supply of transformers, switches and sockets for the tunnel and open route sections of the railway, the route being circa 180 km in length, inclusive of; -Sockets and Transformers 110v - 230v -Sockets and Transformers 400v - 690v -Maintenance Transformers -ATS Isolators -ATS Isolator Switches -Auto Transformer Switches -Isolation Transformers Costain require a supplier for supply only of the Transformers, Switches and Sockets package. Costain and HS2 are looking for innovative and smart solutions that provide benefits in the following key areas; -Health & Safety -Programme - Installation and commissioning efficiency -Cost -Quality and Assurance efficiency -Whole life cost -Carbon efficiency The scope of supply will include the following; -Supply of Sockets and Transformers -Supply of Isolators -Supply of Auto Transformer Switches -Provision of samples and mock ups Full details of the scope and specifications will be provided to the successfully shortlisted suppliers. Suppliers should be aware of the scale of the HS2 project and are to assess their internal capabilities to be able to carry out the intended scope of works prior to completing the expression of interest.
From £5,000,000
Contract value
Costain have been appointed to deliver contract HRS02, the Tunnel and Lineside Mechanical and Electrical services for HS2 ltd. A high-speed railway project that connects London to Birmingham with plans to extend in the future. Package 9 for the UPS and associated cubicles scope for contract HRS02 consists of supply of UPS systems and the associated batteries and cubicles for the open route sections of the railway, the route being circa 180 km in length, inclusive of; -UPS System -Batteries for UPS System -UPS and Battery Cubicles -Factory Acceptance Testing Costain require a supplier for supply only of the UPS and associated batteries and cubicles. Costain and HS2 are looking for innovative and smart solutions that provide benefits in the following key areas; -Health & Safety -Programme - Installation and commissioning efficiency -Cost -Quality and Assurance efficiency -Whole life cost -Carbon efficiency The scope of design and supply will include the following; -Supply of UPS System -Supply of Batteries for UPS System -Supply of UPS and Battery Cubicles -Provision of samples and mock ups -Factory Acceptance Testing Full details of the scope and specifications will be provided to the successfully shortlisted suppliers. Suppliers should be aware of the scale of the HS2 project and are to assess their internal capabilities to be able to carry out the intended scope of works prior to completing the expression of interest.
From £5,000,000
Contract value
Scope/ What Will Be Required Costain have been appointed to deliver contract HRS02, the Tunnel and Lineside Mechanical and Electrical services for HS2 ltd. A high-speed railway project that connects London to Birmingham with plans to extend in the future. Package 14 Thermal Insulation scope for contract HRS02 consists of provision of a thermal insulation for the services within the tunnel and portal sections of the railway, these areas totalling circa 6km in length inclusive of; -Thermal Insulation -Trace Heating cable and controllers Costain require a supplier for supply only of the Thermal Insulation and trace heating. Costain and HS2 are looking for innovative and smart solutions that provide benefits in the following key areas; -Health & Safety -Programme - Installation and commissioning efficiency -Cost -Quality and Assurance efficiency -Whole life cost -Carbon efficiency The scope of supply will include the following; -Supply of the Thermal Insulation -Supply of Trace Heating, cable and controllers -Provision of samples and mock ups Full details of the scope and specifications will be provided to the successfully shortlisted suppliers. Suppliers should be aware of the scale of the HS2 project and are to assess their internal capabilities to be able to carry out the intended scope of works prior to completing the expression of interest.
From £250,000
Contract value
Costain have been appointed to deliver contract HRS02, the Tunnel and Lineside Mechanical and Electrical services for HS2 ltd. A high-speed railway project that connects London to Birmingham with plans to extend in the future. Package XX Tunnel Ventilation Attenuators scope for contract HRS02 consists of sound attenuators within the headhouses and ventilation shaft areas of the railway, the route being circa 180 km in length, inclusive of; - Tunnel Ventilation Fan Attenuators - Acoustic Panelling - Testing Costain require a supplier for design and supply only of the tunnel ventilation attenuator package. Costain and HS2 are looking for innovative and smart solutions that provide benefits in the following key areas; - Health and Safety - Programme - Installation and commissioning efficiency - Cost - Quality and Assurance efficiency - Whole life cost - Carbon efficiency All the innovation and design development must be accompanied with a rigorous approach to ensuring that the technical requirements are met. Including testing, where necessary. The scope of the design and supply will include the following; - Support to Costain's design partner through concept and detailed design - Noise analysis, modelling and calculations - Testing of products and arrangements - Provision of samples and mock ups - Commissioning support, as required Full details of the scope and specifications will be provided to the successfully shortlisted suppliers. Suppliers should be aware of the scale of the HS2 project and are to assess their internal capabilities to be able to carry out the intended scope of works prior to completing the expression of interest.
