Loading page content…
Loading page content…
Loading contract search results…
Loading contract details…
| Source: | Find a Tender Service (FTS) |
| Notice Type: | Pipeline / planning |
| Buyer: | AFFINITY WATER LIMITED |
| Main Category: | Works |
| Procurement Method: | — |
| Tender Status: | Pre-tender |
| Estimated Value (ex. VAT): | £900,000,000 |
| Release Date: | 5 October 2023 |
| Application Deadline: | — |
| Procurement ID (OCID): | ocds-h6vhtk-040868 |
| Notice Reference: | 029460-2023 |
Ready to bid on this contract?
BidWriter AI writes your tender response in minutes — import this contract in one click.
Affinity Water is preparing to go to tender to have a supply chain to deliver the AMP8 and 9 capital works. The AMP8 and 9 regulatory period will run from April 2025 to March 2035. The estimated total value of AMP8 is £450,000,000 and a similar amount for AMP9. The let agreements will run alongside other existing agreements (that will be used to deliver the AMP8 and 9 programmes) which are outside the scope of works and services included in this PIN. Examples include the Smart Metering Programme.
Infra (BGA) capital works include activities such as: • Distribution mains renewals • Trunk main renewals • Network reinforcements • Under pressure connections/line stops • Water mains commissioning • Street works • Developer services activities - including new connections and water mains diversions • Network modelling and network data management • Network calming • MEICA for distribution assets • Retrofitting of advanced pressure management solutions. Additional information: A preliminary market consultation event is planned to take place on 17/10/2023. See VI.3 below.
Non-infra (AGA) capital works include activities such as: • Design, build and commissioning of water treatment processes - including civils, Mechanical, Electrical, Instrumentation, Control and Automation (MEICA) and process design. • Design, build and commissioning of booster pumping stations, design, build and commissioning of service reservoirs - including of similar structures such as clean water tanks. • Integration of assets - including automation/control of the strategic network. Additional information: A preliminary market consultation event is planned to take place on 17/10/2023. See VI.3 below.
Published contracts in the last 12 months
11
total contracts
£854.0m
total value
£170,806,800
average contract size
Typical categories
Pipeline status
Not addedImports the contract into your BidWriter pipeline · Qualify before you commit to bid
Estimated Value
£900,000,000
Need help writing this bid?
Our specialists write winning tender responses. Free consultation, no obligation.
Book a free consultation →