| Source: | Find a Tender Service (FTS) |
| Notice Type: | Tender notice |
| Buyer: | DfI Transport and Road Asset Management (TRAM) |
| Main Category: | Works |
| Procurement Method: | Open procedure |
| Tender Status: |
| Open |
| Estimated Value (ex. VAT): | £22,000,000 |
| Estimated Value (inc. VAT): | £26,400,000 |
| Release Date: | 12 May 2026 |
| Application Deadline: | 15 June 2026 |
| Enquiry Deadline: | 15 June 2026 |
| Procurement ID (OCID): | ocds-h6vhtk-0696cd |
| Notice Reference: | 043521-2026 |
All 3 notices for this procurement, oldest first.
DfI TRAM Road Asset Management – Road Restraint Systems Framework
DfI TRAM Road Asset Management – Road Restraint Systems Framework
DfI TRAM Road Asset Management – Road Restraint Systems Framework
Ready to bid on this contract?
BidWriter AI writes your tender response in minutes — import this contract in one click.
View Original Notice
Access the full notice on the official portal
| Call-off method: | With mini-competition (call-off via competition) |
This tender notice is for the award of a public contract through an open procedure in accordance with section 20(1) and (2)(a) of the PA 2023. RAM Road Restraint Systems Framework will include the following work activities: A. Road restraint systems installation and/or repair (standalone RRS including maintenance, renewals and new installations); B. Full or partial demolition of structures associated with road restraint systems; C. Earthworks D. Brickwork, blockwork and stonework E. Structural concrete construction and/or repairs associated with road restraint systems; F. Inspection assistance G. Temporary Traffic Management (TTM) on a live trafficked public road network H. Associated ancillary Works Further ancillary works may be asked of the successful Supplier such as. • Surface reinstatement • Site clearance including vegetation removal The Framework will comprise of three area Lots (Work Orders valued up to £750k exc VAT). A Project Lot will be used to deliver individual NEC ECC projects covering all the geographical areas detailed below (valued between £750,001 and £5m exc VAT Area Lots; • RRSF N1 – Causeway Coast & Glens, Mid & East Antrim and Antrim & Newtownabbey; • RRSF E&S1 – Belfast, Lisburn & Castlereagh, Armagh, Banbridge & Craigavon, Newry, Mourne & Down and Ards & North Down; • RRSF W1 – Mid Ulster, Derry & Strabane and Fermanagh & Omagh. This Framework will deliver works from Call-Off contracts with an overall cumulative value of £22m (ex VAT) over the four-year term. If the Contracting Authority is unable, for any reason, to award a new framework or to put in place an alternative regime to replace this Framework on its termination or expiry, any Call-Off Contract established under the Framework may be extended for a further period or periods up to a maximum of 12 additional months. This may increase the overall cumulative value to £27.5m (ex VAT).
Lot for NEC4 Call-Off Contracts awarded following a mini-competition process for Work Packages valued over £750,001 up to £5m covering all Framework contract areas.
ICC Measured Term Contract for structures works within the Antrim and Newtownabbey; Causeway Coast and Glens; Mid and East Antrim contract area (Works Orders valued up to £750k). The proposed contract relates to works with a cumulative value of £6.2m (ex VAT) over a four year term. If the Contracting Authority is unable, for any reason, to award a new framework or to put in place an alternative regime to replace this Framework on its termination or expiry, any Call-Off Contract established under this Framework may be extended for a further period or periods up to a maximum of 12 additional months. This may increase the value to £7.75m (ex VAT).
ICC Measured Term Contract for structures works within the Belfast; Lisburn and Castlereagh; Ards and North Down, Newry Mourne and Down and Armagh, Banbridge and Craigavon contract area (Works Orders valued up to £750k). The proposed contract relates to works with a cumulative value of £6m (ex VAT) over a four year term. If the Contracting Authority is unable, for any reason, to award a new framework or to put in place an alternative regime to replace this Framework on its termination or expiry, any Call-Off Contract established under this Framework may be extended for a further period or periods up to a maximum of 12 additional months. This may increase the value to £7.5m (ex VAT).
Measured Term Contract for Structures works within the Derry and Strabane; Fermanagh & Omagh; Mid-Ulster contract area (Works Orders valued up to £750k). The proposed contract relates to works with a cumulative value of £5.8m (ex VAT) over a four year term. If the Contracting Authority is unable, for any reason, to award a new framework or to put in place an alternative regime to replace this Framework on its termination or expiry, any Call-Off Contract established under this Framework may be extended for a further period or periods up to a maximum of 12 additional months. This may increase the value to £7.25m (ex VAT).
Document pack· 1 file
Published contracts in the last 12 months
57
total contracts
£1627.5m
total value
£73,975,457
average contract size
Typical categories
DfI TRAM Road Asset Management – Road Restraint Systems Framework
DfI Transport and Road Asset Management (TRAM) · WAC-600081
DfI TRAM Road Asset Management – Structures Framework
DfI Transport and Road Asset Management (TRAM) · WAC-600126
DfI TRAM Road Asset Management – Road Restraint Systems Framework
DfI Transport and Road Asset Management (TRAM) · WAC-595224
Pipeline status
Not addedImports the contract into your BidWriter pipeline · Qualify before you commit to bid
Application Deadline
15 June 2026
20 days left
Estimated Value
£22,000,000