Loading page content…
Loading page content…
73 matching contracts · Updated daily · Contracts Finder + Find a Tender Service
Modification Notice Original description: The works and services will comprise all types of Construction works and services, including design and other services as required to design, develop and construct the works. The specific works and services that may be procured under the framework cannot be clearly defined at this stage, however the nature and types of works that may be required may include those services identified by CPV code on or in connection with any land or property and related asset owned, rented, leased or developed by any of the public sector bodies eligible to use the Framework, or on property or related assets in which any of the public sector bodies may have an interest at the time or prospectively and may include projects in the following sectors amongst others:- education, housing, blue light, health, offices, transport, military, industrial and commercial buildings and other public sector operational buildings and establishments. Description of the modifications Due to unforeseen increase in inflation globally it has become apparent that proposed projects are more expensive than originally estimated and no longer align with Framework value bands. We therefore intend to vary the value bands increasing these using BCIS indices under the existing National Construction Framework through a Regulation 72(1)(c) Public Contracts Regulations 2015 permitted modification. The overall Framework value will not be altered, and no other changes will be made. Description of the circumstances which rendered the modification necessary and explanation of the unforeseen nature of these circumstances: No extra works are needed. A change of contractor will not ensure the Framework is delivered as awarded. Projects intended to fit within certain value bands no longer fit within these due to increased inflation. Modifying will allow projects to be allocated to value bands as originally intended at award. This is a permitted modification; the inflation increase was unforeseen; the Framework's overall nature will not alter and the increase will not be 50% or more of the original Framework value.
£12,000,000,000
Contract value
Modification Notice Original description: The works and services will comprise all types of Construction works and services, including design and other services as required to design, develop and construct the works. The specific works and services that may be procured under the framework cannot be clearly defined at this stage, however the nature and types of works that may be required may include those services identified by CPV code on or in connection with any land or property and related asset owned, rented, leased or developed by any of the public sector bodies eligible to use the Framework, or on property or related assets in which any of the public sector bodies may have an interest at the time or prospectively and may include projects in the following sectors amongst others:- education, housing, blue light, health, offices, transport, military, industrial and commercial buildings and other public sector operational buildings and establishments. Description of the modifications Due to unforeseen increase in inflation globally it has become apparent that proposed projects are more expensive than originally estimated and no longer align with Framework value bands. We therefore intend to vary the value bands increasing these using BCIS indices under the existing National Construction Framework through a Regulation 72(1)(c) Public Contracts Regulations 2015 permitted modification. The overall Framework value will not be altered, and no other changes will be made. Description of the circumstances which rendered the modification necessary and explanation of the unforeseen nature of these circumstances: No extra works are needed. A change of contractor will not ensure the Framework is delivered as awarded. Projects intended to fit within certain value bands no longer fit within these due to increased inflation. Modifying will allow projects to be allocated to value bands as originally intended at award. This is a permitted modification; the inflation increase was unforeseen; the Framework's overall nature will not alter and the increase will not be 50% or more of the original Framework value.
£12,000,000,000
Contract value
Modification Notice Original description: The works and services will comprise all types of Construction works and services, including design and other services as required to design, develop and construct the works. The specific works and services that may be procured under the framework cannot be clearly defined at this stage, however the nature and types of works that may be required may include those services identified by CPV code on or in connection with any land or property and related asset owned, rented, leased or developed by any of the public sector bodies eligible to use the Framework, or on property or related assets in which any of the public sector bodies may have an interest at the time or prospectively and may include projects in the following sectors amongst others:- education, housing, blue light, health, offices, transport, military, industrial and commercial buildings and other public sector operational buildings and establishments. Description of the modifications Due to unforeseen increase in inflation globally it has become apparent that proposed projects are more expensive than originally estimated and no longer align with Framework value bands. We therefore intend to vary the value bands increasing these using BCIS indices under the existing National Construction Framework through a Regulation 72(1)(c) Public Contracts Regulations 2015 permitted modification. The overall Framework value will not be altered, and no other changes will be made. Description of the circumstances which rendered the modification necessary and explanation of the unforeseen nature of these circumstances: No extra works are needed. A change of contractor will not ensure the Framework is delivered as awarded. Projects intended to fit within certain value bands no longer fit within these due to increased inflation. Modifying will allow projects to be allocated to value bands as originally intended at award. This is a permitted modification; the inflation increase was unforeseen; the Framework's overall nature will not alter and the increase will not be 50% or more of the original Framework value.
