Loading page content…
Loading page content…
Loading contract search results…
Loading contract details…
| Source: | Find a Tender Service (FTS) |
| Notice Type: | Tender notice |
| Buyer: | Forestry Commission |
| Main Category: | Services |
| Procurement Method: | Open procedure |
| Tender Status: | Closed |
| Estimated Value (ex. VAT): |
Pipeline status
Not addedImports the contract into your BidWriter pipeline · Qualify before you commit to bid
Application Deadline
10 February 2026
Closed
Estimated Value
£760,000
Need help writing this bid?
Our specialists write winning tender responses. Free consultation, no obligation.
Book a free consultation →| £760,000 |
| Estimated Value (inc. VAT): | £912,000 |
| Release Date: | 16 January 2026 |
| Application Deadline: | 10 February 2026 |
| Enquiry Deadline: | 29 January 2026 |
| Procurement ID (OCID): | ocds-h6vhtk-060752 |
| Notice Reference: | 003757-2026 |
All 3 notices for this procurement, oldest first.
Ground Preparation - West District
Ground Preparation - West District
Ground Preparation - West District
View Original Notice
Access the full notice on the official portal
| Call-off method: | Direct call-off (no competition) |
| Maximum operators: | 2 |
We will be awarding a framework agreement for the following across 7 lots in the West District: - Preparing forestry restock sites for planting involving the management of brash and harvesting residues. - Installation and maintenance of forest drains including installation of new culvert pipes on extraction routes or tracks - The reinstatement of severely rutted tracks and footpaths following trafficking by heavy machinery (excluding surfaced tracks and trails) - Clearing of blocked culverts and roadside ditches - Mulching of invasive species and scrub using a mulching head fitted to a tracked excavator
All lots have the same requirement and differ only on size and location. The requirement is as follows for the Wyre, Mortimer and Shropshire Beats: Preparing forestry restock sites for planting involving the management of brash and harvesting residues. Installation and maintenance of forest drains including installation of new culvert pipes on extraction routes or tracks The reinstatement of severely rutted tracks and footpaths following trafficking by heavy machinery (excluding surfaced tracks and trails) Clearing of blocked culverts and roadside ditches Mulching of invasive species and scrub using a mulching head fitted to a tracked excavator Unless otherwise agreed by the Commission in the Call off, all materials, goods, fuels, and consumables, are procured, ordered, delivered, stored, managed and paid for by the Supplier.
Contract period: — → 12 March 2030
All lots have the same requirement and differ only on size and location. The requirement is as follows for the East and West Dean Beats: Preparing forestry restock sites for planting involving the management of brash and harvesting residues. Installation and maintenance of forest drains including installation of new culvert pipes on extraction routes or tracks The reinstatement of severely rutted tracks and footpaths following trafficking by heavy machinery (excluding surfaced tracks and trails) Clearing of blocked culverts and roadside ditches Mulching of invasive species and scrub using a mulching head fitted to a tracked excavator Unless otherwise agreed by the Commission in the Call off, all materials, goods, fuels, and consumables, are procured, ordered, delivered, stored, managed and paid for by the Supplier.
Contract period: — → 12 March 2030
All lots have the same requirement and differ only on size and location. The requirement is as follows for the Bristol and Mendips Beat: Preparing forestry restock sites for planting involving the management of brash and harvesting residues. Installation and maintenance of forest drains including installation of new culvert pipes on extraction routes or tracks The reinstatement of severely rutted tracks and footpaths following trafficking by heavy machinery (excluding surfaced tracks and trails) Clearing of blocked culverts and roadside ditches Mulching of invasive species and scrub using a mulching head fitted to a tracked excavator Unless otherwise agreed by the Commission in the Call off, all materials, goods, fuels, and consumables, are procured, ordered, delivered, stored, managed and paid for by the Supplier.
Contract period: — → 12 March 2030
All lots have the same requirement and differ only on size and location. The requirement is as follows for the Savernake, Collingbourne and Wooten Basset Area of the Bristol Beat: Preparing forestry restock sites for planting involving the management of brash and harvesting residues. Installation and maintenance of forest drains including installation of new culvert pipes on extraction routes or tracks The reinstatement of severely rutted tracks and footpaths following trafficking by heavy machinery (excluding surfaced tracks and trails) Clearing of blocked culverts and roadside ditches Mulching of invasive species and scrub using a mulching head fitted to a tracked excavator Unless otherwise agreed by the Commission in the Call off, all materials, goods, fuels, and consumables, are procured, ordered, delivered, stored, managed and paid for by the Supplier.
Contract period: — → 12 March 2030
All lots have the same requirement and differ only on size and location. The requirement is as follows for the Somerset and East Devon Beats: Preparing forestry restock sites for planting involving the management of brash and harvesting residues. Installation and maintenance of forest drains including installation of new culvert pipes on extraction routes or tracks The reinstatement of severely rutted tracks and footpaths following trafficking by heavy machinery (excluding surfaced tracks and trails) Clearing of blocked culverts and roadside ditches Mulching of invasive species and scrub using a mulching head fitted to a tracked excavator Unless otherwise agreed by the Commission in the Call off, all materials, goods, fuels, and consumables, are procured, ordered, delivered, stored, managed and paid for by the Supplier.
Contract period: — → 12 March 2030
All lots have the same requirement and differ only on size and location. The requirement is as follows for the Dartmoor, Mid and North Devon Beats: Preparing forestry restock sites for planting involving the management of brash and harvesting residues. Installation and maintenance of forest drains including installation of new culvert pipes on extraction routes or tracks The reinstatement of severely rutted tracks and footpaths following trafficking by heavy machinery (excluding surfaced tracks and trails) Clearing of blocked culverts and roadside ditches Mulching of invasive species and scrub using a mulching head fitted to a tracked excavator Unless otherwise agreed by the Commission in the Call off, all materials, goods, fuels, and consumables, are procured, ordered, delivered, stored, managed and paid for by the Supplier.
Contract period: — → 12 March 2030
All lots have the same requirement and differ only on size and location. The requirement is as follows for the Cornwall Beat: Preparing forestry restock sites for planting involving the management of brash and harvesting residues. Installation and maintenance of forest drains including installation of new culvert pipes on extraction routes or tracks The reinstatement of severely rutted tracks and footpaths following trafficking by heavy machinery (excluding surfaced tracks and trails) Clearing of blocked culverts and roadside ditches Mulching of invasive species and scrub using a mulching head fitted to a tracked excavator Unless otherwise agreed by the Commission in the Call off, all materials, goods, fuels, and consumables, are procured, ordered, delivered, stored, managed and paid for by the Supplier.
Contract period: — → 12 March 2030
Document pack· 1 file
Published contracts in the last 12 months
184
total contracts
£106.3m
total value
£1,455,839
average contract size
Typical categories