The Contract primarily involves providing an annual maintenance service and 24 hour a day 365 days a year reactive repairs maintenance service to existing heating installations throughout tenant occupied properties within the Cardonald and Pollokshields areas of Glasgow. The Contract duration is two years (twenty-four months) from the commencement date of 1st October 2024 until 30th September 2026, and will primarily include;
Annual maintenance servicing of Air Source Heat Pump heating installations (approximately 175no properties);
Annual maintenance servicing of Heat Interface Unit installation served by Communal Heating Installations (approximately 231no properties);
Annual maintenance servicing of Unvented Cylinder Heating installations (approximately 291 properties)
Operation and Condition Check of interconnected smoke detectors and heat alarms which shall be replaced by the Contractor where existing alarms are missing; and
An annual reactive maintenance repairs service including replacement of defective parts and components (replacement parts and components up to the value of 100GBP per property) including any part or components requiring replacement that are identified during the annual maintenance service visits to Air Source Heat Pump and Heat Interface Unit installations served by Communal Heating properties only (approximately 406no properties).
Subject to satisfactory performance of the Contractor, which will be assessed through measurement of the Key Performance Indicator’s (Refer Tender Document 8) it is intended that the Contract will be further extended annually in twelve months increments up to a maximum of three years and an overall maximum contract period of five years.
Southside Housing Association is procuring Multi-Lot Contracts which shall deliver Responsive Repairs Maintenance Services during Normal Working Hours throughout Glasgow. The procurement aims to establish individual Contract’s for;
- Lot 1 – Joiner Responsive Maintenance Services to Pollokshields Properties (Service Provider A)
- Lot 2 – Joiner Responsive Maintenance Services to Cardonald Properties (Service Provider B)
- Lot 3 – Plumber Responsive Maintenance Services to Cardonald Properties (Service Provider A)
- Lot 4 – Plumber Responsive Maintenance Services to Pollokshields Properties (Service Provider B)
- Lot 5 – Electrical Responsive Maintenance Services to Pollokshields Properties (Service Provider A)
- Lot 6 – Electrical Responsive Maintenance Services to Cardonald Properties (Service Provider B)
Responsive Repairs services undertaken during daytime hours are currently delivered by City Building LLP to Southside Housing Association as part of a single Service Provider Contract that encompasses Responsive Repairs, Void Property Works, Out of Hours Call Handling and Out of Hours Emergency Works as part of a single Contract. The structure of the existing contract delivered by City Building LLP is changing from a single Service Provider contract to six separate Lots of Responsive Repairs contracts, four separate Lots of Void Property Works contracts and a single contract for Out of Hours Call Handling and Out of Hours Emergency Repairs works. This ITT and procurement relates to procurement of six separate Lots contracts for Responsive Repairs Maintenance Services during daytime hours. The multi-Lot contracts for Void Property Works and single contract for Out of Hours Call Handling and Out of Hours Emergency Repairs are being undertaken as separate procurements to this opportunity.
The properties applicable to each Lot are described within Tender Document E Part 1 and Part 2, and it is intended that the one Service Provider will be appointed to each geographical area for each of the three Responsive Maintenance Service trades of Joiner, Plumber and Electrical.
The properties are anticipated to include sandstone tenement flats, multi-storey flats, new build modern housing and flats, and post war pre-2000 construction houses and flats.
Southside Housing Association may also introduce newly acquired or developed properties during the term of the Contracts and may also vary the tender address list to retain a balanced approximate fifty/fifty split of property allocations between each geographical area throughout the term of the Contracts.
Bidders may submit a bid for each individual or all Lots and should indicate the Lot’s that they wish to bid for within their response to Question 2A.18 of SPD(Scotland) v1.2_0.
Southside Housing Association LtdScotlandWAC-67832
Southside Housing Association is procuring a Contract which shall deliver an Out of Hours Call Handling Service and make safe or complete Out of Hours Emergency Repair Works throughout Glasgow Southside.