£12,000,000,000
Contract value
Modification Notice Original description: The works and services will comprise all types of Construction works and services, including design and other services as required to design, develop and construct the works. The specific works and services that may be procured under the framework cannot be clearly defined at this stage, however the nature and types of works that may be required may include those services identified by CPV code on or in connection with any land or property and related asset owned, rented, leased or developed by any of the public sector bodies eligible to use the Framework, or on property or related assets in which any of the public sector bodies may have an interest at the time or prospectively and may include projects in the following sectors amongst others:- education, housing, blue light, health, offices, transport, military, industrial and commercial buildings and other public sector operational buildings and establishments. Description of the modifications Due to unforeseen increase in inflation globally it has become apparent that proposed projects are more expensive than originally estimated and no longer align with Framework value bands. We therefore intend to vary the value bands increasing these using BCIS indices under the existing National Construction Framework through a Regulation 72(1)(c) Public Contracts Regulations 2015 permitted modification. The overall Framework value will not be altered, and no other changes will be made. Description of the circumstances which rendered the modification necessary and explanation of the unforeseen nature of these circumstances: No extra works are needed. A change of contractor will not ensure the Framework is delivered as awarded. Projects intended to fit within certain value bands no longer fit within these due to increased inflation. Modifying will allow projects to be allocated to value bands as originally intended at award. This is a permitted modification; the inflation increase was unforeseen; the Framework's overall nature will not alter and the increase will not be 50% or more of the original Framework value.
£12,000,000,000
Contract value
Modification Notice Original description: The works and services will comprise all types of Construction works and services, including design and other services as required to design, develop and construct the works. The specific works and services that may be procured under the framework cannot be clearly defined at this stage, however the nature and types of works that may be required may include those services identified by CPV code on or in connection with any land or property and related asset owned, rented, leased or developed by any of the public sector bodies eligible to use the Framework, or on property or related assets in which any of the public sector bodies may have an interest at the time or prospectively and may include projects in the following sectors amongst others:- education, housing, blue light, health, offices, transport, military, industrial and commercial buildings and other public sector operational buildings and establishments. Description of the modifications Due to unforeseen increase in inflation globally it has become apparent that proposed projects are more expensive than originally estimated and no longer align with Framework value bands. We therefore intend to vary the value bands increasing these using BCIS indices under the existing National Construction Framework through a Regulation 72(1)(c) Public Contracts Regulations 2015 permitted modification. The overall Framework value will not be altered, and no other changes will be made. Description of the circumstances which rendered the modification necessary and explanation of the unforeseen nature of these circumstances: No extra works are needed. A change of contractor will not ensure the Framework is delivered as awarded. Projects intended to fit within certain value bands no longer fit within these due to increased inflation. Modifying will allow projects to be allocated to value bands as originally intended at award. This is a permitted modification; the inflation increase was unforeseen; the Framework's overall nature will not alter and the increase will not be 50% or more of the original Framework value.
£12,000,000,000
Contract value
Modification Notice Original description: The works and services will comprise all types of Construction works and services, including design and other services as required to design, develop and construct the works. The specific works and services that may be procured under the framework cannot be clearly defined at this stage, however the nature and types of works that may be required may include those services identified by CPV code on or in connection with any land or property and related asset owned, rented, leased or developed by any of the public sector bodies eligible to use the Framework, or on property or related assets in which any of the public sector bodies may have an interest at the time or prospectively and may include projects in the following sectors amongst others:- education, housing, blue light, health, offices, transport, military, industrial and commercial buildings and other public sector operational buildings and establishments. Description of the modifications Due to unforeseen increase in inflation globally it has become apparent that proposed projects are more expensive than originally estimated and no longer align with Framework value bands. We therefore intend to vary the value bands increasing these using BCIS indices under the existing National Construction Framework through a Regulation 72(1)(c) Public Contracts Regulations 2015 permitted modification. The overall Framework value will not be altered, and no other changes will be made. Description of the circumstances which rendered the modification necessary and explanation of the unforeseen nature of these circumstances: No extra works are needed. A change of contractor will not ensure the Framework is delivered as awarded. Projects intended to fit within certain value bands no longer fit within these due to increased inflation. Modifying will allow projects to be allocated to value bands as originally intended at award. This is a permitted modification; the inflation increase was unforeseen; the Framework's overall nature will not alter and the increase will not be 50% or more of the original Framework value.