From £5,000,000
Contract value
Costain have been appointed to deliver contract HRS02, the Tunnel and Lineside Mechanical and Electrical services for HS2 ltd. A high-speed railway project that connects London to Birmingham with plans to extend in the future. Package 15 Dampers and Actuators scope for contract HRS02 consists of dampers and actuators within the headhouses and ventilation shaft areas of the railway, the route being circa 180 km in length, inclusive of; - Fan Isolation Dampers - Tunnel Isolation Dampers - Associated Actuators and Limit Switches - Associated Panels Costain require a supplier for design and supply only of the damper and actuator package. Costain and HS2 are looking for innovative and smart solutions that provide benefits in the following key areas; - Health and Safety - Programme - Installation and commissioning efficiency - Cost - Quality and Assurance efficiency - Whole life cost - Carbon efficiency All the innovation and design development must be accompanied with a rigorous approach to ensuring that the technical requirements are met. Including testing, where necessary. The scope of the design and supply will include the following; - Support to Costain's design partner through concept and detailed design - Ventilation analysis, modelling and calculations - Testing of products and arrangements - Provision of samples and mock ups - Commissioning support, as required Full details of the scope and specifications will be provided to the successfully shortlisted suppliers. Suppliers should be aware of the scale of the HS2 project and are to assess their internal capabilities to be able to carry out the intended scope of works prior to completing the expression of interest.
From £2,500,000
Contract value
Costain have been appointed to deliver contract HRS02, the Tunnel and Lineside Mechanical and Electrical services for HS2 ltd. A high-speed railway project that connects London to Birmingham with plans to extend in the future. Package 21 Logistics scope for contract HRS02 consists of provision of Logistics services to support delivery of the of the railway, the route being circa 180 km in length, inclusive of; -Provision of Consolidation Centre and/ or warehouses -Provision of labour for the logistics support service -Provision of logistics system and/or database -Provision of logistics transportation Costain require a supplier for the logistics service. Costain and HS2 are looking for innovative and smart solutions that provide benefits in the following key areas; -Health and Safety -Programme -Cost -Quality and Assurance efficiency -Whole life cost -Carbon efficiency All the innovation must be accompanied with a rigorous approach to ensuring that the requirements are met. Including testing, where necessary. Full details of the scope and specifications will be provided to the successfully shortlisted suppliers. Suppliers should be aware of the scale of the HS2 project and are to assess their internal capabilities to be able to carry out the intended scope of works prior to completing the expression of interest.
From £5,000,000
Contract value
Costain have been appointed to deliver contract HRS02, the Tunnel and Lineside Mechanical and Electrical services for HS2 ltd. A high-speed railway project that connects London to Birmingham with plans to extend in the future. Package 19 Maintenance scope for contract HRS02 consists of the maintenance of 29 no of building assets along the route, the route being circa 180 km in length, inclusive of; -Cleaning -Landscaping -Facilities Management -Regular checks and reporting Costain require a supplier for supply and delivery only of the maintenance package. Full details of the scope and specifications will be provided to the successfully shortlisted suppliers. Suppliers should be aware of the scale of the HS2 project and are to assess their internal capabilities to be able to carry out the intended scope of works prior to completing the expression of interest.
