Loading page content…
Loading page content…
| Source: | Contracts Finder |
| Notice Type: | Pipeline / planning |
| Buyer: | GALLIFORD TRY INFRASTRUCTURE LIMITED |
| Main Category: | Construction structures and materials; auxiliary products to construction (except electric apparatus) |
| Procurement Method: | — |
| Tender Status: | Complete |
| Estimated Value (ex. VAT): | Not specified |
Pipeline status
Not addedContract imported automatically · AI writes the response
Application Deadline
18 March 2025
Closed
Need help writing this bid?
Our specialists write winning tender responses. Free consultation, no obligation.
Book a free consultation →| Release Date: | 11 March 2025 |
| Application Deadline: | 18 March 2025 |
| Procurement ID (OCID): | ocds-b5fd17-9b871573-fdb6-49c9-aacd-7ca713d54d9a |
| Notice Reference: | 02a1502e-7f22-46e1-92b3-60999d4ed4e5-832929 |
View Original Notice
Access the full notice on the official portal
NOTIFICATION OF SUBCONTRACT PACKAGE A47 North Tuddenham to Easton Scheme: Galliford Try, as one of the East Region Delivery Integration Partners, is delivering the A47 North Tuddenham to Easton project in the County of Norfolk on behalf of National Highways. This project, which is part of major improvements to the existing A47, replaces the existing single carriageways between North Tuddenham and Easton with a dual carriageway, linking the existing dual carriageway at North Tuddenham to the Southern Norwich Bypass at Easton. The route is offline and crosses the existing A47 at three separate locations. Package: Acoustic Barrier Outline Scope of Works: The scope includes the supply and installation of Environmental Acoustic Barrier to reduce noise impact in the specified location. The barrier is to be installed to the required height and length, using materials designed to meet acoustic performance standards and wind load requirements. Full details and specifications will be provided to the successfully shortlisted suppliers. Suppliers should be aware of the scale of this project and should assess their internal capabilities to be able to carry out the intended scope of works, prior to completing this expression of interest (EOI). All interested contractors should hold all the relevant certification, qualifications and experience of providing this type of work. Programme: It is anticipated that the above scope of works will commence in June 2025 Timing: Deadline for Notifications of Interest 17:30 hrs on 18th March 2025 Galliford Try Procurement Process: To secure work with Galliford Try, a supplier will need to pass the PAS91 onboarding process administered through Builders Profile. Details will be shared with shortlisted Subcontractors. If this package is of interest to your Company, please contact our procurement team by e-mail via the following email address: a47procurement@gallifordtry.co.uk, by the above deadline with your notification of interest and details of your capabilities, including the package title within the subject of the email. Any notifications of interest after the above deadline will not receive a response.
A47 Blofield to North Burlingham - REINFORCED SOIL STRUCTURE (INSTALLATION)
GALLIFORD TRY INFRASTRUCTURE LIMITED · WAC-35503
A47 Tuddenham to Easton - REINFORCED SOIL STRUCTURE (INSTALLATION)
GALLIFORD TRY INFRASTRUCTURE LIMITED · WAC-35687
A47 Blofield - Mastic Joint Sealing
GALLIFORD TRY INFRASTRUCTURE LIMITED · WAC-37082