Out of Hours Call Handing and Out of Hours Emergency Repairs works are currently delivered by City Building LLP to Southside Housing Association as part of a single Service Provider Contract that encompasses Responsive Repairs, Void Property Works, Out of Hours Call Handling and Out of Hours Emergency Works as part of a single Contract. The structure of the existing contract delivered by City Building LLP is changing from a single Service Provider contract to six separate Lots of Responsive Repairs contracts, four separate Lots of Void Property Works contracts and a single contract for Out of Hours Call Handling and Out of Hours Emergency Repairs works. This ITT and procurement relates to procurement of a single contract for Out of Hours Call Handling and Out of Hours Emergency Repairs works. The multi-Lot contracts for Responsive Repairs and Void Property Works are being undertaken as separate procurements to this opportunity.
The properties applicable to the Contract are described within Tender Document E Part 1 and Part 2, and it is intended that the Service Provider appointed to the Contract will deliver the requirements for all properties described within the tender documentation.
The properties are anticipated to include sandstone tenement flats, multi-storey flats, new build modern housing and flats, and post war pre-2000 construction houses and flats
Southside Housing Association may also introduce newly acquired or developed properties during the term of the Contract.
A maximum of one contractor (the Service Provider) will be appointed to deliver the requirements of the Contract will be executed using the NHF Form of Contract 2011 (Rev 7 :2020) and Version 7.2 of the M3NHF Schedule of Rates.
The duration of the Contract will be for an initial two-year period with optional 1 + 1 + 1 year annual extensions to the Contract Period up to a maximum duration of five years from the Commencement Date.
Southside Housing Association LtdScotlandWAC-67834
The Contract applies to gardens, backcourts and public spaces of tenement flats, modern flats and multi-storey flats along with car parks, private roads, private footpaths and bin lanes belonging to Southside Housing Association within the areas of Pollokshields, Mount Florida, Cathcart, Shawlands, Strathbungo, Ibrox, Kinning Park, Crosshill, Cardonald, Halfway, Penilee, Strathbungo, Pollokshaws and Shawlands. , Glasgow. (refer tender Document 1). The Contract term will be for an initial 2 year period with optional annual 1+1+1 12 month extensions up to a maximum contract duration of five years overall.
The bulk uplift services will be provided seven days a week during normal working hours 52 weeks of the year. The Contractor will be required to complete each Bulk Uplift order (disposing to a Glasgow City Council recycling centre) within 10 calendar days of notification by Southside Housing Association or the date that the Contractor identifies the requirement for a bulk uplift during their weekly drive around of Southside Housing Association’s estates. It is anticipated that orders for bulk uplifts will be issued by Southside Housing Association Monday-Friday during the Contract and Southside Housing Association will not issue orders to the Contractor on a Saturday or Sunday. However, the Contractor will be permitted to undertake the bulk uplift service during normal working hours seven days per week. Although Southside Housing Association require each order for a bulk uplift to be completed within 10 calendar days, the Contractor will be responsible for managing their resources, including public or other holidays of the operatives engaged during the Contract, to ensure each order is completed within the 10 calendar day period.
The Bulk Uplift service is currently delivered by the Estates Team of Southside Housing Association and will cease after 31st October 2025 when the Contractor successful in bidding for this opportunity commences the Contract. Southside Housing Association do not envisage that any of their Estate Team employees currently providing the service will transfer employment to the Contractor successful in bidding for this opportunity and tender costs must be submitted on this basis that TUPE will not apply to the existing workforce.
Detailed information on the requirements of Southside Housing Association for the Contract have been provided within Tender Document 2 (Activity Schedule) and Tender Document 3 (Form of Tender and Schedule of Works).
The anticipated cost per annum of the contract, excluding VAT, is 50000 to 60000 GBP. Bidders are advised that this opportunity represents a different approach to delivering the bulk uplift service to customers of Southside Housing Association. The anticipated value included within this notice is an estimate, as the bulk uplift services sought by this notice represents a new approach to delivering the service to our customers.
Southside Housing Association LtdScotlandWAC-517850
The works comprise Fire Safety Systems servicing and reactive maintenance to the installations within low, medium and high rise residential properties.