£12,000,000,000
Contract value
SCAPE on behalf of Arc Partnership is looking to appoint a supplier for the Maintenance of Portable Firefighting Equipment at various locations across Nottinghamshire, Derbyshire, South Yorkshire and Leicestershire, at its Client's properties. Arc require a single supplier for a seamless delivery of the following: • Repairs, servicing, and maintenance of portable firefighting equipment • Commissioning of new firefighting equipment • Signage • Additional associated services The initial framework duration will be two years with an option to extend by two additional years up to a maximum of four years (2+1+1) at the discretion of Arc Partnership. Arc Partnership is an innovative joint venture developed by Nottinghamshire County Council and SCAPE.
£170,000
Contract value
SCAPE on behalf of Arc Partnership is looking to appoint a supplier for the Maintenance of Portable Firefighting Equipment at various locations across Nottinghamshire, Derbyshire, South Yorkshire and Leicestershire, at its Client's properties. Arc require a single supplier for a seamless delivery of the following: • Repairs, servicing, and maintenance of portable firefighting equipment • Commissioning of new firefighting equipment • Signage • Additional associated services The initial framework duration will be two years with an option to extend by two additional years up to a maximum of four years (2+1+1) at the discretion of Arc Partnership. Arc Partnership is an innovative joint venture developed by Nottinghamshire County Council and SCAPE.
£170,000
Contract value
Modification Notice Original description: Please note that this is an award notice and is not a current opportunity. The original notice was as follows: The works will comprise all types of Construction and associated services and may include design and other services as required to deliver External Works. The nature and types of works that may be required may include those Works and Services identified by Common Procurement Vocabulary (CPV) codes and those identified within the Specification document for this Lot. The work is to take place in the East Midlands (UKF) and South Yorkshire (UKE3). The minimum annual turnover requirement for this Lot is £600,000.00. Bidders are advised that if bidding for the maximum number of Lots (2) they must meet the combined annual turnover requirement of both Lots. A total of up to 4 Contractors will be appointed to this Lot upon bidding successfully at the ITT stage. Description of the modifications Modification and increase to the contract award value. Description of the circumstances which rendered the modification necessary and explanation of the unforeseen nature of these circumstances: Since the award of lot 6 (ref Arc108.6) Arc Partnership have seen a considerable increase in work requiring the removal of asbestos as well as an increase due to external financial pressures. We are therefore modifying and increasing the contract award value to provide sufficient time to allow for a separate procurement and contract to be established.
£6,280,000
Contract value
Scape Group Limited on behalf of Arc Partnership are looking to establish a Framework Agreement for the supply of Building Works and Services. Applications are invited from experienced providers of construction (building) works and services who can provide high quality works and services using a customer focused approach particularly in the public sector. It is anticipated that the works and services will be provided by the providers themselves and/or through their supply chain. Consortia bids will be accepted. The specific works and services that may be procured under the framework cannot be clearly defined at this stage, however the nature and types of works that may be required may include those works or services identified by CPV code on or in connection with any land or property and related asset owned, rented, leased or developed by any of the public sector bodies eligible to use the framework.
£16,500,000
Contract value
Scape Group Limited on behalf of Arc Partnership are looking to establish a Framework Agreement for the supply of Building Works and Services. Applications are invited from experienced providers of construction (building) works and services who can provide high quality works and services using a customer focused approach particularly in the public sector. It is anticipated that the works and services will be provided by the providers themselves and/or through their supply chain. Consortia bids will be accepted. The specific works and services that may be procured under the framework cannot be clearly defined at this stage, however the nature and types of works that may be required may include those works or services identified by CPV code on or in connection with any land or property and related asset owned, rented, leased or developed by any of the public sector bodies eligible to use the framework.
£16,500,000
Contract value
Scape Group Limited on behalf of Arc Property Services Partnership Limited are looking to appoint a single service provider to provide servicing and maintenance for lifts and hoists within various public buildings primarily throughout the Nottinghamshire area, but also some properties within the UKF NUTS area (Derbyshire, Leicestershire, Lincolnshire) and South Yorkshire (UKE3). It is anticipated that the works and services will be provided by the provider themselves and/or through their supply chain. Consortia bids will be accepted.
