Loading page content…
Loading page content…
Loading contract search results…
2 matching procurements · Click a result to see its full lifecycle · Updated daily · Contracts Finder + Find a Tender Service
To renovate Fletcher's Lea to agreed specifications including new toilet design, improvement of the bar, foyer and main room areas. Fletcher's Lea is a multipurpose space that serves high end guests attending weddings, celebrations and conferences but also provides a setting for a variety of events for the community of Ware. The aspiration is to improve the current facilities so that it is desirable to all clientele whilst being functional and efficient for every use. In general access to Fletcher's Lea will be Monday to Friday from 8am until 8pm. If work is required to be undertaken over the weekend, this can be arranged with the Sales and Operations Manager. Ware Priory is operational with commercial and charity events at various times. Coordination with the Sales and Operations Manager will be required as it may be necessary that no work is carried out should it be deemed to cause disruption to private events on the Priory estate. Detailed Specification of Fletcher's Lea Internal Refurbishment Project Toilets • Update to modern specification on a like for like basis • Possibility of reducing ladies stalls from 4 to 3.... • Replace the current stalls and white goods in line with the toilets in the main Ware Priory building • Replace the appointments (soap dispensers, dryers etc) as per above. Essential Sustainability Work • The addition of hot water distribution taps in toilets, kitchen and bar to reduce all taps to 5.7 litres/minute. This will reduce HW demand and ASHP size plus meet ESG directives. • The installation of a Hot Water Cylinder Heat Pump. Switch the direct electric hot water system to a hot water cylinder heat pump such as the Dimplex EDL or Daikin Altherma with SCOP min 2.7. This then provides renewable hot water. Short ductwork needed to external wall/roof. Main Room • To submit a design for a multi-purpose facility including items below • Wall Spaces - add mirror in large space on the right hand side as you enter the room • Provide choice of vinyl rendering for the storage / door panelling to match the bar area • Replacement of curtains with black out curtains or blinds to suit the design element. Reception • Repaint or stylish vinyl covering or bar panelling - to match with main room storage doors (see above) • Area Between Bar Corridor and Foyer • Replace shelf with something more durable • Box in area below • Splash backs for area above • Clean up sink Kitchen • Removal of excess equipment including safe and current storage units • To be replaced with closed in cupboard storage • Wall space needs redecorating and plastic cornering added to protect from scuffing • Replacement of gas hob for electric one. Bar • New design and some functional improvements including:- • Mirrored back walls • Silver / chrome shelving above fridges • Re-decorate flooring and lower wall area by the glass washer and sinks.
From £40,000
Contract value
We have previously appointed a consultant to design this specification. Please find the report attached. Overview: Install Gas Fired Water Heaters The existing direct cylinders should be replaced with gas fired condensing water heaters in the same locations as the existing cylinders. The heaters would be approximately 700mm in diameter and around 1900mm high (60KW) or 1400mm high (32KW) For the male, female and outside shower area, 2No gas fired waters heater rated at 32KW with a storage volume of 200 litres Install a smaller 32KW model in the family changing room which would be more than sufficient and could accommodate additional showers should there be an opportunity to install these infuture. The flues for the water heaters which are around 150mm diameter would be installed through the flat roof. A new gas supply pipe could be installed from the boiler room, across the flat roof to serve the heaters. Each gas supply should be fitted with a gas safety panel which would shut off the gas supply in the event of gas leaks or fire. Replace Existing Pipework The cold water supply pipework from the plant room would need to be replaced along with the outlet pipework to include a secondary circulating system with associated pump, and all pipework insulated where possible. This will reduce energy consumption and avoid excessive dead legs in the hot water system that are currently present. Replace Existing Showers (3 in Family changing, 2 in Male Changing, 2 in Female changing. It is recommended that the existing showers, which are in poor condition be replaced with tamper proof shower panels. These will provide timed flow control via push button and automatic flow regulation along with individual thermostatic blending which will minimise any dead legs on the system. The 4 outside showers need to be converted to a hot water supply as they are currently cold water only. Access to the site will be 8am-5pm Monday-Friday as standard. Hours outside of this can potentially be arranged with the Operations Manager. The building will be unoccupied during the planned refurbishment phase. There is parking on site for site vehicles. The council will require reporting as required and in particular any impact on the project timescale, plus anything that may cause reputational damage to the council. Please specify in the pricing schedule the requirement for any phased payments. WTC seek to pay all correct invoices within 30days.
Value undisclosed