The Trust is looking to increase the number of available bed spaces throughout the main ward by converting some non-clinical existing rooms to side rooms and also to increase bed numbers in some bays.
The scope of works details which areas are to be changed and what is required within each space.
For each specific area, individual pricing will be required.
All works will be dependent on the ability to access the spaces and this will be subject to change at short notice. Contractors should carefully consider this when submitting their returns.
Where medical gases are required to be installed from new or reinstated, the contractor will work alongside the Trust incumbent provider - SHJ Medical Gas Specialists
Additional information: The contracting authority considers that this contract may be suitable for economic operators that are small or medium enterprises (SMEs). However, any selection of tenderers will be based solely on the criteria set out for the procurement.
To strip out and refurbish 2no paediatric oncology rooms to the requirements specified within the scope of works documents. The contractor Must evidence their suitability for this project as per the supplementary questionnaire and be able to commence works by mid-March 2025 (subject to receipt of purchase order). They must also be in a position to complete ALL works within a period of four/five weeks and accommodate other contractors carrying out specific works (e.g. medical gases and nurse call installation). Due to the nature of the patients within these rooms, access will not be readily available prior to commencement of the works. To mitigate against this, numerous photographs have been included within this pack as well as room plans with measurements. The contingency sum has also been elevated to 15% to allow for this.
To strip out and refurbish 2no paediatric oncology rooms to the requirements specified within the scope of works documents. The contractor Must evidence their suitability for this project as per the supplementary questionnaire and be able to commence works by mid-March 2025 (subject to receipt of purchase order). They must also be in a position to complete ALL works within a period of four/five weeks and accommodate other contractors carrying out specific works (e.g. medical gases and nurse call installation). Due to the nature of the patients within these rooms, access will not be readily available prior to commencement of the works. To mitigate against this, numerous photographs have been included within this pack as well as room plans with measurements. The contingency sum has also been elevated to 15% to allow for this.