| Source: | Find a Tender Service (FTS) |
| Notice Type: | Tender notice |
| Buyer: | NATIONAL GRID UK LIMITED |
| Main Category: | Works |
| Procurement Method: | Competitive flexible procedure |
| Tender Status: | Open |
Pipeline status
Not addedImports the contract into your BidWriter pipeline · Qualify before you commit to bid
Application Deadline
12 May 2026
Closed
Estimated Value
£40,000,000
Need help writing this bid?
Our specialists write winning tender responses. Free consultation, no obligation.
Book a free consultation →| Estimated Value (ex. VAT): | £40,000,000 |
| Estimated Value (inc. VAT): | £48,000,000 |
| Release Date: | 2 April 2026 |
| Application Deadline: | 12 May 2026 |
| Procurement ID (OCID): | ocds-h6vhtk-067c3b |
| Notice Reference: | 031095-2026 |
Ready to bid on this contract?
BidWriter AI writes your tender response in minutes — import this contract in one click.
View Original Notice
Access the full notice on the official portal
| Call-off method: | Both: direct call-off and mini-competition |
Works under the Framework comprises of civil engineering & building work associated with the construction of new and refurbishment of existing electricity substation sites within NGED's electrical distribution network. Civils works will frequently be carried out in a "live" substation environment. Typically, but not exclusively, covering construction of new substations, construction of new buildings, modification or alteration to existing buildings, foundations, fencing, interceptors, drainage, roads, trenching, general excavation and cable ducts. The scope also extends to general building maintenance associated with roof repairs, redecoration, joinery, guttering, glazing, trench cover replacement, door or gate installation and replacement. It may also entail use of specialist techniques associated with tasks related to environmental protection of electrical substations from extreme weather conditions such as flooding, high winds, high humidity, or any such criteria likely to adversely affect NGED's electrical infrastructure.
This Framework Lot covers the geographical NGED network zones of Redruth, Bodmin. Works under the Framework Lot comprises of civil engineering & building work associated with the construction of new and refurbishment of existing electricity substation sites within NGED's electrical distribution network. Civils works will frequently be carried out in a "live" substation environment. Typically, but not exclusively, covering construction of new substations, construction of new buildings, modification or alteration to existing buildings, foundations, fencing, interceptors, drainage, roads, trenching, general excavation and cable ducts. The scope also extends to general building maintenance associated with roof repairs, redecoration, joinery, guttering, glazing, trench cover replacement, door or gate installation and replacement. It may also entail use of specialist techniques associated with tasks related to environmental protection of electrical substations from extreme weather conditions such as flooding, high winds, high humidity, or any such criteria likely to adversely affect NGED's electrical infrastructure.
This Framework Lot covers the geographical NGED network zones of Plymouth, Torbay, Mid & East Devon, North Devon Works under the Framework Lot comprises of civil engineering & building work associated with the construction of new and refurbishment of existing electricity substation sites within NGED's electrical distribution network. Civils works will frequently be carried out in a "live" substation environment. Typically, but not exclusively, covering construction of new substations, construction of new buildings, modification or alteration to existing buildings, foundations, fencing, interceptors, drainage, roads, trenching, general excavation and cable ducts. The scope also extends to general building maintenance associated with roof repairs, redecoration, joinery, guttering, glazing, trench cover replacement, door or gate installation and replacement. It may also entail use of specialist techniques associated with tasks related to environmental protection of electrical substations from extreme weather conditions such as flooding, high winds, high humidity, or any such criteria likely to adversely affect NGED's electrical infrastructure.
This Framework Lot covers the geographical NGED network zones of Somerset, Mendip Western, Mendip Bath and Bristol. Works under the Framework Lot comprises of civil engineering & building work associated with the construction of new and refurbishment of existing electricity substation sites within NGED's electrical distribution network. Civils works will frequently be carried out in a "live" substation environment. Typically, but not exclusively, covering construction of new substations, construction of new buildings, modification or alteration to existing buildings, foundations, fencing, interceptors, drainage, roads, trenching, general excavation and cable ducts. The scope also extends to general building maintenance associated with roof repairs, redecoration, joinery, guttering, glazing, trench cover replacement, door or gate installation and replacement. It may also entail use of specialist techniques associated with tasks related to environmental protection of electrical substations from extreme weather conditions such as flooding, high winds, high humidity, or any such criteria likely to adversely affect NGED's electrical infrastructure.
This Framework Lot covers the geographical NGED network zones of East Wales, West Wales, Swansea Area, Cardiff Area. Works under the Framework Lot comprises of civil engineering & building work associated with the construction of new and refurbishment of existing electricity substation sites within NGED's electrical distribution network. Civils works will frequently be carried out in a "live" substation environment. Typically, but not exclusively, covering construction of new substations, construction of new buildings, modification or alteration to existing buildings, foundations, fencing, interceptors, drainage, roads, trenching, general excavation and cable ducts. The scope also extends to general building maintenance associated with roof repairs, redecoration, joinery, guttering, glazing, trench cover replacement, door or gate installation and replacement. It may also entail use of specialist techniques associated with tasks related to environmental protection of electrical substations from extreme weather conditions such as flooding, high winds, high humidity, or any such criteria likely to adversely affect NGED's electrical infrastructure.
