| Source: | Find a Tender Service (FTS) |
| Notice Type: | Tender update |
| Buyer: |
| DfI Transport and Road Asset Management (TRAM) |
| Main Category: | Works |
| Procurement Method: | Open procedure |
| Tender Status: | Open |
| Estimated Value (ex. VAT): | £57,000,000 |
| Estimated Value (inc. VAT): | £68,400,000 |
| Release Date: | 21 May 2026 |
| Application Deadline: | 22 June 2026 |
| Enquiry Deadline: | 22 June 2026 |
| Contract Start Date: | 31 August 2026 (Estimated) |
| Contract End Date: | 31 August 2030 (Estimated) |
| Contract Duration: | 4.1 years |
| Procurement ID (OCID): | ocds-h6vhtk-05dc12 |
| Notice Reference: | 047316-2026 |
All 5 notices for this procurement, oldest first.
Road Asset Management (RAM) Structures and Road Restraint Systems Frameworks – *Preliminary Market Engagement*R
Road Asset Management (RAM) Structures and Road Restraint Systems Frameworks – *Preliminary Market Engagement*
DfI TRAM Road Asset Management – Structures Framework
DfI TRAM Road Asset Management – Structures Framework
DfI TRAM Road Asset Management – Structures Framework
Ready to bid on this contract?
BidWriter AI writes your tender response in minutes — import this contract in one click.
View Original Notice
Access the full notice on the official portal
The TSP Receipt Deadline has been amended to 3pm on Monday 22nd June 2026.
| Call-off method: | With mini-competition (call-off via competition) |
This tender notice is for the award of a public contract through an open procedure in accordance with section 20(1) and (2)(a) of the PA 2023. RAM Structures Framework will include the following work activities: A. Full or partial demolition of structures; B. Construction of new structures; C. Scour protection and maintenance works; D. Earthworks; E. Culvert upgrades/maintenance including lining and invert repair works; F. General bridge/structures maintenance; G. Working in water; H. Brickwork, blockwork and stonework; I. Structural concrete construction and/or repairs; J. Installation of precast beams or box culverts; K. Structural steelwork including repairs; L. Inspection assistance M. Works on or in the vicinity of the Northern Ireland Railways (NIR) network requiring £100,000,000 public liability insurance; N. TTM on a live trafficked public road network; O. Associated road restraint systems installation and/or repair (including RRS associated with structures works); P. Associated Ancillary Works. Further ancillary works may be asked of the successful Supplier such as: • Surface reinstatement; • Site clearance including vegetation removal; • Pressure grouting; • Sprayed concrete; • Bridge expansion joints; • Structural steel painting; • Temporary works in and/or around water and/or railways; • Waterproofing for structures The Framework will comprise of three area Lots (Work Orders valued up to £750k exc VAT). A Project Lot will be used to deliver individual NEC ECC projects covering all the geographical areas detailed below (valued between £750,001 and £5m exc VAT). Area Lots; - STF W1 – Derry and Strabane; Fermanagh & Omagh; Mid-Ulster. - STF E&S1 - Belfast; Lisburn and Castlereagh; Ards and North Down; Newry Mourne, Down and Armagh; Banbridge and Craigavon. - STF N1 - Antrim and Newtownabbey; Causeway Coast and Glens; Mid and East Antrim This Framework will deliver works from Call-Off contracts with an overall cumulative value of £57m (ex VAT) over the four-year term. If the Contracting Authority is unable, for any reason, to award a new framework or to put in place an alternative regime to replace this Framework on its termination or expiry, any Call-Off Contract established under the Framework may be extended for a further period or periods up to a maximum of 12 additional months. This may increase the overall cumulative value to £71.25m (ex VAT).
Lot for NEC4 Call-Off Contracts awarded following a mini-competition process for Work Packages valued over £750,001 up to £5m covering all Framework contract areas.
Contract period: 31 August 2026 → 31 August 2030
Measured Term Contract for Structures works within the Derry and Strabane; Fermanagh & Omagh; Mid-Ulster contract area (Works Orders valued up to £750k). The proposed contract relates to works with a cumulative value of £15.4m (ex VAT) over a four year term. If the Contracting Authority is unable, for any reason, to award a new framework or to put in place an alternative regime to replace this Framework on its termination or expiry, any Call-Off Contract established under this Framework may be extended for a further period or periods up to a maximum of 12 additional months. This may increase the value to £19.2m (ex VAT).
Contract period: 31 August 2026 → 31 August 2030
ICC Measured Term Contract for structures works within the Belfast; Lisburn and Castlereagh; Ards and North Down, Newry Mourne and Down and Armagh, Banbridge and Craigavon contract area (Works Orders valued up to £750k). The proposed contract relates to works with a cumulative value of £15.2m (ex VAT) over a four year term. If the Contracting Authority is unable, for any reason, to award a new framework or to put in place an alternative regime to replace this Framework on its termination or expiry, any Call-Off Contract established under this Framework may be extended for a further period or periods up to a maximum of 12 additional months. This may increase the value to £19m (ex VAT).
Contract period: 31 August 2026 → 31 August 2030
ICC Measured Term Contract for structures works within the Antrim and Newtownabbey; Causeway Coast and Glens; Mid and East Antrim contract area (Works Orders valued up to £750k). The proposed contract relates to works with a cumulative value of £14.4m (ex VAT) over a four year term. If the Contracting Authority is unable, for any reason, to award a new framework or to put in place an alternative regime to replace this Framework on its termination or expiry, any Call-Off Contract established under this Framework may be extended for a further period or periods up to a maximum of 12 additional months. This may increase the value to £18m (ex VAT).
Contract period: 31 August 2026 → 31 August 2030
Document pack· 1 file
Published contracts in the last 12 months
57
total contracts
£1627.5m
total value
£73,975,457
average contract size
Typical categories
DfI TRAM Road Asset Management – Road Restraint Systems Framework
DfI Transport and Road Asset Management (TRAM) · WAC-600081
DfI TRAM Road Asset Management – Road Restraint Systems Framework
DfI Transport and Road Asset Management (TRAM) · WAC-595224
DfI TRAM Road Asset Management – Road Restraint Systems Framework
DfI Transport and Road Asset Management (TRAM) · WAC-595236
Pipeline status
Not addedImports the contract into your BidWriter pipeline · Qualify before you commit to bid
Application Deadline
22 June 2026
27 days left
Estimated Value
£57,000,000
Need help writing this bid?
Our specialists write winning tender responses. Free consultation, no obligation.
Book a free consultation →