£600,000
Contract value
SCAPE is procuring this framework on behalf of Arc Property Services Partnership Limited (Arc Partnership). Arc Partnership is an innovative joint venture developed by Nottinghamshire County Council and Scape Group. This framework is for the provision of mechanical and electrical engineering works for Arc Partnership. Applications are invited from experienced providers of Mechanical and Elelctrical Engineering works and services who can provide high quality, whilst using a customer focused approach particularly in the public sector. The specific works and services that may be procured under the Framework cannot be clearly defined at this stage, however the nature and types of works that may be required may include those services identified by CPV code on or in connection with any land or property and related asset owned, rented, leased or developed by Nottinghamshire County Council and Arc Partnership.
£16,000,000
Contract value
SCAPE is procuring this framework on behalf of Arc Property Services Partnership Limited (Arc Partnership). Arc Partnership is an innovative joint venture developed by Nottinghamshire County Council and Scape Group. This framework is for the provision of mechanical and electrical engineering works for Arc Partnership. Applications are invited from experienced providers of Mechanical and Elelctrical Engineering works and services who can provide high quality, whilst using a customer focused approach particularly in the public sector. The specific works and services that may be procured under the Framework cannot be clearly defined at this stage, however the nature and types of works that may be required may include those services identified by CPV code on or in connection with any land or property and related asset owned, rented, leased or developed by Nottinghamshire County Council and Arc Partnership.
£16,000,000
Contract value
SCAPE on behalf of Arc Property Services Partnership Ltd, will soon be issuing a contract notice for a new Framework Contract for scaffolding services across various locations within the Nottinghamshire, Derbyshire, South Yorkshire and Leicestershire area, at its Client's properties. This notice is not an invitation for formal expressions of interest. The purpose of this PIN is to commence the pre-procurement, market engagement phase before the start of a formal procurement process. If you wish to receive further details, please contact roberth@scape.co.uk.
£1,500,000
Contract value
SCAPE on behalf of Arc Property Services Partnership Ltd (the Client), will soon be issuing a contract notice for a new Framework Contract for site set up and establishment services across various locations within the Nottinghamshire, Derbyshire, South Yorkshire and Leicestershire area. This notice is not an invitation for formal expressions of interest. The purpose of this PIN is to commence the pre-procurement, market engagement phase before the start of a formal procurement process. If you wish to receive further details, please contact roberth@scape.co.uk.
£1,000,000
Contract value
SCAPE on behalf of Arc Property Services Partnership Ltd, are seeking to set up a new Framework Contract for scaffolding services across various locations within the Nottinghamshire, Derbyshire, South Yorkshire and Leicestershire areas. The NEC4 Framework Contract will be used to assist the Client in conducting their repairs, maintenance, servicing and construction works
£1,500,000
Contract value
NOTE: This notice was updated on 23 February 2023 for the following reason: Additional information added: Please note: Arc Partnership reserve the right to establish communication with awarded Contractors, prior to the Framework start date.(SCAPE on behalf of Arc Property Services Partnership Ltd, are seeking to set up a new Framework Contract for external works across various locations within the Nottinghamshire, Derbyshire, SouthYorkshire and Leicestershire areas. The NEC4 Framework Contract will be used to assist the Client in conducting their repairs, maintenance, servicing and construction works. Please note: No warranty is given to the Supplier by neither SCAPE or ArcProperty Services Partnership Ltd (the Client) as to the amount (if any) or nature of the service and/or work whichmay be required to be carried out by the Supplier during the Framework Contract period and no claim for compensation either contractual or otherwise will be accepted in respect of any variation in the volume of the work. The service comprises of a number of elements including, but not limited to: Eradication of plant growth. Site dewatering and pumping. Ground gas venting measures. Temporary diversion works Site preparation works Roads, paths, paving's and surfacings Soft landscaping, planting and irrigation systems Fencing, railings and walls External fixtures External services Full drainage survey of existing systems Design of new drainage systems Temporary drainage Lowest floor construction External drainage The framework will be in place for a period of 2 years, with the option to extend for 2 periods of 1 year (2 + 1 + 1 = maximum 4 years). Projects will vary in value but as an indication (based on the last 12 months), they may be: £1-£10K (70%) £11K - £25K(17%) £26K - £50K (13%) The Procurement will be conducted in 2 stages: Stage 1 - Selection Stage - Bidders must meet all off the necessary selection criteria and provide answers to the questions asked. The questions will be marked by a panel and the top 8 scoring Bidders will progress on to Stage 2. Stage 2 - Award Stage - Bidders will be evaluated on their submitted prices and answers to specific quality questionsin order to achieve a price/quality score. The top 4 scoring Bidders will be invited to enter the Framework. Full details of the process can be found within the tender documents.) Additional information: The contracting authority considers that this contract may be suitable for economic operators that are small or medium enterprises (SMEs). However, any selection of tenderers will be based solely on the criteria set out for the procurement.