This Framework Lot covers the geographical NGED network zones of Gloucester, Hereford & Ludlow, Worcester. Works under the Framework Lot comprises of civil engineering & building work associated with the construction of new and refurbishment of existing electricity substation sites within NGED's electrical distribution network. Civils works will frequently be carried out in a "live" substation environment. Typically, but not exclusively, covering construction of new substations, construction of new buildings, modification or alteration to existing buildings, foundations, fencing, interceptors, drainage, roads, trenching, general excavation and cable ducts. The scope also extends to general building maintenance associated with roof repairs, redecoration, joinery, guttering, glazing, trench cover replacement, door or gate installation and replacement. It may also entail use of specialist techniques associated with tasks related to environmental protection of electrical substations from extreme weather conditions such as flooding, high winds, high humidity, or any such criteria likely to adversely affect NGED's electrical infrastructure.
This Framework Lot covers the geographical NGED network zones of Birmingham, Tipton. Works under the Framework Lot comprises of civil engineering & building work associated with the construction of new and refurbishment of existing electricity substation sites within NGED's electrical distribution network. Civils works will frequently be carried out in a "live" substation environment. Typically, but not exclusively, covering construction of new substations, construction of new buildings, modification or alteration to existing buildings, foundations, fencing, interceptors, drainage, roads, trenching, general excavation and cable ducts. The scope also extends to general building maintenance associated with roof repairs, redecoration, joinery, guttering, glazing, trench cover replacement, door or gate installation and replacement. It may also entail use of specialist techniques associated with tasks related to environmental protection of electrical substations from extreme weather conditions such as flooding, high winds, high humidity, or any such criteria likely to adversely affect NGED's electrical infrastructure.
This Framework Lot covers the geographical NGED network zones of Telford, Stoke. Works under the Framework Lot comprises of civil engineering & building work associated with the construction of new and refurbishment of existing electricity substation sites within NGED's electrical distribution network. Civils works will frequently be carried out in a "live" substation environment. Typically, but not exclusively, covering construction of new substations, construction of new buildings, modification or alteration to existing buildings, foundations, fencing, interceptors, drainage, roads, trenching, general excavation and cable ducts. The scope also extends to general building maintenance associated with roof repairs, redecoration, joinery, guttering, glazing, trench cover replacement, door or gate installation and replacement. It may also entail use of specialist techniques associated with tasks related to environmental protection of electrical substations from extreme weather conditions such as flooding, high winds, high humidity, or any such criteria likely to adversely affect NGED's electrical infrastructure.
This Framework Lot covers the geographical NGED network zones of Derby, Chesterfield & Mansfield, Nottingham. Works under the Framework Lot comprises of civil engineering & building work associated with the construction of new and refurbishment of existing electricity substation sites within NGED's electrical distribution network. Civils works will frequently be carried out in a "live" substation environment. Typically, but not exclusively, covering construction of new substations, construction of new buildings, modification or alteration to existing buildings, foundations, fencing, interceptors, drainage, roads, trenching, general excavation and cable ducts. The scope also extends to general building maintenance associated with roof repairs, redecoration, joinery, guttering, glazing, trench cover replacement, door or gate installation and replacement. It may also entail use of specialist techniques associated with tasks related to environmental protection of electrical substations from extreme weather conditions such as flooding, high winds, high humidity, or any such criteria likely to adversely affect NGED's electrical infrastructure.
This Framework Lot covers the geographical NGED network zones of Coventry & Warwickshire, Northants & Milton Keynes, Leicester & Kettering. Works under the Framework Lot comprises of civil engineering & building work associated with the construction of new and refurbishment of existing electricity substation sites within NGED's electrical distribution network. Civils works will frequently be carried out in a "live" substation environment. Typically, but not exclusively, covering construction of new substations, construction of new buildings, modification or alteration to existing buildings, foundations, fencing, interceptors, drainage, roads, trenching, general excavation and cable ducts. The scope also extends to general building maintenance associated with roof repairs, redecoration, joinery, guttering, glazing, trench cover replacement, door or gate installation and replacement. It may also entail use of specialist techniques associated with tasks related to environmental protection of electrical substations from extreme weather conditions such as flooding, high winds, high humidity, or any such criteria likely to adversely affect NGED's electrical infrastructure.
This Framework Lot covers the geographical NGED network zones of South Lincolnshire, North Lincolnshire. Works under the Framework Lot comprises of civil engineering & building work associated with the construction of new and refurbishment of existing electricity substation sites within NGED's electrical distribution network. Civils works will frequently be carried out in a "live" substation environment. Typically, but not exclusively, covering construction of new substations, construction of new buildings, modification or alteration to existing buildings, foundations, fencing, interceptors, drainage, roads, trenching, general excavation and cable ducts. The scope also extends to general building maintenance associated with roof repairs, redecoration, joinery, guttering, glazing, trench cover replacement, door or gate installation and replacement. It may also entail use of specialist techniques associated with tasks related to environmental protection of electrical substations from extreme weather conditions such as flooding, high winds, high humidity, or any such criteria likely to adversely affect NGED's electrical infrastructure.
Published contracts in the last 12 months
25
total contracts
£960.2m
total value
£106,691,111
average contract size