Loading page content…
Loading page content…
3 matching contracts · Updated daily · Contracts Finder + Find a Tender Service
THIS NOTICE IS A CALL FOR COMPETITION The Xlinks UK-Morocco Power Project (the Project) is a multi-technology renewable energy project of approximately 11GW of Moroccan generation facilities connected exclusively to the UK through an HVDC system, including approximately 4000km of onshore and offshore HVDC cables. To support the development of the Project through to the final investment decision and then onwards into the construction and operations phases, Xlinks First Limited (Xlinks) is seeking the support of a Client- side Project Management Contractor (PMC). The PMC will work in conjunction with Xlinks and Xlinks’ client team, including the Owner’s Engineer. The PMC’s primary role will be project and commercial management of the Engineering, Procurement and Construction (EPC) and other contracts that Xlinks is currently procuring for the construction phase of the Project. The Owner’s Engineer’s prime role will be technical and quality assurance of the works under the EPC contracts. Xlinks is seeking organisations focused on solving complex engineering and construction delivery challenges to ensure the successful achievement of financial close and delivery of the Project through construction into operations. To commence the procurement process, Xlinks will be hosting an online webinar to describe the process in further detail. Access to the Pre-Qualification Questionnaire (PQQ) and an invitation to the webinar will be provided once the appropriate Non-Disclosure Agreement (NDA) has been signed and returned.
Value undisclosed
The Xlinks Morocco-UK Power Project is being developed by Xlinks First as the principal developer. The Xlinks Morocco-UK Power Project is a multi-technology renewable energy project of circa 11 GW generated in Morocco with a combination of solar, wind and in-land power transmission, coupled with energy storage. The electricity produced by the Moroccan generation facilities will be transported exclusively to Great Britain through dedicated 4,000 km HVDC onshore and offshore transmission infrastructure delivering 3.6GW, which will serve up to 8% of Great Britain’s electricity needs. The HVDC system is comprised of two separate bi-poles, providing two separate connections in the UK. The Project comprises four key elements: Generation: covering all the generation assets (wind, solar, BESS) with their related civil and electrical works up to the HVDC converters in Morocco. HVDC Converter Stations: in Morocco and the UK. HVDC Onshore Transmission: covering onshore transmission in Morocco (underground cables and overhead line) and in the UK (underground cable) HVDC Offshore Transmission: submarine HVDC cable between the Moroccan and UK landing points Xlinks First is in the process of finalising the contracting strategy for the Project. This Prior Information Notice relates to the HVDC converter stations. Potential suppliers are being invited to respond to a Request for Information, including an expression of interest for some or all of the Scope of Works for the HVDC Converter Stations. These companies are requested to register in Delta eSourcing (via the link provided above) to access further information. The HVDC system comprises two electrically separated bipoles, each with a 1.8GW connection to the UK grid. The entire Converter Station Scope of Works will encompass: For Bipole 1: 2 Converter stations. 1 x circa 2200MW in Morocco and 1 x 1800MW in UK and all works associated with the HVDC Converter Stations for one bipole, including foundation and structural works; HVAC cable in UK for one bipole and Grid Connection in UK for one bipole; HVAC cable in Morocco for one bipole. For Bipole 2: 2 Converter stations. 1 x circa 2200MW in Morocco and 1 x 1800MW in UK and all works associated with the HVDC Converter Stations for one bipole, including foundation and structural works; HVAC cable in UK for one bipole and Grid Connection in UK for one bipole; HVAC cable in Morocco for one bipole. Please note that a similar RFI is underway for the HVDC transmission infrastructure scope of works for the Project (including onshore and offshore HVDC cables, onshore overhead line and associated works). Once Xlinks First has received responses from participants, Xlinks First may initiate further discussions with potential suppliers before finalising its procurement strategy. Once the procurement strategy is confirmed, Xlinks First will proceed to launch the procurement events.
Value undisclosed
The Xlinks Morocco-UK Power Project is being developed by Xlinks First as the principal developer. The Xlinks Morocco-UK Power Project is a multi-technology renewable energy project of circa 11 GW generated in Morocco with a combination of solar, wind and in-land power transmission, coupled with energy storage. The electricity produced by the Moroccan generation facilities will be transported exclusively to Great Britain through dedicated 4,000 km HVDC onshore and offshore transmission infrastructure delivering 3.6GW, which will serve up to 8% of Great Britain’s electricity needs. The HVDC system is comprised of two separate bi-poles, providing two separate connections in the UK. The Project comprises four key elements: 1-Generation: covering all the generation assets (wind, solar, BESS) with their related civil and electrical works up to the HVDC converters in Morocco. 2-HVDC Converter Stations: in Morocco and the UK. 3-HVDC Onshore Transmission: covering onshore transmission in Morocco (underground cables and overhead line) and in the UK (underground cable). 4-HVDC Offshore Transmission: submarine HVDC cable between the Moroccan and UK landing points. Xlinks First is in the process of finalising the contracting strategy for the Project. This Prior Information Notice relates to the HVDC onshore and offshore transmission. Potential suppliers for HVDC cable, HVDC overhead lines and related works are being invited to respond to a Request for Information, including an expression of interest for some or all of the Scope of Works for the transmission infrastructure. These companies are requested to register in Delta eSourcing (via the link provided above) to access further information. The HVDC system comprises two electrically separated bipoles, each with a 1.8GW connection to the UK grid. The entire onshore and offshore transmission Scope of Works will encompass: A-Four offshore HVDC cables, each 3,800km long, will form the twin 1.8GW HVDC subsea cable systems that will follow the shallow water route from the Moroccan site to a grid location in Great Britain, passing through water of Spain, Portugal, and France waters. / B-Four onshore HVDC underground cables, each 15km long, will connect the HVDC subsea cable system to the twin 1.8GW HVDC Converters station in UK./ C-Two or four onshore HVDC cables. An optional HVDC overhead line could replace two of the onshore HVDC cables, each approximately 150km long, will connect the 2 bi-pole HVDC Converters station in Morocco to the offshore HVDC Cable system./ Please note that a similar RFI is underway for the HVDC Converter Stations scope of works for Project. Once Xlinks First has received responses from participants, Xlinks First may initiate further discussions with potential suppliers before finalising its procurement strategy. Once the procurement strategy is confirmed, Xlinks First will proceed to launch the procurement events.
Value undisclosed