Southside Housing Association LtdScotlandWAC-521949
Southside Housing Association is procuring a Multi-Lot Contract which shall deliver Void Property Works throughout Glasgow. The procurement aims to establish individual Contract’s for;
- Lot 1 – Pollokshields Properties Service Provider A
- Lot 2 – Cardonald Properties Service Provider A
- Lot 3 – Cardonald Properties Service Provider B
- Lot 4 – Pollokshields Properties Service Provider B
Void Property works are currently delivered by City Building LLP to Southside Housing Association as part of a single Service Provider Contract that encompasses Responsive Repairs, Void Property Works, Out of Hours Call Handling and Out of Hours Emergency Works as part of a single Contract. The structure of the existing contract delivered by City Building LLP is changing from a single Service Provider contract to six separate Lots of Responsive Repairs contracts, four separate Lots of Void Property Works contracts and a single contract for Out of Hours Call Handling and Out of Hours Emergency Repairs works. This ITT and procurement relates to procurement of four separate Lots contracts for Void Property Works. The multi-Lot contracts for Responsive Repairs and single contract for Out of Hours Call Handling and Out of Hours Emergency Repairs are being undertaken as separate procurements to this opportunity.
The properties applicable to each Lot are described within Tender Document E Part 1 and Part 2, and it is intended that the Service Providers appointed to Lot 1 and Lot 4 will deliver the requirements for the Pollokshields properties listed in Tender Document E Part 2. It is also intended that the Service Providers appointed to Lot 2 and Lot 3 will deliver the requirements for the Cardonald properties listed in Tender Document E Part 1.
The properties are anticipated to include sandstone tenement flats, multi-storey flats, new build modern housing and flats, and post war pre-2000 construction houses and flats. It is anticipated that the approximately number of void properties works undertaken annually for each Lot will range between thirty and fifty void properties. However, this approximate volume of work is not guaranteed and may fluctuate depending on the number of properties that become void during each year of the Contract’s.
Southside Housing Association may also introduce newly acquired or developed properties during the term of the Contracts and may also vary the tender address list to retain a balanced approximate fifty/fifty split of property allocations between each geographical area throughout the term of the Contracts.
Bidders may submit a bid for each individual or all Lots and should indicate the Lot’s that they wish to bid for within their response to Question 2A.18 of SPD(Scotland) v1.2_0.
Southside Housing Association LtdScotlandWAC-67833
Southside Housing Association (and listed partners), have developed this “New Build & CTIW Framework” which will will be offered in (4) Lots and Project, tenders are invited for the following:
Lot 1 - Projects of up to 15 Units on single or multiple sites
Lot 2 - Projects of between 16 and 35 Units on single or multiple sites
Lot 3 - Projects of 36 Units or more on single or multiple sites
Lot 4 - Comprehensive Tenement Improvement Works (CTIW)
Southside Housing Association LtdScotlandWAC-79458
Southside Housing Association is proposing a Storage Heater, PV and Battery Project to serve up to 420 homes mostly owned by Southside Housing Association in blocks of flats at a number of sites in Glasgow.
It is Southside Housing Association Ltd.’s intention to enter into a contract with one contractor to deliver their Electrical Safety and Portable Appliance Testing Contract in Glasgow South. All works to be in accordance with the Current Edition of the IEE Wiring Regulations.
Southside Housing Association Ltd.ScotlandWAC-156813
The works comprise Fire Safety Systems servicing and reactive maintenance to the installations within low, medium and high rise residential properties.
Southside Housing Association Ltd.ScotlandWAC-156820
Inspect electrical installations for physical damage, wear and tear, loose connections, and other visual issues. The system should be checked and tested to ensure it meets current legislation including insulation resistance, earth fault loop impedance and continuity testing. In all instances an EICR report should include a detailed record of the inspection and testing, identifying and faults and con compliances. The report should also include recommendations for remedial works.
Southside Housing Association is seeking to enter into a contract with a suitably experienced contractor for the provision of an all inclusive annual servicing and reactive maintenance contract to their passenger lift installations in Glasgow for a three year period commencing 1 December 2022 to 30 November 2025 with the possibility of contract extensions up to a maximum of two additional years in total. The total number of properties with lifts is 44 (49 lifts in total) and includes low, medium and high rise properties.
