Loading page content…
Loading page content…
6 matching contracts · Updated daily · Contracts Finder + Find a Tender Service
The complete replacement of The Windsor Boys School D Block Roof. The roof has been split into 3 sections. The dimensions of the roofs are: Roof 1 - 800m2 Scope of works: • Strip existing tiles, felt & batten, renew with premium treated BS5534 - compliant batten and install new high-quality breathable membrane. • Renew tiles with Redland Concrete Regent tiles. • Renew ridge tiles with Redland Concrete half-round ridge tiles and dry ridge kit. • Install new eaves trays, fascia vents and comb fillers. • Clear all waste and debris from site. • Scaffolding Roof 2 - 920m2 Scope of works: • Strip existing tiles, felt & batten, Renew with premium treated BS5534- compliant batten and install new high-quality breathable membrane. • Renew tiles with Redland Concrete Regent tiles. • Renew ridge/hip tiles with Redland Concrete half-round ridge/hip tiles and dry ridge kit. • Remove existing verge & install new dry verge unit with end caps. • Remove existing valley & install new dry valley trough. • Install new eaves trays, fascia vents & comb fillers. • Replace all lead flashing as required. • Clear all waste & debris from site. • Scaffolding • Remove existing Velux rooflights and install 8no PK08 & 3no FPK08 Velux units with associated flashings. Roof 3 - 520m2 Scope of works: • Strip existing tiles, felt & batten, Renew with Premium treated BS5534- compliant batten and install new high-quality breathable membrane. • Renew tiles with Redland Concrete Regent tiles. • Renew ridge/hip tiles with Redland Concrete half round ridge/hip tiles and dry ridge kit. • Remove existing verge & install new dry verge unit with end caps, • Install new eaves trays, fascia vents & comb fillers. • Clear all waste and debris from site. • Scaffolding All works must be guaranteed for 30 years
£400,000
Contract value
Project Outline Upgrading the existing water services to comply with all legislation and omit present legionella issues. Remove the inaccessible cold water storage takes. Put the cold-water feeds on mains supply. Renew the ceiling, lights and flooring after gaining access to remove the old tanks The existing water service installations related to the original parts of the Victorian school building are in poor condition, they are life expired. There are issues with Legionella compliance which cannot be readily resolved due to the health and safety implications with both inspecting, maintaining and servicing the water storages installations as demonstrates in photos below. The Main Cold-Water services require replacing as the existing water services installations and cold-water storage provisions provided are life expired and do not meet current compliance and regulations in respect to Legionella control and management.
£130,000
Contract value
Toilet Refurbishment Project: Strip Out To set up site with floor protection to walk ways and provide skip. Make safe all Electrical and Plumbing connections. Carefully Decommission, Strip out and Remove the following items to the skip on site: 4x WC Pans, 2x Urinals, 5x Basins, 4x Cubicles, 1x Drinking Fountain, 28sqm Vinyl Flooring, 28sqm Solid Ceiling, 8x Lights, 2x Sockets, 6sqm 100 mm Brick Wall, 1x Door only, 1x Door and Door frames, 3x Radiators, 2x Hand Dryers, 1x Carefully remove for relocation water heater, 1 x extraction vents/fans, 7sqmwall tiles, 1 x install lintel to create new opening. Flooring Floor Finishes supplied and installed as follows: 28sqm Vinyl Flooring including primer and latex self levelling compound, 35lm Vinyl upstands (Cap and Cove), 2sqm Make good flooring, 1x Install new connection into manhole for new toilet waste run. Wall finishes Wall Finishes supplied and installed as follows: 1sqm New Stud Wall to be Built (unfinished) double sided, 58sqm Prepare Walls for Cladding, 58sqm White Hygienic Wall Cladding (with trims) - Full height Carpentry Carpentry works supplied and installed as follows: 1x FD 30 Ply door inc Ironmongery, 10lmNew Timber Boxing, 9lm MDF Skirting Ceilings Ceiling works supplied and installed as follows: 28sqm Suspended ceiling with smooth plasterboard tiles Extraction Extraction fan and fittings as follows: 1x Window fan and shutters Decoration 22sqm Prepare Walls for Decoration, 22sqm Paint Walls with Washable Bathroom Emulsion, 3x Paint Door and Frame (one side), 1x Paint Skylight, 9lm Paint Timberwork Electrical & Lighting