Loading page content…
Loading page content…
Loading contract search results…
Loading contract details…
| Source: | Find a Tender Service (FTS) |
| Notice Type: | Pipeline / planning |
| Buyer: | Arc Property Services Partnership Limited |
| Main Category: | Works |
| Procurement Method: | Open procedure |
| Tender Status: |
| Pre-tender |
| Estimated Value (ex. VAT): | £11,000,000 |
| Estimated Value (inc. VAT): | £13,200,000 |
| Release Date: | 4 June 2026 |
| Application Deadline: | 3 July 2026 |
| Enquiry Deadline: | 26 June 2026 |
| Procurement ID (OCID): | ocds-h6vhtk-06a637 |
| Notice Reference: | 052854-2026 |
All 2 notices for this procurement, oldest first.
AP25177 - Mechanical Engineering Framework
AP25177 - Mechanical Engineering Framework
Ready to bid on this contract?
BidWriter AI writes your tender response in minutes — import this contract in one click.
| Call-off method: | Direct call-off (no competition) |
| Maximum operators: | 1 |
Arc Property Services Partnership Limited (the “Client”) intends to procure a single-supplier framework agreement for the provision of a comprehensive range of mechanical engineering works acrossthe operational estate that it manages on behalf of Nottinghamshire County Council (NCC). The Framework will provide access to a suitably qualified and experienced Contractor capable of delivering planned works on an as-required basis. The services will support the Client’s construction, maintenance, and asset management activities across multiple sites. The scope of services to be delivered under the Framework includes, but is not limited to: - Plumbing and water systems: installation, maintenance and repair of hot and cold-water services, drainage systems, sanitaryware, thermostatic mixing valves (TMVs), unvented systems, and water hygiene activities. - Heating and mechanical plant: servicing, maintenance and installation of heating systems (including gas, oil, electric and renewable technologies), distribution systems, pressurisation units, and associated plant. - Fuel, gas and energy infrastructure: installation and maintenance of fuel storage systems, gas installations, associated safety systems, detection equipment, and energy infrastructure. - Controls and building management systems (BMS/BEMS): provision, maintenance and modification of controls, sensors, panels, valves and automation systems used to monitor and manage mechanical services. - Installation, alteration and minor works: new installations, replacement works, adaptations to existing pipework systems, removal of redundant systems (including dead legs), strip-out works, and associated making-good of building fabric. - Testing, commissioning and compliance: full testing, commissioning and certification of systems, including statutory compliance, earthing and bonding where applicable, and handover documentation. The Framework will operate under the NEC4 Framework Contract and will enable the Client to commission individual call-off contracts for specific projects or service requirements. Call-off contracts will be arranged via quotation utilising the prices set within the Framework Commercial model. The Framework will cover a geographically dispersed estate, with works located across Nottinghamshire (main area), Derbyshire, South Yorkshire, and Leicestershire. The anticipated initial term of the Framework is two (2) years, with options to extend for a further two (2) years plus one (1) year (2+2+1), giving a maximum potential duration of five (5) years. The 5 years framework is to be utilised to coincide with the current end of Arc Partnership's arrangement with Nottinghamshire County Council. The total value of the Framework over its full term is £13,200,000 (inclusive of VAT), however there is no guarantee as to the value or volume of work provided. The procurement will be conducted in accordance with the Procurement Act 2023 using a competitive flexible procedure, comprising a two-stage process: - Stage 1 - Selection Criteria - The Bidder must meet or exceed the selection criteria based on the required qualifications and experience to confirm that they have the correct capacity, competency and capability to meet the framework requirements. Bidders who receive PASS marks from the selection criteria will then have their selection criteria questions evaluated and the 4 highest scoring bidders will move to stage 2. - Stage 2 - Award Criteria - The remaining Bidders will be asked a series of quality questions and shall provide prices within a commercial model. These will be assessed against a set criteria based on a 70% quality / 30% price evaluation weighting. The highest scoring Bidder will be deemed to have provided the Most Advantageous Tender (MAT) and will be awarded the Framework. The successful supplier will be expected to work collaboratively with the Client, contribute to social value outcomes, support carbon reduction objectives and demonstrate high standards of health and safety, compliance, and service delivery across all commissioned works.
Published contracts in the last 12 months
7
total contracts
£32.8m
total value
£5,469,842
average contract size
Typical categories
Pipeline status
Not addedImports the contract into your BidWriter pipeline · Qualify before you commit to bid
Application Deadline
3 July 2026
29 days left
Estimated Value
£11,000,000
Need help writing this bid?
Our specialists write winning tender responses. Free consultation, no obligation.
Book a free consultation →