Loading page content…
Loading page content…
Loading contract search results…
Loading contract details…
| Source: | Find a Tender Service (FTS) |
| Notice Type: | Award notice |
| Buyer: | University of Salford |
| Main Category: | Works |
| Procurement Method: | Below threshold - open competition |
| Tender Status: | Closed |
| Estimated Value (ex. VAT): | Not specified |
| Release Date: | 21 April 2026 |
| Application Deadline: | — |
| Contract Start Date: | — |
All 2 notices for this procurement, oldest first.
Supply and Installation of addition solar PV panel generation system
Supply and Installation of addition solar PV panel generation system
View Original Notice
Access the full notice on the official portal
🤝 Need a consortium or subcontracting partner?
SMEs & Primes team up to win opportunities like this. Find partners on the board.
Awarded to
| Award value: | £20,116.65 |
| Award decision date: | — |
| Award status: | Active |
The University of Salford seeks proposals to supply and install additional PV generation to one of its buildings. The Northern Engineering Robotics Innovation Centre (NERIC) was constructed in 2022 for the University of Salford, the first building on its new Innovation Campus on Frederick Road, M6 6AP. At the time it was fitted out with 15 kWp onto its higher flat roof. The roof was originally designed to accommodate more panels, but these were reduced in a value engineering exercise. 2.0 Goods and Services to be provided The University seeks to double the amount by adding another 15 kWp bringing the total to 30kWp on the existing higher, gravel ballasted flat roof, easily visible from google satellite, while still maintaining access to service plant and the PV system. We can provide hourly data for 2025 for import, generation and export and would want a model worked up using this data as a basis but on double the existing building consumption (c55,000 kWh/yr to 110,000kWh/yr) as we are expecting this to rise very shortly. Modelling should show generation, import, export, costs saved over 20-year period as a minimum, carbon saved using current grid carbon intensity, payback periods etc including inverter replacement at year 10. Work on a current electricity import price of 28p/kWh and a grid (import) carbon intensity of 177g CO2e/kWh and an export price of 5.6p/kWh Can you please provide us with a proposal and quote to include. • A cost/carbon/payback model based on the above parameters. • A rough breakdown of costs in your quote rather than a single figure. • Provide the data sheets for the proposed panels, non-penetrating fixing system and inverters. • The combined panel/fixing weight as kg/m2 as installed on the roof. • State the panel and inverter warranty. If it doesn't already have it, the inverter should have a minimum 10-year warranty. • The generation meter provided or utilising the existing one will need to be linked to our BMS system. • How and where you intend to lift the panels and fixings onto the roof. • Provide a separate option for battery storage, it's price and impact on export. • You would be expected to carry out all the liaison for approvals with the DNO. • Comply with the University's standard T&Cs for this type of electrical work. • Two references with contact details for similar systems you have installed.
Published contracts in the last 12 months
131
total contracts
£8.1m
total value
£161,862
average contract size
Typical categories
Pipeline status
Not addedImports the contract into your BidWriter pipeline · Qualify before you commit to bid
Need help writing this bid?
Our specialists write winning tender responses. Free consultation, no obligation.
Book a free consultation →| Contract End Date: |
| — |
| Contract Duration: | NaN years |
| Procurement ID (OCID): | ocds-h6vhtk-065665 |
| Notice Reference: | 036061-2026 |