works Electrical & Lighting Works supplied and installed as follows: 10x 600 x 600 LED Grid Light, 2x Lighting PIR Sensor, 2x Emergency Down Light, 3x Turboforce Junior Plus Hand Dryer, 1x Water heater wiring, 1x Surface Mounted Power Supply for Hand Dryer, 1x Cable, Accessories and Electrical Certificate, Plumbing Works Plumbing Works supplied and installed as follows: 8x Standard BTW 400mm high pan inc Seat & Cistern with Button, 7x Inta Push Taps, 2x Waste 1.25 unslotted, 2x Basin fitting kit, 3x 15mm Thermostatic Blending Valve, 3x Radiators, 3x Radiator valves, 1x Rellocate Water Heater into Store Room, 16lm Copper service feeds, 8x Soil Pipe run inc materials, 2x Waste Pipe run inc materials, 1x Wash Trough Supply and Install Cubicles and Vanity Units Misc 12x Fit Client Dispenser, 1x Final Builders Clean, Organised visits to the school encouraged : 30th March - 2nd April 7th April - 10th April
£75,000
Contract value
To supply and install the replacement flat roof at Dedworth Middle School. Including removal of 4 skylights. Roof size - 212 m2 Site to be cleared of all waste generated by the outlined works. Service life of 30-50 years+ *Installation of Insulation * Supply and fit trim to perimeter *Supply and fit new fascia boards *Removal of Skylights * Scaffolding & access equipment All work to be planned and executed to comply with Health and Safety at work Act 1974 and working at height regulations 2005. Visits to the site are welcomed by appointment only : 30th March 2026 - 2nd April 2026 7th April 2026 - 10th April 2026
£100,000
Contract value
Supply and install replacement roof on B Block *Strip and dispose of existing tiles, roofing batten and membrane * Retile using Double Roman tiles * Supply and install rooflights, dispose of existing skylights * Replace Fascia, Soffit & gutters including downpipes * Supply and erect scaffolding for access * Supply and erect temporary heras fencing * Provide weekly hire of site welfare facilities * Site to be cleared of all waste generated by works Organise visits to site are encouraged to assess the scope of work: 30th March - 2nd April / 7th April - 10th April. Works to be completed through school holiday periods
£350,000
Contract value
Small Plant Room: * Provision of all RAMS prior to commencement of work * Heras fencing to secure area of works during project, including warning signs * Removal and disposal of all associated waste during project * Isolation of current gas, water and electrical supplies to facilitate works * Removal and disposal of existing boilers * Supply and fit 4 x Vaillant Ecotec VU GB 120kw modular boilers * Boilers to be installed in 1 x banks of 4 on manufacturer supplied frames * Supply and install 1 x 480kw insulated plate to plate heat exchangers connected to existing system * Supply and install new gas fired water heater and flue systems * Supply and install pressurisation unit to new boiler system * Alterations to existing BMS system to accept new boilers * Alterations to existing electrical supplies to facilitate new install * Provision of scaffolding for installation of new flue system and connection to boilers *Weather compensation to new boilers * Existing pumps to be retained * Alteration to all existing primary pipework to facilitate installation of new boilers *Installation of phenolic foil faced lagging to all pipework * Manufacturer commissioning to new boilers * Water treatment to existing heating pipework * Provision of M&E file upon completion * Provision of all relevant certification * Provision of contingency amount for asbestos survey and removal if required. Sports Hall Plant Room: * Provide relevant RAMS prior to commencement of work * Apply cordex floor protection to area of work * isolate gas, water and electrical supplies * Remove and dispose of existing combined hot water and boiler unit * Supply and install 2 x new Vaillant ecoTEC 65kw condensing boiler * Alter pipework to boiler room as required * install new 300 litre unvented hot water cylinder * Install back up immersion supplies * Carry out chemical cleans of system * Install 35mm magnaclean magnetic sludge filter * Run new correctly sized gas supply externally from gas meter to new boilers * Run new condensate pipework to new boilers *refill and inhibit system * Balance heating * Provide gas safety certificate *Provide Compliance certificate * Provide manufacturers warranty 5 years * Make good to external brickwork * Clearance of all waste
£160,000
Contract value