From £500,000
Contract value
Scope/ What Will Be Required Costain have been appointed to deliver contract HRS02, the Tunnel and Lineside Mechanical and Electrical services for HS2 ltd. A high-speed railway project that connects London to Birmingham with plans to extend in the future. Package 22 Security scope for contract HRS02 consists of the security of 29 no of buildings and compounds along the route, the route being circa 180 km in length, inclusive of; -Temporary Security Provision including CCTV -24/7 Security Coverage to be provided by Security presence or roaming patrols -Access and Control of people attending the sites -Regular checks and reports -Manning Security Control Centre Costain require a supplier for supply and delivery only of the security package. Full details of the scope and specifications will be provided to the successfully shortlisted suppliers. Suppliers should be aware of the scale of the HS2 project and are to assess their internal capabilities to be able to carry out the intended scope of works prior to completing the expression of interest.
From £5,000,000
Contract value
Scope/ What Will Be Required Costain have been appointed to deliver contract HRS02, the Tunnel and Lineside Mechanical and Electrical services for HS2 ltd. A high-speed railway project that connects London to Birmingham with plans to extend in the future. Package P20 Rail Plant scope associated with contract HRS02 consists of supply, maintenance and operation of rail plant required to complete the works, inclusive (but not limited to) of the follow types of on-track plant: -Rail-road vehicles (RRVs) -Trailers -Flatbeds -Locomotives -Wagons -Welfare units And operatives for the above such as: -Rail Plant Operatives (Drivers, Shunters, etc) -Specialist plant maintainers -Logistics controllers Costain require a supplier to support the design and pre-construction period to ensure the plant provided enables the works efficiently, delivers programme security and co-ordinates with the wider project logistics strategy. Costain and HS2 are looking for innovative and smart solutions that provide benefits in the following key areas: -Health and Safety -Programme - Installation and Commissioning activities -Cost -Quality and Assurance Efficiency -Whole Life Cost -Carbon Efficiency Full details of the scope and specifications will be provided to the successfully shortlisted suppliers. Suppliers should be aware of the scale of the HS2 project and are to assess their internal capabilities to able to carry out the intended scope of works prior to completing the expression of interest.
From £5,000,000
Contract value
Costain have been appointed to deliver contract HRS02, the Tunnel and Lineside Mechanical and Electrical services for HS2 ltd. A high-speed railway project that connects London to Birmingham with plans to extend in the future. The HS2 project has 14no dual bore tunnels each of which has a fire main through the length of each bore - totalling approximately 111km of fire main. The tunnel fire mains are connected to falling mains from the various shaft buildings (13no) at intermediate points within the tunnels, and to portal areas at the start/end of each tunnel. Package P23 Tunnel System Fire Main Design scope is for the full design of the tunnel fire main system, including validation and co-ordination of the design already completed by other (Main works civils contractors) who are fitting out the fire main in the shaft and portal areas. Costain require a specialist designer to take the client's performance brief for this system and produce the design to enable construction, testing, commissioning, assurance and handover. Costain and HS2 are looking for innovative and smart solutions that provide benefits in the following key areas. -Health and Safety -Programme - Installation and Commissioning activities -Cost -Quality and Assurance Efficiency -Whole Life Cost -Carbon Efficiency The design development and any innovations must be accompanied with a rigorous approach to ensure that the technical requirements are met. The scope of design will include (but not be limited to) the following: Calculations for pipework sizing and specification including computation fluid dynamics Analysis of stress, expansion, thrust considerations and incorporation into the design Design of bracketry supports, anchors and associate fixings within the tunnel Production of BIM model and drawings outlining the spatial layout and co-ordination of the fire main Co-ordination with other services design, including but not limited to tunnel civils, handrail and bracketry design Support to Costain's overall M&E design partner through concept and detailed design Full details of the scope and project brief/specifications will be provided to the successfully shortlisted suppliers at the next procurement stage. Suppliers should be aware of the scale of the HS2 project and are to assess their internal capabilities to be able to carry out the intended scope of works prior to completing the expression of interest.
