Description of project & construction work involved
• Refurbishment and redecoration of cast iron gutters and downpipes, with modification
and replacement of an existing downpipe and gutter.
• Replacement of failing lead-style sheeting and detailing with new lead work over
customer entrance and timber shop front windows
• Removal of existing cement fillet detail/coating and installation of lead flashing to
parapet wall adjoining the neighbouring shop, 'Joules'.
• Removal of live or blown render to both front facing elevations, replace with suitable
lime-based render.
• Timber resin repairs to external joinery, including first floor windows and shop front
windows
• External redecoration of render and joinery.
• Following completion of external works, making good the damaged plaster to the
affected storeroom at first floor level only
refurbishment of 2 properties in Southwold as per the specification attached.
All communication/ enquiries to be directed to North and Hawkins as per the attached documents
THE PROJECT
Name: Proposed Works To Rear Of Hurran Terrace
Nature: To Refurbish The Exterior And Internally To Create New Stores And WC / Shower Room.
Location: Station Road/Blyth Road Junction, Southwold.
Timescale for construction work: 12 weeks.