Loading page content…
Loading page content…
| Source: | Find a Tender Service (FTS) |
| Buyer: | London Underground Limited |
| Main Category: | Services |
| Procurement Method: | — |
| Tender Status: | Planned |
| Estimated Value (ex. VAT): | Not specified |
| Release Date: | 24 October 2025 |
| Application Deadline: | 29 June 2026 |
| Contract Start Date: | 1 August 2027 (Estimated) |
| Contract End Date: | 1 August 2031 (Estimated) |
| Contract Duration: | 4.1 years |
| Procurement ID (OCID): | ocds-h6vhtk-05d3c0 |
| Notice Reference: | 068366-2025 |
Ready to bid on this contract?
BidWriter AI writes your tender response in minutes — import this contract in one click.
View Original Notice
Access the full notice on the official portal
Given the age of Jubilee line 96TS (1996 Train Stock), several systems are now experiencing obsolescence which impact the fleet's maintainability and day-to-day availability. The aspiration is for the fleet to operate, with an acceptable level of Reliability, Availability, Maintainability and Safety (RAMS), until replacement in approximately 2045. To address these obsolescence issues, London Underground (LU) have mobilised a project to develop and implement a sustainable solution. A 'Make vs. Buy' analysis is required to establish the optimal means of project delivery. To date, project development has assumed and have been engaging the market, on a 'Make' scenario for the individual systems, whereby LU procures replacement systems from 3rd parties and deliver their integration across the fleet at an in-house production facility. This Market Engagement Exercise however, seeks to assess market appetite and capability to deliver the 'Buy' scenario, where a supplier is contracted to deliver a 'Turnkey' programme of works to address all the systems of concern as provided in the scope below - which itemises the Core / Extended scope systems and their respective Preferred solution. The Preferred solutions were determined as part of an LU completed optioneering work. CORE SCOPE 1: Train Management System (TMS), including Incident Recorder (IR) - Replacement 2: Passenger Information System (PIS) - Replacement 3: Saloon CCTV - Replacement EXTENDED SCOPE 4: Propulsion Inverter Electronics (PIE) - Replacement 5: Saloon & Cab Fluorescent Lighting - Replacement 6: Traction Brake Controller - Obsolescence Treatment (Repair) 7: HVAC (cab and saloon) Controllers - Obsolescence Treatment (Repair) 8: De- Icer Controller - Obsolescence Treatment (Repair) This 'Buy' option assumedly, will require the supplier to complete all aspects of the design, prototyping, manufacture, installation and testing & commissioning of the replacement systems across the fleet (in full) at their facility. Such option could be preferable to LU if the approach, costs and delivery timelines proposed by the suppliers present better value in comparison to the "Make" option and current internal estimates. The outcome of the Early Market Engagement will output the preferred modality for project delivery, to be progressed to tender with the intention of implementing it on all of LU's 63 Jubilee Line fleet of trains.
Published contracts in the last 12 months
46
total contracts
£48.5m
total value
£3,231,517
average contract size
Typical categories
09TS Victoria Line Supply of Vertical and Lateral Dampers
London Underground Limited · WAC-578001
Wheel Slide Protection (WSP) Box replacement for Central line
London Underground Limited · WAC-574692
Track to Train CCTV System Partial Replacement for Jubilee Line Fleet (96TS)
London Underground Limited · WAC-567470
Pipeline status
Not addedContract imported automatically · AI writes the response
Application Deadline
29 June 2026
75 days left
Need help writing this bid?
Our specialists write winning tender responses. Free consultation, no obligation.
Book a free consultation →