Loading page content…
Loading page content…
Loading contract search results…
Loading contract details…
| Source: | Find a Tender Service (FTS) |
| Notice Type: | Award update |
| Buyer: | Northumbria Healthcare Facilities Management |
| Main Category: | Goods |
| Procurement Method: | — |
| Tender Status: | Unknown |
| Estimated Value (ex. VAT): | Not specified |
| Release Date: | 27 March 2026 |
| Application Deadline: | — |
| Procurement ID (OCID): | ocds-h6vhtk-067149 |
All 3 notices for this procurement, oldest first.
Laboratory Information Management System (LIMS)
Laboratory Information System
Laboratory Information Management System (LIMS)
View Original Notice
Access the full notice on the official portal
🤝 Need a consortium or subcontracting partner?
SMEs & Primes team up to win opportunities like this. Find partners on the board.
Awarded to
| Award status: | Active |
| Period rationale: | This Contract Variation of the scope of the original contract to extend the service to cover North Cumbria NHS ICB. It is a permitted Modification Regulation 72(1)(c) of the Public Contract regulations 2015. The extension of the scope is operationally required for cost efficiency and optimum interoperability and the modification satifies all of the following criteria:<br/><br/>(i)the need for modification has been brought about by circumstances which a diligent contracting authority could not have foreseen;<br/><br/>(ii)the modification does not alter the overall nature of the contract;<br/><br/>(iii)the increase in price does not exceed 50% of the value of the original contract or framework agreement. |
This Contract Variation of the scope of the original contract to extend the service to cover North Cumbria NHS ICB. It is a permitted Modification Regulation 72(1)(c) of the Public Contract regulations 2015. The extension of the scope is operationally required for cost efficiency and optimum interoperability and the modification satifies all of the following criteria:<br/><br/>(i)the need for modification has been brought about by circumstances which a diligent contracting authority could not have foreseen;<br/><br/>(ii)the modification does not alter the overall nature of the contract;<br/><br/>(iii)the increase in price does not exceed 50% of the value of the original contract or framework agreement.
Published contracts in the last 12 months
84
total contracts
£79.5m
total value
£3,312,135
average contract size
Typical categories
Mist Suppression and Ward Refresh Works - Phases 2 - 5 - Stage 1 Participation
Northumbria Healthcare Facilities Management · WAC-601999
Mist Suppression and Ward Refresh Works - Phases 2 - 5
Northumbria Healthcare Facilities Management · WAC-595987
Patient Entertainmeet Solution
Northumbria Healthcare Facilities Management · WAC-595467
Pipeline status
Not addedImports the contract into your BidWriter pipeline · Qualify before you commit to bid
Need help writing this bid?
Our specialists write winning tender responses. Free consultation, no obligation.
Book a free consultation →| Notice Reference: |
| 028744-2026 |