From £1,000,000
Contract value
SCAPE on behalf of Arc Property Services Partnership Ltd, are seeking to set up a new Framework Contract for external works across various locations within the Nottinghamshire, Derbyshire, SouthYorkshire and Leicestershire areas. The NEC4 Framework Contract will be used to assist the Client in conducting their repairs, maintenance, servicing and construction works. Please note: No warranty is given to the Supplier by neither SCAPE or ArcProperty Services Partnership Ltd (the Client) as to the amount (if any) or nature of the service and/or work whichmay be required to be carried out by the Supplier during the Framework Contract period and no claim for compensation either contractual or otherwise will be accepted in respect of any variation in the volume of the work. The service comprises of a number of elements including, but not limited to: Eradication of plant growth. Site dewatering and pumping. Ground gas venting measures. Temporary diversion works Site preparation works Roads, paths, paving's and surfacings Soft landscaping, planting and irrigation systems Fencing, railings and walls External fixtures External services Full drainage survey of existing systems Design of new drainage systems Temporary drainage Lowest floor construction External drainage The framework will be in place for a period of 2 years, with the option to extend for 2 periods of 1 year (2 + 1 + 1 = maximum 4 years). Projects will vary in value but as an indication (based on the last 12 months), they may be: £1-£10K (70%) £11K - £25K(17%) £26K - £50K (13%) The Procurement will be conducted in 2 stages: Stage 1 - Selection Stage - Bidders must meet all off the necessary selection criteria and provide answers to the questions asked. The questions will be marked by a panel and the top 8 scoring Bidders will progress on to Stage 2. Stage 2 - Award Stage - Bidders will be evaluated on their submitted prices and answers to specific quality questionsin order to achieve a price/quality score. The top 4 scoring Bidders will be invited to enter the Framework. Full details of the process can be found within the tender documents. Additional information: The contracting authority considers that this contract may be suitable for economic operators that are small or medium enterprises (SMEs). However, any selection of tenderers will be based solely on the criteria set out for the procurement.
From £1,000,000
Contract value
SCAPE on behalf of Arc Property Services Partnership Ltd, are seeking to set up a new Framework Contract for construction across various locations within the Nottinghamshire, Derbyshire, SouthYorkshire and Leicestershire areas. The NEC4 Framework Contract will be used to assist the Client in conducting their repairs, maintenance, servicing and construction works. Please note: No warranty is given to the Supplier by neither SCAPE or ArcProperty Services Partnership Ltd (the Client) as to the amount (if any) or nature of the service and/or work whichmay be required to be carried out by the Supplier during the Framework Contract period and no claim for compensation either contractual or otherwise will be accepted in respect of any variation in the volume of the work. The service comprises of a number of elements including, but not limited to: •Demolitions •Site preparations •Substructures •Superstructures - Building frames •Superstructures - Roofs •Superstructures - Stairs and ramps •Superstructures - External walls •Superstructures - Windows and external doors •Superstructures - Internal walls and partitions •Superstructures - Internal doors •Internal finishes •Installation of furniture, fittings & equipment •Prefabricated buildings and building units •Works to existing buildings The framework will be in place for a period of 2 years, with the option to extend for 2 periods of 1 year (2 + 1 + 1 = maximum 4 years). Projects will vary in value but as an indication (based on the last 12 months), they may be: £1-£10K (39%) £11K - £25K(15%) £26K - £50K (23%) £50K - £100K (19%) £100K+ (4%) The Procurement will be conducted in 2 stages: Stage 1 - Selection Stage - Bidders must meet all off the necessary selection criteria and provide answers to the questions asked. The questions will be marked by a panel and the top 8 scoring Bidders will progress on to Stage 2. Stage 2 - Award Stage - Bidders will be evaluated on their submitted prices and answers to specific quality questionsin order to achieve a price/quality score. The top 4 scoring Bidders will be invited to enter the Framework. Full details of the process can be found within the tender documents. Additional information: The contracting authority considers that this contract may be suitable for economic operators that are small or medium enterprises (SMEs). However, any selection of tenderers will be based solely on the criteria set out for the procurement.
From £1,000,000
Contract value
Showing 1–20 of 73 contracts