From £250,000
Contract value
Costain have been appointed to deliver contract HRS02, the Tunnel and Lineside Mechanical and Electrical services for HS2 ltd. A high-speed railway project that connects London to Birmingham with plans to extend in the future. Package 24 Acoustic Testing scope for contract HRS02 consists of acoustic testing within the tunnels, portal buildings, headhouses and surrounding areas of the railway, the route being circa 180 km in length, inclusive of; - Factory Acceptance Testing of Ventilation Equipment Acoustic Testing - In Tunnel Acoustic Testing - External Ambient Acoustic Testing - Equipment Room Acoustic Testing Costain require a supplier for design and execution only of the acoustic testing. Costain and HS2 are looking for innovative and smart solutions that provide benefits in the following key areas; - Health and Safety - Programme - Installation and commissioning efficiency - Cost - Quality and Assurance efficiency - Whole life cost - Carbon efficiency All the innovation and design development must be accompanied with a rigorous approach to ensuring that the technical requirements are met. Including testing, where necessary. The scope of the design and supply will include the following; - Support to Costain's design partner through concept and detailed design - Noise analysis, modelling and calculations - Testing of products and arrangements - Commissioning support, as required Full details of the scope and specifications will be provided to the successfully shortlisted suppliers. Suppliers should be aware of the scale of the HS2 project and are to assess their internal capabilities to be able to carry out the intended scope of works prior to completing the expression of interest.
From £250,000
Contract value
Scope/ What Will Be Required Costain have been appointed to deliver contract HRS02, the Tunnel and Lineside Mechanical and Electrical services for HS2 ltd. A high-speed railway project that connects London to Birmingham with plans to extend in the future. Package 25 PRAMS scope for contract HRS02 consists of PRAMS within the scope of the entire Open Route and Tunnel M&E HRS02 Scope, delivering and developing reports at multiple design stages inclusive of; - PRAMS Data for various systems to meet MTBS, MART and MTBF requirements - Reliability and Availability analysis of the Open Route sub LV distribution systems - Support PRAMS Data preparation feeding into the final SIL Report and Certificate (by others). All the innovation and design development must be accompanied with a rigorous approach to ensuring that the technical requirements are met. Including testing, where necessary. Full details of the scope and specifications will be provided to the successfully shortlisted suppliers. Suppliers should be aware of the scale of the HS2 project and are to assess their internal capabilities to be able to carry out the intended scope of works prior to completing the expression of interest.
From £250,000
Contract value
Costain have been appointed to deliver contract HRS02, the Tunnel and Lineside Mechanical and Electrical services for HS2 ltd. A high-speed railway project that connects London to Birmingham with plans to extend in the future. The project requires all electronic and electrical plant, (including systems sub-systems and components) forming part of the railway to be designed and installed to operate, be electrically safe and compatible with other HS2 plant, as well as being compatible with plant from outside the HS2 environment or plant provided by third parties. The project will adhere to established industry approaches, standards, and legal requirements, including the application of BS EN 50121 for EMC and the adoption of BS EN 50122 and BS7671 for electrical safety and E&B. Package P26 refers to the Electro-Magnetic Compatibility (EMC) Management Consultancy. The EMC Management Consultant will lead the Contractor's electrical system compatibility activities during design, construction, testing and commissioning to ensure that relevant electrical system requirements are met. This includes • provision of documentation in respect of these activities; • compliance with the requirements of the Hs2 EMC strategies and procedures, or guidance documents • attendance at relevant meetings including HAZID/HAZOP workshops and interdisciplinary or system-level reviews • provision of support and assistance to the Contractor, Hs2 Project Manager, Employer and Others as necessary to enable HS2 to obtain regulatory approval and authorisation; and • provision of support and assistance to the Contractor, Hs2 Project Manager, Employer as necessary to define interfaces between the works and the works of the other Railway Systems Contractors and Others. The EMC Management Consultant will be appointed to manage how the project will govern all EMC requirements associated with the works. This is to ensure EMC obligations are met with evidences. Responsibilities will include ensuring the safe and reliable operation of all permanent equipment within the environment ensuring no adverse interference to other systems and equipment. Further to this it is to ensure compliance with the relevant legal EMC requirements, industrial EMC standards and any specific Hs2 requirements. The EMC Management Consultant will ensure that the design and installation of the EMC arrangements associated with the works satisfy the EMC requirements, ensuring the safety of persons, including from electro-magnetic fields (EMF) in accordance with the EMF Directive 2013/35/EU.
From £150,000
Contract value