The works comprise of Legionella Monitoring and Water Hygiene Services both planned and reactive to domestic and communal water systems within various properties as detailed in the Asset Register.
Southside Housing Association Ltd.ScotlandWAC-278325
The work to be carried out under this Contract consists of the full maintenance regime of the mechanical & hot water distribution system, comprising boilers, heating & hot water pump units, all associated pipework and all in accordance with the Employers Requirements.
Southside Housing Association Ltd.ScotlandWAC-180561
The Contract will involve gutter cleaning maintenance and roof inspection services throughout Glasgow. The Contract will principally include;
Gutter cleaning maintenance; and
Roof inspection services and a comprehensive report prepared by the Contractor for each property.
The Contract may also include cleaning of roof skews, valleys and flashings, moss removal, and also minor remedial, repair and improvement works to the existing roof finishes, drainage and disposal systems and roof services resulting from the Contractor’s roof inspection and report to each property.
Southside Housing Association intend to enter into a Two Measured Term Contract with a Single Contractor to undertake all services required annually, as described within the Pricing Matrices incorporated within Tender Document A.
The commencement date for the Measured Term Contract is currently estimated to be 2nd December 2024 and the completion date for the Year 1 (2024-2025) services is eighteen calendar weeks after the commencement date.
Subject to satisfactory performance of the Contractor, which will be assessed through measurement of the Key Performance Indicator’s (Refer Tender Document H), it is intended that the Contract will be extended on an annual basis by a maximum of three further years until 2029. Orders for future gutter cleaning maintenance services may be placed by Southside Housing Association during Years One-Five, or at any point until expiry of the Measured Term Contract (maximum of five years from the date of entering into the Contract).
Southside Housing Association LtdScotlandWAC-15855
Southside Housing Association is procuring a Contract which shall deliver Responsive Maintenance Roof Repair Services and Minor Works throughout the Cardonald and Pollokshields areas of Glasgow.
The properties applicable to the Contract are described within Tender Document E Part 1 and Part 2, and it is intended that that one Service Provider will be appointed to deliver all requirements for all properties listed in Tender Document E Part 1 and Part 2 that are located in the Cardonald and Pollokshields areas of Glasgow.
The properties are anticipated to include pre-1919 sandstone tenement flats and houses, new build modern housing and flats including multi-storey properties, and post war pre-2000 construction houses and flats. The approximate volume of work and the annual quantity of Responsive Maintenance Roof Repairs and Minor Works is not guaranteed, and may fluctuate depending on the volume of repairs reported by customers of Southside Housing Association during each year of the Contract.
Southside Housing Association may also introduce newly acquired or developed properties during the term of the Contract within Glasgow throughout the term of the Contracts.
One contractor (the Service Provider) will be appointed to deliver the requirements of Southside Housing Association that are described in the tender documents and the Contract will be executed using the NHF Form of Contract 2011 (Rev 7 :2020) and Version 7.2 of the M3NHF Schedule of Rates
The duration of the Contract will be for an initial two-year period with optional 1 + 1 + 1 year annual extensions to the Contract Period up to a maximum duration of five years from the Commencement Date.
The complete standard suite of M3NHF Schedule of Rates shall not be applied during the Contract and it is the intention of Southside Housing Association that only the Schedule of Rates stated within ‘Tender Document A – Price Framework – Roofing Repairs’ shall apply during the Contract. Tenderers shall not be held to the standard rates within Version 7.2 of the M3NHF Schedule of Rates and Tenderers may price each item within Tender Document A with complete commercial freedom as they consider appropriate. The rates entered by Tenderers within Tender Document A will be held for one year from the Commencement Date of the Contract and adjusted for inflation within the rules of Clause 9.4 of the Contract Conditions thereafter.
Southside Housing Association intend to issue Orders for Responsive Repairs Maintenance works to the Service Provider during the term of the Contract. However, no specific values or any volumes of work are guaranteed to the Service Provider during the term of the Contract.
Southside Housing Association LtdScotlandWAC-15887